Loading...
Valley R Baptist 2-LR021206REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021265.0039 lrerr acon Service Date: November 22, 2002 Dallas, Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630 -1010 Client: Valley Ranch Baptist Church Report Date: December 06, 2002 Attn: Robert Feille Project: Valley Ranch Baptist Church 1501 East Belt Line Road 1501 East Belt Line Rd Coppell TX 75019 Coppell, TX Project Number: 94021265 Services: Drilled belled pier observation. On this date, a HBC/Terracon technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet(s) for recorded data. Technician: Terry L. Smith Report Distribution: HBC/Terracon (1) Rogers- O'Brien Construction Co. (1) City of Coppell - Conslr Insp /(t �tp (1) Brockette Davis K 1f - s Drake Inc (1) City of Coppell Building Inspector Reviewed by 5!L_1 (1) HKS Inc Hussein H. Abusaad, P.E. (1) Valley Ranch Baptist Church Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of i „sks�ea.uw. k.v c![ o!!® L �.!y - Cf) Ir & LLI 0 _j m LLJ 0 � � 0 0 R � 0 w � \ \©/ \ /\\ x e §/ \\ A§ j �)} \ \} / } � , / § ® ` / / / § � 9 \ ƒ ( �f 2 J Z f � k ƒ } - a § f _ e o $ Lu ) ` 0 \ § - - - �� «) ) | 7 / j § 0 k | J� ! 0 : - § k ) 0 ! \ {�{ - _ - k ! { ! E / / | | )} a/ !)3)$ i 3£ a a 2! p w , /