Loading...
Valley R Baptist 2-LR030710July 10, 2003 Mr. Robert Feille Beck Group 1501 East Belt Line Road Coppell, Texas 75019 RE: Final Inspection Letter Valley Ranch Baptist Church Coppell, Texas Project No.: 94021265 Report No.: 94021265.0207 Dear Mr. Feille: I rerracon 8901 Carpenter Freeway, Suite 100 Dallas, Texas 75247 (214) 630 -1010 Fax: (214) 630-7070 Representatives of HBC /Terracon performed observation and testing services at the above referenced project. The following services were performed: Drilled Pier Installation Observation Utility Backfill and subgrade compaction testing Reinforcing Steel Placement Observation Concrete Observation and Strength Testing Structural Steel Observation Our services were provided on a call-out basis. Pier observation was provided on a full -time basis. Based on our review of the written reports for this work, it is our opinion that the work observed was, to the best of our knowledge, in general accordance with the contract documents. It has been our pleasure to provide these services on this project. If you have any questions regarding this letter or need additional services, please contact us. Yours very truly, HBC/TERRACON C Ku'ssein H. Abusaad','F. Senior Project Manager Cc: Distribution Proudly Serving Texas Austin ■ Dallas ■ Fort Worth ■ Houston ■ Texas City Arizona ■ Arkansas ■ California ■ Colorado ■ Georgia ■ Idaho ■ Illinois \ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri Montana ■ Nebraska ■ Nevada ■ New Mexico ■ North Carolina ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming Consulting Engineers & Scientists Since 1965 www- terracon.com