Loading...
ST0301-CS030923INNOVATIVE APPRO,4CHES...PRA CTICAL RESULTS MEETING MINUTES Project: Subject: Recorded By: Date: Location: Attendees: Bethel Road/Coppell Road Reconstruction City of Coppell, Texas Meeting Minutes No. 1 FINAL Conceptual Design Review Comments Tricia Hatley, Chris Moorman, Tammy Hoelscher September 23, 2003 Coppell City Hall, City Engineer's Office City of Coppell (CITY) Ken Griffin (KG) and Suzan Taylor (ST) Freese and Nichols (FNI) Tricia Hatley (THH), Tammy Hoelscher (TAH) and Chris Moorman (CLM). Handouts: Agenda, Bridge Profile and Section. The following reflects our understanding of the items discussed during the subject meeting. If you do not notify us within five working days, we will assume that you are in agreement with our understanding. Item Description Action By 1.00 TECHNICAL 1.01 Introductions/PACER The meeting began at approximately 3:00 pm. Tricia Hatley introduced Tammy Hoelscher to city staff. 1.02 Bridge Elevations Tricia Hatley went over the findings of the hydraulic study and discussed water surface elevations (WSE) of the existing model and the ultimate developed watershed. Ken Griffin and Tricia Hatley discussed impacts concerning adjacent property owners. Ken Griffin wanted FNI to verify the location of the 496 elevation and study cross sections west of the bridge to effectively manage drainage and the impacts to the adjacent property owners. Ken Griffin also noted that the proposed Right-Of-Way in front of the Wendy Webster property should not include the existing rock columns on the property. Freese and Nichols, Inc. * Engineers · Environmental Scientists - Architects 1701 N. Market St. - Suite 500 LB51 · Dallas, Texas 75202 214-920-2500 ,, Fax214-920-2565 [CPL03243]C:\Docurnents and Settings\kgriffin.ClTY_COPPELL\Local Settings\Temporary Internet Files\OLK159\meeting minutes0923031.doc INNOV/tTIVE /IPPROACHES,..PR~4CTICAL RESULTS .03 Coordination at Freeport Parkway Tricia Hatley discussed problems with obtaining information from Transystems and coordinating survey data discrepancies. .04 Review Comments Suzan Taylor discussed the city's comments from the conceptual submittal. They are as follows: · Coppcll Road typical section, 33' or 34' b/c dimension. · Keep sidewalk and walking trail on both sides of roadway from Coppell Road west to Freeport Parkway. · Tidy up pattern hatching to terminate at driveways. · Suzan noted that thc city owns thc tract of land at 799 Coppell (property information was given to FNI). · Farmer's Market should also consider truck turning movements. · Adjust driveway west of Mitchell Street. · Thc city wants to leave out thc proposed street connecting Bethel Rd. and Coppell Rd. (south) and terminate Bethel Rd. improvements at the curb returns at the same width as Coppell Rd. (north) and transition back to thc existing pavement on Coppell Rd. (south). · The driveway at approx. Sta. 19+50 should be kept. Ken Griffin instructed to take out thc parking in front of the property and provide a driveway to the existing property owner. Ken Griffin noted that the city has not purchased that property yet, · Suzan Taylor indicated that parallel parking in the Old Downtown plan is to be eliminated. Also, indicated was ADA compliance and questioned whether cars backing out could cross into a crosswalk. FNI will investigate and adjust the plans accordingly. · Suzan Taylor also indicated that Bethel Road Estates (234 Bethel Rd.) was not shown on the plans and noted that we could get a copy of the subdivision plans to indicate on our plans. · Ken Griffin also enquired about median delineation at the N. Denton Tap intersection. Ken Griffin suggested a 6' grass median for delineation and gave the location ora model of what he would like to see for this intersection. The model is located at Winnpage & Denton Tap Rd. Ken Griffin also indicated that the property lines would be 300 feet deep and that our median should begin at Freeseand Nichols, Inc. · Engineers * EnvironmentelScientisl~ * Architects 1701 N. Market St. · Suite 500 LB51 ', Dallas, Texas 75202 214-920-2500 · Fax214-920-2565 [CPL03243]C:\Documents and Settings\kgriffin.CITY_COPPELL\Local Settings\Temporary Intemet Files\OLK159\meeting minutes0923031.doc INNOVATIVE APPROACHES...PRACTICAL RESULTS the intersection and terminate approx. 230 feet west and provide an opening for access to those properties offofBethel Rd. Pavement striping should delineate from the end of the median to the point of transition. · Tricia Hatley asked if there was a preference on where the Coppell Rd improvements would terminate, north or south of Cooper Street? Suzan Taylor would contact FNI with direction on the Coppell Road improvements limits. · Suzan Taylor also reminded FNI of bridge rails on the culvert under Coppell Rd. Tricia Hatley noted that the geotechnical investigation should begin very soon in order to verify a pavement design and paving quantities. Ken Griffin indicated that a traffic control plan should be submitted when working in the city's streets and two flaggers must be present when shutting down a lane for drilling purposes. 1.05 Public Meeting Follow-up Tricia Hatley read over the minutes from the previous Public Meeting held on September 1, 2003. The highlights of the meeting were to eliminate parallel parking and add a turn lane at Coppell Road. Ken Griffin stated that the speed limit should be 25 mph from Coppell Rd. (south) to west of Loch Lane. Ken Griffin also indicated on the last page of the public meeting minutes, to be sure and include comments 1, 6, and 7. Tricia Hatley suggested the use of any traffic calming measures (e.g. traffic buttons, trees behind the curbs, etc.) and Ken Griffin did not think those items suggested would be practical for this project. Ken Griffin did suggest using stamped concrete over Pavestone for pavement texturing in the Old Downtown area. 2.00 GENERAL 2.01 Action Items Obtain copies of the Bethel Road Estates subdivision plans and a clearer CLM copy of the City of Coppell paving and drainage standards. Meeting adjourned at approximately 4:15 pm. Freese and Nichols, Inc. '. Engineers · Environmental Scientists · Architects 1701 N. Market St. * Suite 500 LB51 ,. Dallas, Texas 75202 214-920-2500 · Fax214-920-2565 [CPL03243]C:\Documents and Settings~kgriffin.ClTY_COPPELL\Local Settings\Temporary Internet Files\OLK159\meeting minutes0923031.doc