Valley R Baptist 2-LR020813REPORT OF REINFORCING STEEL OBSERVATION JA -11
8901 Caryrenmr Ftwy., Suim I
Dxllxe. Tea, 75247
Date of Service: 08/13/02
Report No.: 94021265.0009
Client No.: 3660
Project NO.: 94021265
Client: Valley Ranch Baptist Church
Project: Valley Ranch Baptist Church
1501 East Belt Line Road
1501 East Belt Line Rd
Coppell, TX 75019
Coppell, TX
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: Civil
Locations /Items Observed: Pavement - See attached sketch
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED
Placing Drawings Approved
CORRECT
X
INCORRECT
ITEMSOBSERVED
Length and Shape
CORRECT
X
INCORRECT
ITEMS OBSERVED
Column Tie Spacing & Type
CORRECT
INCORRECT
Bar Size
X
Proper Placernem
X
Stirrup Spacing & Type
Bar Grade
X
Properly Tied
X
Paper Clean
X
Dowel Santini Place
X
Welded Splices
Form Clean
X
Proper Supports
X
Mechanical Splices
Nurt'ber of Bars
X
Pro Pa rCOVer
X
Lapped Splices
X
Discrepancies /Comments: Any discrepancies found were corrected at the time of this observation unless otherwise
noted.
Field Results Report To:
Technician: M. Arandia
Report Distribution: 1171_, Engineering
(1) Rogers- O'Brien Construction Co. (1) Valley Ranch Baptist Church
(1) Brockette Davis Drake, Inc. (1) City of Coppell - Constr. Insp.
(1) HKS, Inc. (1) City of Coppell - Bldg. Insp.
Hussein H. Abusaad, P. E.
Senior Project Manager
309sks This report is exclusively for the use of the client indicated above and shall not be reproduced without v,nnen approval of HBC Engineering
ferracon
PROJECT: VAL.LFRV Z -AeJLH 3APTISTC HURLN Page
JOB NO. QHoii26s 0004 Date 8/13 Comp. By
CHECKED BY:
of
X
9 a
Z
S
01
.3
. - L
IST ?out
?AuEMEMT
7z r
Z
m
Form 112 -5 -93