Loading...
Valley R Baptist 2-LR021114MC REPORT OF REINFORCING STEEL OBSERVATION se l r errac on Consulting Engineers & Scientists 8901 Carpenter Frwy, Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 11/14/02 3660 Report No.: 94021265.0030 Services Drawings Utilized: Project No.: 94021265 Valley Ranch Baptist Church Project: Valley Ranch Baptist Church 1501 East Belt Line Road 1501 East Belt Line Rd. Coppell, TX 75019 Coppell, TX Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Civil Locations /Items Observed: See attached sketch Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED Placing Drawings Approved CORRECT X INCORRECT ITEMS OBSERVED Length and Shape CORRECT X INCORRECT ITEMS OBSERVED Column Tie Spacing & Type CORRECT INCORRECT Bar Size X Proper Placement X Stirrup Spacing 8 Type Bar Grade X Properly Tied X Reber Clean X Dowel Bars in Place X Welded Splices Form Clean X Proper Supports X Mechanical Splices Number of Bars X Proper Cover X Lapped Splices X Discrepancies /Comments: A discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To: Technician: M. Arandia FDC 1 errac Report Distribution: c un.urrina enal ne,re 1. eclennc- (1) Rogers - O'Brien Construction Co. (1) City of Coppell - Constr. Insp. , I - (1) Brockette Davis Drake, Inc (1) City of Coppell Building Inspector " �/"ft f/ �J y (1) HKS, Inc. (1) Valley Ranch Baptist Church Hussein H. Abusaad, P. E. Senior Project Manager 309sks This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of HBC/Terracon rerrac ®n PROJECT: Page of JOB NO. QL'02 1265. a,3o:*&-3 "b t Comp. By CHECKED BY: ell 5 occ 4,xa - Form 112 -5 -93