Loading...
First Baptist-CS031009Craig M. Hoenes Kimley -Horn and Associates, Inc. 12700 Park Central Drive, Suite 1800 Dallas, TX 75251 RE: First Baptist Church of Coppell Addition Fee Assessment Letter REVISED Dear Mr. Hoenes: Sincerely, 1'J f' Teresa M. Turner, E.I.T. Graduate Engineer T H E C 1 T V O F COPPELL O s 9 cc: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation 255 PARKWAY P.O.BOX 9478 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673 October 9, 2003 Enclosed is a copy of the revised City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. We have received payment for the Impact Fees to the City of Coppell in the amount of $4,814.63. Please provide a copy of the Engineer's estimate or contract to our office so the 2% 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. DEVELOPMENT FEE TABLE Project: First Baptist Church of Coppell Addition REVISED Date: 10/9/2003 TOTAL FEES DUE AMOUNT DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee (100% due at Issuance of Building Permit) $2,940.00 Water Tap Inspection Fee (100% due at Issuance of Water Meter) $150.00 Water Meter Fee (Domestic) (100% due at Issuance of Water Meter) $205.28 Water Meter Fee (Irrigation/Fireline) (100% due at Issuance of Water Meter) $2,297.72 Water Meter Deposit (Domestic) (100% due at Issuance of Water Meter) $0.00 Irrigation/Fireline Meter Deposit (100% due at Issuance of Water Meter) $60.00 Wastewater Impact Fee (100% due at Issuance of Building Permit) $0.00 Wastewater Tap Inspection Fee (100% due at Issuance of Building Permit) $50.00 Utility Final Inspection Fee (100% due at Issuance of Building Permit) $50.00 Park Fee (100% due prior to Council Approval) $0.00 $0.00 Roadway Impact Fee (100% due prior to Council Approval) $4,814.63 $4,814.63 Street Light Fee (100% due prior to Acceptance of Project) Information not Available 11 Information not Available Street Sign Fee (100% due prior to Acceptance of Project) Construction Inspection Fee (100% due prior to Start of Construction) Information not Available TOTAL $10,567.63 $4,814.63 I TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL DEVELOPMENT FEE TABLE Project: First Baptist Church of Coppell Addition REVISED Date: 10/9/2003 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): DEVELOPMENT FEE WORKSHEET PROJECT: First Baptist Church of Coppell Addition REVISED DATE: 10/9/2003 0 2 inch 1 2 inch 0 Fireline Meter(s): 1 8 inch Total 10.5 ESU's $280.00 ea. $2,940.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total 3 Connections $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 1 Domestic Meter(s) $205.28 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 1 Irrigation Meter(s) Total 0 Additional Irrigation Meter(s) Total 1 Fireline Meter(s) (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total 0 Meter(s) $30.00 ea. (100% due prior to issuance of water meters) Irrigation /Fire Meter Deposit Fee: Total 2 Meter(s) $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 $280.00 ea. $0.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total 1 Connections $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 1 Lots $50.00 ea. (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): Preliminary plat approved: After October 26, 1993 0 Single- family $0.00 per lot 0 Multi- family $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Page 1 0 ESU's 8 ESU's 0 ESU's 2.5 ESU's $205.28 $0.00 $2,092.44 $150.00 $205.28 $205.28 $0.00 $2,092.44 $0.00 $60.00 $50.00 $50.00 $0.00 DEVELOPMENT FEE WORKSHEET Roadway Impact Fee: (See attached fee calculations) $4,814.63 Street Lighting Fees: Assessed for lighting in the City's right -of -way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right -of -way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 Information not Available Information not Available Information not Available Service Area 6 Category Institutional Land Use Church/Synagogue 30,863 Building Area (sf) Development Units 30.86 Vehicle Miles per Development Unit 0.52 Fee per Vehicle Mile $300 Roadway Impact Fee due (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $4,814.63 ROADWAY IMPACT FEE CALCULATIONS PROJECT: First Baptist Church of Coppell Addition DATE: 10/9/2003 ROADWAY IMPACT FEE: (Figure 2 Roadway Impact Fee Study) (Table 3 Roadway Impact Fee Study) (Schedule 2, Page 3 Roadway Impact Fee Study) I AMOUNTD S4214.63