Loading...
ST9602-CS030826DALLAS COUNTY PUBLIC WORKS August 26, 2003 Suja Mathew, P.E. Texas Department of Transportation 4777 East Highway 80 Mesquite, Texas 75150 Subject: Congestion Mitigation Air Quality (CMAQ) Program Certifications - Project 10 Dear Ms. Mathew: ✓ I l 4 _ Dallas County certifies that all has been completed as per the attached certifications. Please proceed with submitting this project for Austin review and TxDOT letting. If you have any other questions or concerns about this matter, please call me at 214 - 653 -7460 or Sam Wilson at 214- 653 -6421. Sincerely, L �� �� % ✓�.G2n•'c�l'1 Craig J. Goodroad Program Manager Attachments: (1.) Right of way certification (2.) Relocation assistance certification (3.) Utility adjustment certification (4.) Encroachment certification cc: Sam Wilson, P.E., Assistant Director, Transportation and Planning, w/o attachments Sam Moghadassi, P.E., TxDOT Roadway Design, w/o attachments Kenneth Griffin, P.E., City of Coppell, w/ attachments Scott Young, P.E., USA Professional Services Group, Inc., w/o attachments S:\ General \G04CORR \G4- 10UT\TXDOT\2003 \1078_ P10 project certifications.doc 411 Elm Street, 4th Floor Dallas, Texas 75202 C14 -DDJ - i 1 0 interoffice MEMORANDUM Texas Department of Transportation DALLAS DISTRICT To: Suja Mathew, P.E. From: Charles R. Tucker, P.E. Date: August 21 , 2003 R Certifications County: Dallas Project: CM 96(907) C -S -J: 0918 -45 -321 Highway: CS Limits: From: MACARTHUR AT BELT LINE RD To: IN CITY OF COPPELL The following certifications have been furnished as you requested. If you have any questions, please contact Mr. Travis Henderson at (214) 320 -6263. Thank you. \ Charles R. Tucker, P.E. Director of Transportation Planning and Development County. Dallas Project: CM 96(907) C -S -J.• 0918 -45 -321 Highway: CS Limits: From: MACARTHUR AT BELT LINE RD To: IN CITY OF COPPELL UTILITY ADJUSTMENT CERTIFICATION This is to certify that utility adjustments were not required or have been completed for this project. 7ZR441 '�'-7 District Engineer Dallas District Date: August 21 , 2003 County: Dallas Project: CM 96(907) C -S -J: 0918 -45 -321 Highway. CS Limits: From: MACARTHUR AT BELT LINE RD To: IN CITY OF COPPELL ENCROACHMENT CERTIFICATION This is to certify that no right -of -way encroachments existed within the limits of this project or all removal of encroachments has been completed. TWA District Engineer Dallas District Date: August 21 , 2003 County: Dallas Project: CM 96(907) C -S -J.• 0918 -45 -321 Highway: CS Limits: From: MACARTHUR AT BELT LINE RD To: IN CITY OF COPPELL RIGHT OF WAY CERTIFICATION This is to certify that acquisition of right -of -way was not required for this project. . District Engineer Dallas District Date: August 21 , 2003 County: Dallas Project: CM 96(907) C -S -J.• 0918 -45 -321 Highway: CS Limits: From: MACARTHUR AT BELT LINE RD To: IN CITY OF COPPELL RELOCATION ASSISTANCE CERTIFICATION This is to certify that this project did not cause any displacements and the steps relative to relocation advisory assistance and payments under the current FHWA directive(s) covering the administration of the Highway Relocation Assistance Program were not required. 'District Engineer Dallas District Date: August 21, 2003 County: Project: C -S -J: Highway: Limits: CMAQ Project 10 0918 -45 -321 (off system) Various Intersections Beltline @ Mac Arthur Dallas ENCROACHMENT CERTIFICATION This is to certify that no right -of -way encroachments existed within the limits of this project or all removal of encroachments has been completed. Ce Date: Recommended for Approval Craig J. Goodroad CMAQ Program Manager Dallas County County: Dallas Project: CMAQ Project 10 C -S -J: 0918 -45 -321 (off system) Highway: Various Intersections Limits: Beltline @ Mac Arthur RIGHT OF WAY CERTIFICATION This is to certify that all the right -of -way has been acquired in accordance with the current FHWA directives covering the acquisition of real property, except the parcels listed below which will be acquired in accordance with FHWA directives. PARCEL NUMBER DOMAI DATE NO RIGHT -OF -WAY IS REQUIRED ON THESE INTERSECTIONS ��lit Date: z d a 3 Recommended for Approval Craig J. Goodroad CMAQ Program Manager Dallas County County: Dallas Project: CMAQ Project 10 C -S -J: 0918 -45 -321 (off system) Highway: Various Intersections Limits: Beltline @ MacArthur RELOCATION ASSISTANCE CERTIFICATION This is to certify that this project did not cause any displacements and the steps relative to relocation advisory assistance and payments under the current FHWA directive(s) covering the administration of the Highway Relocation Assistance Program were not required. !y ✓y Date: A"),)o 3 Recommended for Approval Craig J. Goodroad CMAQ Program Manager Dallas County County: Dallas Project: CMAQ Project 10 C -S -J: 0918 -45 -321 (off system) Highway: Various Intersections Limits: Beltline @ Mac Arthur UTILITY ADJUSTMENT CERTIFICATION This is to certify that all utilities have been adjusted in accordance with the appropriate directives covering the adjustment of utilities, except those utilities listed below which will be adjusted in accordance with the appropriate directives. OWNER UTILITY AND LOCATION EXPECTED DATE OF COMPLETION OF ADJUSTMENT Date: Recommended for Approval Craig J. Goodroad CMAQ Program Manager Dallas County