ST0102-MP031009 RUBY ROAD
ST 01-02
Pacheco Koch Consulting Engineers
ID
1
2
3
2001 Qtr 4, 2001 Qtr 1,2002 Qtr 2, 2002 Qtr 3, 2002 : Qtr 4, 2002 Qtr 1,2003 Qtr 2, 2003 Qtr 3, 2003
Task Name -Aug Sep Oct r4~v E)~ ,Jan F~~ Mar-,~,pr --May~ Jun~ul A~ep-- Dct 'Nov D~C Jan TFeD Ma} ,&pr Ma~.J~l A~
DESIGN PHASE
Design
Advertisement
4 Bid Opening ~ · 10128
7 Oncor Electric & Gas
8 Verizon / GTE
i0 Rone Engineers
12 ; CONSTRUCTION
13 Preconstruction Meeting · 11125
14 Noticeto Proceed · 1213
15 Construction (work days)
i6 Construction (Over)
Project: ST 01-02 Task ~ Mileetone · Summary ~. v Deadline
Date: Thu 10/9/03
Page 1
RUBY ROAD
ST 01-02
Pacheco Koch Consulting Engineers
7
15
Oncor Electric & Gas
10-07-02 Jim Phillips said the relocations would start in early November. Requested trees to be removed prior to the relocation to expediate the relocation
November 7, 2002 - relocation staked, poles will be 2 feet south of right-of-way
Construction (work days)
WEEK 1 (Dec. 16 - 20)
Installed approximately 450 feet of the 8-inch sewer line. Completed 50% of all clearing and grubbing.
WEEK 2 (Dec. 23 -27)
Completed the installation of the 8-inch sewer line Began installation of the 12-inch water tine.
WEEK 3 (Dec. 30 - Jan. 3)
Installed approximately 1500 linear feet of the 12-inch water line Uncovered the existing water line along Coppell Road
WEEK 4 (Jan. 6 -10)
Installed the water line under the existing Verizon line on the west end of the project Installed fire hydrants and set meter valves and boxes Worked on excavation and fill and the installation of the 54-
inch storm drain.
WEEK 5 (Jan, 13-17)
Worked on the installation of the storm drain
WEEK $ (Jan. 20 -24)
Finished the installation of the 12" water line, stubouts, and fire hydrants Installed the 30" and 36" storm drain pipes and the 18" laterals 95% of the asphalt and base removal of the existing road is
complete
WEEK 7 (Jan. 27 -31)
Installed 54" storm drain. Installation of all of the storm drain is complete for Phase I Installed the 5'x5' box culvert and worked on placement of fill material. Preparing roadway for lime stabilization
Received a complaint from the trailer park concerning rebar in the landscaping, trash, and the trailer park sign
WEEK 8 (Feb,03 - 07)
Completed the 12" water line testing. Took samples, Preparing roadway for lime stabilization
WEEK 9 (Feb.11 -14)
Water line samples passed Started on the Phase I inlets. Type B manhole and headwall poured AT&T cable sti[l on utility poles Met with represetatives from AT&T and they will start relocation as
soon as possible
WEEK 10 (Feb.17 -21)
AT&T cable removed Oncor poles not removed yet. Contractor asking for additional time. Retesting of failed densities Rain.
WEEK 11 {Feb.24 -28)
Ice
WEEK 12 (Mar. 03-07)
No work
WEEK 13 (Mar. 10-14)
Oncor pulled the utility poles. Contractor lime stabilized the roadway.
WEEK 14 (Mar. 17-21)
Contractor remixed the lime stabilization. Took densities on the 21st
WEEK 15 (Mar, 24-28)
Some of the densities failed Started paving on the 27th Paved one-half of Phase 1
WEEK 16 (Mar. 31-Apr.4)
Paved the other half of Phase I.
WEEK 17 (Apr.7-11)
Poured six inlet tops.
WEEK 18 (Apr. 14-18)
Poured inlet throats - sealed the sawed joints -installed traffic buttons
WEEK 19 (Apr. 21 -25)
Worked on the demolition of Phase II. Installed the asphalt temporary roadway Made the traffic switch on the 21. Put up the signs.
WEEK 20 (Apr, 28 - May 1)
Worked on the excavation of Phase II
WEEK 21 (MAY 5 - 9)
Started the installation of the 27" storm drain. Added additional asphalt on the temporary drive because of standing water.
WEEK 22 (MAY 12 - 16)
Poured three inlet bottoms - finished storm drain. Set last fire hydrant. Killed old 4" water line and abandoned existing sewer tine. Painted fire hydrants,
Page 2
RUBY ROAD
ST 01-02
Pacheco Koch Consulting Engineers
WEEK 23 (May 19 -23)
Removed temporary asphalt ddve ~nspector had them replace the drive so that occupant could access property Worked on the mixing of the lime stabilization.
WEEK 24 (May 26 - 30)
Work on the lime stabilization process and took densities
WEEK 25 (June 2 - 6)
Paved the eastbound lanes of traffic
WEEK 26 (June 9 -t3)
Contractor paved the westbound lanes of traffic. All paved except for three drive approaches and the leave-out in front of the single residence
WEEK 27 (June 16 420)
Poured inlet throuts. Sawcut joints.
WEEK 28 (June 23
Made fie-ins to existing drives at single residence. Installed traffic buttons
WEEK 29 (June 30 July 4)
Opened roadway for traffic
WEEK 30 (July 07 -11)
Star~ed hydromulching the parkway
WEEK 31 (July 14 - 18)
Continued the hydromulching on the parkway.
WEEK 32 (July 28 - Aug,l)
Watered the hydromulch on the parkway
WEEK 33 ( Aug. 4 - 8)
WEEK 34 (Aug, 11 - 15)
Called Mark Askew to request that the signs be relocated on the eastern most entrance into the mobile home park. He indicated that it would be no problem to relocate the signs
Page 3