Valley R Plaza 2B-LR030811Slump, inches:
5.25
CONCRETE COMPRESSIVE STRENGTH
TEST lrer"r
con
Report Number: 94031170.0053
8901 Carpenter Frwy, Ste #100
Service Date: July 14, 2003
Dallas, Texas 75247
(214) 630 -1010
Client: Phase II BLMA Limited
Report Date: August 11, 2003
Attn: Tad Weatherford
Project: Valley Ranch Plaza Phase II
5950 Berkshire Ln Ste 410
917 South MacArthur Blvd
Dallas TX 75225
Coppell, TX
Project Number: 94031170
Material Information
Sample Information
Specified Strength: 4000 psi @ 28 Days
Sample Time: 8:40am Date Cast: July 14, 2003
Laboratory Test Data
Technician: Thomas J. Cleaver
Batch Time: 7:37am Plant: 89
Weather Conditions: Clear, sunny
Supplier: Beall
Accumulative Yards: 110
Truck No: 117 Ticket No:
89028477 Placement Method: Direct Discharge
Mix I.D. No.: 340L1504
Sample Locations: See page 1
Water Added Onsite Before Test: 10 Gallons
Placement Location: See page 1
Field Test Data
Test Load
Test Result
Specification Test Method
Slump, inches:
5.25
ASTM C -143
Air Content, %:
5.0
ASTM C -231
Concrete Temperature, 0 F:
91
ASTM C -1064
Ambient Temperature, ° F:
93
ASTM C -1064
Plastic Unit Weight, pcf:
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Diameter
Area
Date
Test Load
Strength
No. ID (inches)
( sq. inches
Tested
(days) (lbs)
(psi)
2 1 6.00
28.27
07/21/2003
7 99,680
3,520
2 2 6.00
28.27
07/21/2003
7 106,500
3,770
Average
3,650
2 3 6.00
28.27
08/11/2003
28 126,730
4,480
2 4 6.00
28.27
08/11/2003
28 130,580
4,620
Average
4,550
Comments: Not tested for plastic unit weight.
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
Technician: Thomas J. Cleaver
Report Distribution: r on
(1) Phase II BLMA Limited
(1) City of Coppell TX Reviewed by:
(1) City of Coppell TX EilcJ. Cleve nd, P.E.
(1) Mycon General Contractors
Senior Project Engineer
The tests were performed in general accordance with applicable ASTM, AAS HTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 2 of 2 01 - LLw Di-F�„.,,
I Derr c ®n
PROJECT: //�/ //Rr � �"�� &"e; Page of
JOB NO. 9yo3 D�s3 Date � �� �� Comp. By 5 CHECKED BY:
/
�u
I �
Form 112 - 5 -93
1
CONCRETE COMPRESSIVE STRENGTH TEST t--
Report Number: 94031170.0053 1('erracon
Service Date: Jul 14, 2003 8901 Carpenter Frwy, Ste #100
July Dallas, Texas 75247
(214) 630 -1010
Client: Phase II BLMA Limited Report Date: August 11, 2003
Attn: Tad Weatherford Project: Valley Ranch Plaza Phase II
5950 Berkshire Ln Ste 410 817 South MacArthur Blvd
Dallas TX 75225 Coppell, TX
Project Number: 94031170
Material Information Sample Information
Specified Strength: 4000 psi @ 28 Days Sample Time: 6:35am Date Cast: July 14, 2003
Technician: Thomas J. Cleaver
Batch Time: 5:44am Plant: 89 Weather Conditions: Clear
Supplier: Beall Accumulative Yards: 30
Truck No: 117 Ticket No: 89028469 Placement Method: Direct Discharge
Mix I.D. No.: 340L1504 Sample Locations: See attached sketch
Water Added Onsite Before Test: 5 Gallons Placement Location: Pavement curbs
Field Test Data
Test Result Specification Test Method
Slump, inches: 5.00
Air Content, %: 3.8
Concrete Temperature,° F: 92
Ambient Temperature, 0 F: 82
Plastic Unit Weight, pcf:
Laboratory Test Data
Set
Specimen
Diameter
Area
No.
ID
(inches)
( sq. inches
1
1
6.00
28.27
1
2
6.00
28.27
1
3
6.00
28.27
1
4
6.00
28.27
ASTM C -143
ASTM C -231
ASTM C -1064
ASTM C -1064
Comments: Not tested for plastic unit weight.
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 2 o,- ILw.o, -I... x.,
Age at Maximum
Compressive
Date
Test Load
Strength
Tested
(days) (lbs)
(psi)
07/21/2003
7 112,760
3,990
07/21/2003
7 115,010
4,070
Average
4,030
08/11/2003
28 131,860
4,660
08/11/2003
28 135,070
4,780
Average
4,720
Comments: Not tested for plastic unit weight.
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 2 o,- ILw.o, -I... x.,