ST9602-CS030902CMAQ #10
CSJ: 0918 -45 -321
MacArthur Blvd. @ Beltline Rd.
1
1
t
uan i y
Unit
Daily Production
Duration F
I F
(approx)
Rate
(Days)
1 ea
1
1
<240m
240 m
1 I 1
<1100m2
1100m2
2 12
<1710m3
11710 m3
2 13
<100m
100 m + 7 days
1 10 4
<1980 m311980
m3 + 7 days
.10 15
L. sum
1 day
2 6
L. sum
12 days
14 6
L. sum
7 days
g 17
L. sum
12 days 1
12 17 .
L. sum
5 days
g 1 i
_. sum
1 day
i i
Activity Id Nos. &
impletion Require
H.]
Finish TIME LINE
Day 5 10 15 20 25 30 35 40
Page 1/1
50
bl• M M >d
D
Time Estimation CMAQ 410
MIS.DCS.0701
CONTROL: 0918 -45 -321
PROJECT: CM 96(907)
HIGHWAY: CS
COUNTY: DALLAS
THE ENCLOSED TEXAS DEPARTMENT OF TRANSPORTATION SPECIFICATIONS,
SPECIAL PROVISIONS, GENERAL NOTES AND SPECIFICATION DATA IN
THIS DOCUMENT HAVE BEEN SELECTED BY ME, OR UNDER MY RESPONSIBLE
SUPERVISION, AS BEING APPLICABLE TO THIS PROJECT(S).
HA P. E. m cf- o 9_ o 3
GHADASSI, P.E.
DATE
SEAL
PEE OFpl%%1
j HASSAN MOGHADASSI
.................
..........
-o' 84231