Loading...
First Baptist-CS031009 (2)To: Jennifer Armstrong, Finance Director Via: Ken Griffin, P.E., Dir. of Engineering /Public Works Y'l From: Teresa Turner, Graduate Engineer Date: October 9, 2003 RE: First Baptist Church Addition After further review of the engineering department's fee assessment files, it has come to my attention that the First Baptist Church Addition was incorrectly assessed fees for an additional water meter connection. Their current building already has a 2" domestic water meter connection and they will be relocating the service line with a new 2" water meter therefore, no additional impact fees are required. A reimbursement total of $4480.00 is due for the following fees: Water Impact Fee $2240.00 Wastewater Impact Fee $2240.00 The church will not be required to pay the Domestic Water Meter Deposit Fee of $30.00. I have prepared a revised fee assessment that will not show this charge. If you have any questions of need any further information, please feel free to contact me to discuss. Attachment: Receipt for payment of these fees from Building Inspections. CC. Cr�l o &ne s r44v97a/3?- 3sao MEMORANDUM FROM THE FILE DEPARTMENT OF ENGINEERING �Im �ey skoen "CITY OF COPPELL ENGINEERING EXCELLENCE BY DESIGN" 97 O7, f, _t351a Street Cut Water Tap Sewer Tap Final Utility Inspection Impact Fee: Water Fact Fee: Wastewater Meter Deposit P.e:nspection Fee Received By r w t •e 1 t t •a C 0 SOO SUUTMWEBTa5N e•_ ep U c PELL. TEXA7, 7Eo TEL 9�72/30i1 3100 TOTAL COFPELL FIRE DEPT Name L C /t Service 9i2 Datep Cash ,ZAV Cas Check No. /l$ Ei Master Card VISA AMEX Building Permit I/tI wr��� 4 ..Certiticrate-ef-Oecupancirtg k ao Contractor Fee Voucher 53124 EA: ?iE E11 Ei