ST9602-CS030902CMAQ #10 CSJ: 0918 -45 -321 MacArthur Blvd. @ Beltline Rd. 1 1 t uan i y Unit Daily Production Duration F I F (approx) Rate (Days) 1 ea 1 1 <240m 240 m 1 I 1 <1100m2 1100m2 2 12 <1710m3 11710 m3 2 13 <100m 100 m + 7 days 1 10 4 <1980 m311980 m3 + 7 days .10 15 L. sum 1 day 2 6 L. sum 12 days 14 6 L. sum 7 days g 17 L. sum 12 days 1 12 17 . L. sum 5 days g 1 i _. sum 1 day i i Activity Id Nos. & impletion Require H.] Finish TIME LINE Day 5 10 15 20 25 30 35 40 Page 1/1 50 bl• M M >d D Time Estimation CMAQ 410 MIS.DCS.0701 CONTROL: 0918 -45 -321 PROJECT: CM 96(907) HIGHWAY: CS COUNTY: DALLAS THE ENCLOSED TEXAS DEPARTMENT OF TRANSPORTATION SPECIFICATIONS, SPECIAL PROVISIONS, GENERAL NOTES AND SPECIFICATION DATA IN THIS DOCUMENT HAVE BEEN SELECTED BY ME, OR UNDER MY RESPONSIBLE SUPERVISION, AS BEING APPLICABLE TO THIS PROJECT(S). HA P. E. m cf- o 9_ o 3 GHADASSI, P.E. DATE SEAL PEE OFpl%%1 j HASSAN MOGHADASSI ................. .......... -o' 84231