Valley R Baptist 2-LR030613CONCRETE COMPRESSIVE STRENGTH TEST lfer con
Report Number: 94021265.0195
Service Date: May 16, 2003 Dallas, Te Texas 75247
(214) (214) 630 -1010
Client: Valley Ranch Baptist Church Report Date: ,tune 13, 2003
Attn: Robert Feille Project: Valley Ranch Baptist Church
1501 East Belt Line Road 1501 East Belt Line Rd
Coppell TX 75019 Coppell, TX
Project Number: 94021265
Material Information
Specified Strength: 4000 psi @ 28 Days
Batch Time: 12:39pm Plant: 2
Supplier: LMC
Truck No: 821
Mix I.D. No.: 5409
Water Added Onsite Before Test:
Water Added Onsite After Test:
Field Test Data
Test
Result
Slump, inches:
4.75
Air Content, %:
4.3
Concrete Temperature, 0 F:
91
Ambient Temperature, 0 F:
90
Plastic Unit Weight, pcf:
28.27
Laboratory Test Data
2
Set
Specimen
Diameter
Area
No.
ID
(inches)
( sq. inches
1
1
6.00
28.27
1
2
6.00
28.27
1
3
6.00
28.27
1
4
6.00
28.27
Ticket No: 3159592
10 Gallons
5 Gallons
Sample Information
Sample Time: 1:20pm Date Cast: May 16, 2003
Technician: Christopher D. Harbour
Weather Conditions: Cloudy
Accumulative Yards: 90
Placement Method: Direct Discharge
Sample Locations: See placement location
Placement Location: Paving - See attached sketch
Specification Test Method
ASTM C -143
ASTM C -231
ASTM C1064
ASTM C -1064
Comments: Not tested for plastic unit weight.
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
Technician: Christopher D. Harbour
Report Distribution: HBC/Terracon
(1) HKS Inc (1) City of Coppell TX
(1) Rogers O'Brien Construction Cc (1) City of Coppell TX Reviewed by
(1) Brockette Davis Drake Husse H. Abusaad, P.E.
(1) Valley Ranch Baptist Church
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1
Age at
Maximum Compressive
Date
Test
Load
Strength
Tested
(days)
(lbs)
(psi)
05/23/2003
7
102,100
3,610
05/23/2003
7
100,620
3,560
Average
3,590
06/13/2003
28
130,200
4,600
06/13/2003
28
128,860
4,560
Average
4,580
Comments: Not tested for plastic unit weight.
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
Technician: Christopher D. Harbour
Report Distribution: HBC/Terracon
(1) HKS Inc (1) City of Coppell TX
(1) Rogers O'Brien Construction Cc (1) City of Coppell TX Reviewed by
(1) Brockette Davis Drake Husse H. Abusaad, P.E.
(1) Valley Ranch Baptist Church
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1
3
." O
K
EXi5i r1
ORI �LJ
�I Cq
AGOBSTICAN ACOUSTIC DIM NSION5
OF TEXAS, INC
LANDSCAPE DESIGN
BLOOMING COLONS NURSERY
t LANDSCAPING INC.
FOOD SERVICE CONSULTANT
SYSTEMS DESIGN
INTERNATIONAL
GENEItAL CONRGICTOR
ROGERS O'SIBEN
CONSTRUCTION COMPANY
VALLEY RANCH
BAPTIST CHURCH
Ca,er.1 No te'
I a.e =wa n<ra., m[ <o-�rwm m m. c1r If Cope"
V wa ne
[ o w spMn=elbnz =aap vs ne .e na,Nn nne -I,— ey
cly
2 rna b=[t I al I. ., w Ineae % we tot- If—
nulmq p e' da. Tli sav[ 'ottflm E eewllm al a
ax[ ul I M - I. ey I.a C IA I
I I eft,e, II- Mua. ,I,nvn a— y L r c—[,
J. I vM be a. r. enMeatr of me —t—CI 1[ v I I m2
vuu,e,f p ua .t[<IM nl If. P'[}w1. M na
1 I ., 1 1 t o V N I p
09.80Y1 t[1 p e t,,f, p 9
W11,11, L e p
F FuM 9 Im NnS I ee pmenl.
p to ., 1 If I If,
G rl
1 nw,
x
V
Z "
Q LU
U w
F=
_
W
-`¢
N
a 4Ot10 n C to P.w v,t
I
0 nlmu
m i
a
um ee %arinea e.lerN rewr,•a -d ..Canty <4E
VALLEY RANCH BAPTIST CHURCH
I
M I
ooconsulting engineers
CIA A S"ctvrN Ertglneering-SUrveying
S
room I e.- fl r ssx of ua m[e�m w
amllr [ am a ey AsT o Lqe (seuneoN Prv<1o.
II
J
o
C--
n
V
ralN
— —
—
NG
JAR
�
/24%0
+.
•' R- IDao.oD
I
- y
PdnferW ./ 3 e IT o C.E.W.
L L —IS1J
1 T-717
W
.
LONG. BUTT —MNT
LC -15.13
; r C6— N BY
I
�
II
'
O 5,
All Pevvnn .,maw0 ,n[ Ma w,a rM 1, eY [^+Iro[Iw.
J�3{1
Q
— — NORTH — 811.47 tb'"BUJIIL�i�5ET9ALK — — —
I II me Y p crr[r st[.EVC,
—
'
jm,. A ft
MCC'
SPe<mrorlm ..puu1 p 1 vX I. vw[N at
I,d Sp,r r
N m s a
_
-}
/may
, e
3
." O
K
EXi5i r1
ORI �LJ
�I Cq
AGOBSTICAN ACOUSTIC DIM NSION5
OF TEXAS, INC
LANDSCAPE DESIGN
BLOOMING COLONS NURSERY
t LANDSCAPING INC.
FOOD SERVICE CONSULTANT
SYSTEMS DESIGN
INTERNATIONAL
GENEItAL CONRGICTOR
ROGERS O'SIBEN
CONSTRUCTION COMPANY
VALLEY RANCH
BAPTIST CHURCH
Ca,er.1 No te'
I a.e =wa n<ra., m[ <o-�rwm m m. c1r If Cope"
V wa ne
[ o w spMn=elbnz =aap vs ne .e na,Nn nne -I,— ey
cly
2 rna b=[t I al I. ., w Ineae % we tot- If—
nulmq p e' da. Tli sav[ 'ottflm E eewllm al a
ax[ ul I M - I. ey I.a C IA I
I I eft,e, II- Mua. ,I,nvn a— y L r c—[,
J. I vM be a. r. enMeatr of me —t—CI 1[ v I I m2
vuu,e,f p ua .t[<IM nl If. P'[}w1. M na
1 I ., 1 1 t o V N I p
09.80Y1 t[1 p e t,,f, p 9
W11,11, L e p
F FuM 9 Im NnS I ee pmenl.
p to ., 1 If I If,
G rl
1 nw,
x
V
Z "
Q LU
U w
F=
_
W
-`¢
- q
p1 r 6 P a b< -f -'a
a 4Ot10 n C to P.w v,t
I
0 nlmu
'
um ee %arinea e.lerN rewr,•a -d ..Canty <4E
VALLEY RANCH BAPTIST CHURCH
I
Q BROCKETTE - DAVIS • DRAKE , inc,
ooconsulting engineers
CIA A S"ctvrN Ertglneering-SUrveying
S
room I e.- fl r ssx of ua m[e�m w
amllr [ am a ey AsT o Lqe (seuneoN Prv<1o.
OE4CN
C--
OAn
V
ROTS
�I
�I
NG
JAR
L —I ZORINC
/24%0
nI
--
SAWCUT.
LONG CURB
REM04E EX. BLOCK I- LOT c
k GUTTER Yolby P.onon Crnbr
volume 88035, Page 1680
PdnferW ./ 3 e IT o C.E.W.
2
CONST.
LONG. BUTT —MNT
�
II
'
O 5,
All Pevvnn .,maw0 ,n[ Ma w,a rM 1, eY [^+Iro[Iw.
J�3{1
Q
— — NORTH — 811.47 tb'"BUJIIL�i�5ET9ALK — — —
I II me Y p crr[r st[.EVC,
—
'
jm,. A ft
MCC'
SPe<mrorlm ..puu1 p 1 vX I. vw[N at
I,d Sp,r r
N m s a
_
-}
/may
, e
.[ .p. a e,mmr ja 1,,. 1,,. ee P [a .1
,- .em la .
i
=e II, w<n .e
•..
JOB III��
L
16.25
RRELANE--/'
PARKING EXISTING
�24
!
p
EX 'LEG
TNSFORMER
RA
EX. TWO STORY
GONG
—�
BRICK BUILDING
FY 448.90'
'
EMObE
V
1501 BELT LINE
J
NSTALLAMON
�LG —R LMP
J
r
ROeD
1
HC RAN
IY 'r
EXI
C
r .
)
PUYGROUNO
BLOCK A, LOT t
E E CE N
7.500 ACRES
I I
326,704, Sq. Ft.
. 10
ff AIl19T �"
PROPOSED
'Ta rvu NElGHr
BUILDING
I
FF= 448:90
_
PI Ck
CONC BOLLARD
(EQUALLY SPACED '
sr� I
o
'
PORTE'
• E
F I
10 GRVIPTCN
ME14WT
BETWEEN
CACHRE SUPPORTS) 11
S
II II
N
O
�` I
G
GADATICN a o
EI
TRANSFORMER
( LK
/ 5 1 0 I EWAIX
I +i I A
/l
3
." O
K
EXi5i r1
ORI �LJ
�I Cq
AGOBSTICAN ACOUSTIC DIM NSION5
OF TEXAS, INC
LANDSCAPE DESIGN
BLOOMING COLONS NURSERY
t LANDSCAPING INC.
FOOD SERVICE CONSULTANT
SYSTEMS DESIGN
INTERNATIONAL
GENEItAL CONRGICTOR
ROGERS O'SIBEN
CONSTRUCTION COMPANY
VALLEY RANCH
BAPTIST CHURCH
Ca,er.1 No te'
I a.e =wa n<ra., m[ <o-�rwm m m. c1r If Cope"
V wa ne
[ o w spMn=elbnz =aap vs ne .e na,Nn nne -I,— ey
cly
2 rna b=[t I al I. ., w Ineae % we tot- If—
nulmq p e' da. Tli sav[ 'ottflm E eewllm al a
ax[ ul I M - I. ey I.a C IA I
I I eft,e, II- Mua. ,I,nvn a— y L r c—[,
J. I vM be a. r. enMeatr of me —t—CI 1[ v I I m2
vuu,e,f p ua .t[<IM nl If. P'[}w1. M na
1 I ., 1 1 t o V N I p
09.80Y1 t[1 p e t,,f, p 9
W11,11, L e p
F FuM 9 Im NnS I ee pmenl.
p to ., 1 If I If,
G rl
1 nw,
x
V
Z "
Q LU
U w
F=
_
W
-`¢
S 000 P9 Conr ale Pwsnent
OCEW.
- q
p1 r 6 P a b< -f -'a
a 4Ot10 n C to P.w v,t
,�
0 nlmu
'
um ee %arinea e.lerN rewr,•a -d ..Canty <4E
VALLEY RANCH BAPTIST CHURCH
CITY OF COPPED- DALLAS COUNTY, TEXAS
Q BROCKETTE - DAVIS • DRAKE , inc,
ooconsulting engineers
CIA A S"ctvrN Ertglneering-SUrveying
S
room I e.- fl r ssx of ua m[e�m w
amllr [ am a ey AsT o Lqe (seuneoN Prv<1o.
OE4CN
C--
OAn
V
ROTS
1n ) [e
NG
JAR
.'GxA1
/24%0
P =40'
--
CO2047
PdnferW ./ 3 e IT o C.E.W.
2
Rely to
Xo. 9.03W19 INw=n 400 })
'
O 5,
All Pevvnn .,maw0 ,n[ Ma w,a rM 1, eY [^+Iro[Iw.
Q
s.
I II me Y p crr[r st[.EVC,
'
jm,. A ft
MCC'
SPe<mrorlm ..puu1 p 1 vX I. vw[N at
I,d Sp,r r
N m s a
/may
, e
.[ .p. a e,mmr ja 1,,. 1,,. ee P [a .1
,- .em la .
i
=e II, w<n .e
•..
JOB III��
S 000 P9 Conr ale Pwsnent
OCEW.
o /u a 18'
PNnf tl V
a 4Ot10 n C to P.w v,t
_
RNafaroad ./ /3 a 18' O.C.EW.
T 4000 PSI Concrete Pavem•+l
®
_
R.FMC.S ./ 13 a 18' O.G.E. W
PAVING PLAN
VALLEY RANCH BAPTIST CHURCH
CITY OF COPPED- DALLAS COUNTY, TEXAS
Q BROCKETTE - DAVIS • DRAKE , inc,
ooconsulting engineers
CIA A S"ctvrN Ertglneering-SUrveying
3535 T,.A,'Sulte 100 OgOae.T ... 75204(214)522 -9540
OE4CN
C--
OAn
SCUf
ROTS
nLE
NG
JAR
.'GxA1
/24%0
P =40'
--
CO2047
OC LIGHT STNDARD
0. PPROPOS A
7 7 /
3
1 //, I
— PROPOSED CURB
— E%IBTING CURB
,t t h t;
t
_ EeI,Ogg C gf.ta P...nl la. .get
w
/ CanPr.1. I. be r.,letl
`
3000 P& Cma.te P..nt
PdnferW ./ 3 e IT o C.E.W.
ICY PLAN
_ 4
R
C7