ST9904-CS031010r 'Aaranenr TxDOT SH 121 TASK FORCE REPORT of TfenSpor~tion ,/ _/Jp~ ~I~ Note: Section numbers in narrative below correspond to numbers on drawings. F /r/ /a%C3/d.~ October 10; 2.(103 ~_ I. COMPLETED PROJECTS Section From To Descri tion Date Com leted 1 Tarrant CL Denton CR 4-Iane ML w/ 2-lane FR Jul 1992 l Denton CR II3 35E 4/6 lane divided highw.~ Nov 1993 3 IH 35E FM 1171 6-lane divided h~h~ Jun 1991 4 FM 1171 Elm Fork 6-lane divided hi hwav _ Jul 1988 5 Elm Fork BNRR 4-lane divided hi~w~ _ _ Feb 1994 5$ Crider Road FM 423 Eliminate intersection ~ Se 1995 6 BNRR L.e ac 4-lane divided hi hwav Maz 1994 7 _ Le ac SH 289 41ane divided hi h w a Ma 1995 9 _ Denton CR Denton Ta Road _ _ BP: 3-lane fronta e roads _ Oct 1998 ]0 Denton Ta Road Lake Vista SP: 3-lane fron~e roads__ Jul 14$8 11 Lake Vista Ili 35H BP: 3-lane frontage roads Jun 1996 12 IH 35E FM 544 BP: 3-lane frontage roads i Oct 1999 II. DENTON COUNTY PROTECTS A. Section 13: Tarrant County Line to North of Denton Creek (canversian to ereeway)(CSJ 0364-02.0]7 & 0364-03-064) 1. The Texas Transportation Commission at their July 2001 meeting under the Innovative Financing Program advanced this project to Priority l in Category 3A - Nli5 Mobility. 2. Estimated Construction Costs: r CSI COITNTY FROM TO Length CgST Letting FY~ Based on Projected Fundi n~Level s 0364-01-072 Tarrant FM 2499 Denton CL 5.200 514,020,t~00 2CK17 0364-02-017 Dallas Tarrant CL Denton CL 1.728 570, lop,0p0 _ '7007 0364-03-064 Denton Dallas CL Benton Crk 0-300 _ $17,680,000 _ 2007 Total $10Y,&00,000 Paee I of 4 Jpdace3: 10i1C/2r,C7 B:2C .1.M T li~ .1?I3S S..\3TrdU"13.13~1 SSSSBtSo L6 SF;1 dS:un £pOZ-£T-UT SS»';4`~?L6 3. TxDOT's Fort Worth District is including this section of the SH 121 Free- way in an ongoinc MIS, Schematic, and E.A consultant contract they have in the area (Thc Funnel Project). The Fort Worth District is working closely with the City of Grapevine to develop the transportation needs in the area. The following arc estimated milestone dates: DESCRIP'T'ION F,STIMATED DA-TES, MIS Com tote Public Meetin : Preliminar Schematic and EA findings tl~esented- __-_ .January 2004 Public Hearin : Final Schematic and Final EA resented. Fa112004 FONSI - __ _ Ianuar~_2005 4. Grapevine is going to propose some access options in the Grapevine Mills area. B. Section 14: Existing SH 121 Near Denton Creek to Existing SH 121 Near FM 544 (Lewisville $ypass)(Mainlanes)(CS,1 3547-03-003, 3547-02-004, 3547- 01-005, 3547-O1-008, & 3547-01-009) Denton County 1. Estimated Construction Costs: CSI Designer FROM TO Length COST Letting Date Consr. Tinre (Months) ~ 3547-03-003 Halff SH 121 Dallas CL 0288 $1,435,'_'67 3547-02-004 Halff Denton CL Denton CL 1.225 $11,969,269 02-2[)03 42 3547-01-005 Halff Dallas CL MacArthur 0.551 $7,307,165 3547 01-008 Halff MacArthur IH 35E 1.244 $6Fi,229,223 Sub $86,940,924 3547-O1-009 C&B Hebron FM 2281 2.633 $31,371,407 - -- 10-2003 24 Total ---- - $118,312,83 T -- ~ 2. The Halff projects let on 02-04-03. The Engineer's cost estimate on the day of letting wtLti S] 12,015,017. Thc Iow bidder was Balfour Beaty Construction, Inc. with a bid of $86.940,924. 3. T1re Carter 8t .Burgess project let on 10-09-03. The Engineer's cost estimate on the day of letting was $36,814,821. The low bidder was Mario Sinacola Rr Sons with a bid of $31,371.,907_ C. Section 15: Denton County Portion: FM 544 to DN"T Bridgefarmer Design The Texas Transportation Commission at their Iuly 2001 meeting under the Innovative Financing Program advanced these frontage road projects to Priority 1 in Category 3A -NHS Mobility. Page 2 of 4 UDda Ced: :9110/2001 8:27 ,gym zof~j 12I3S SS3Iid0'I3.13Q SSSS~fiS~Lti SF3 GS:UU E'OOZ.CT-Oi 2. These mainlanes will be funded with a combination of local funds and funding from the North Central Texas Cuunci] of Governments (NCTCOG). 3. Construction Costs: CSJ County FROM TO Length COST Letting Date Const. Time Months 0364-03-066 Denton FM 544 Collin CL 4.947 $74,800,000 0364-04-038 Collin Denton CL DNT 0982 $14,200,000 Total 589,000,000 OS-2004 48 4. A settlement has been reached with the Maharishi Glohal Development Fund (MGDF') allowing TxDOT to acquire the last remaining ROW needed for this project. This project can now proceed as originally planned. ILI. COLLIN COUNTY PROJECTS A. Section 15: Collin County Portion: DN1' to US 75 1. Project Under Construction: CSJ County FROM TO Length COST Letting Date Const. Time {Months) 0364-04-022 Collin Custer US 75 6.037 546,464,255 I 1 '2002 30 0364-04-023 # Collin DNT Interchan e $3],000.00(1 ] 1-200.1 30 Total 577,464,255 # NTTA project with joint funding: NTTA = $19.9M; TxDOT = $1 L 1M Note: Project 0364-04022 includes the overpass and ramps at Custer Road. The 0364-04-022 project let on 11-08-02. The Engineer's cost estimate on the day of letting was $60,169,088. The low bidder was Austin Bridge & Road with a bid of 346,464,255. 2. Current Design Projects- CSJ County FROM TO Length COST Letting Date Const. Time (Months) 0364-04-037 Collin DNT Custer 4.912 y55,000,000 04-2004 30. Note: YroJect 0364-04037 includes mainlanes from the DNT to )vast of Ohio Road and the 3- level interchange at SH 289. Possible funding by Collin County and COG to construe[ the overpass and ramps at Hillcrest (estitnatad cost $10,490,000). Page 3 of 4 opdaced: 10 /10/10 ~? 9'%1 LY CO~j .12I3S Z\3It;d0'I3.13Q cecegreZL6 lF'3 6560 £nOZ-CT~OT Future Project: C5J Count FROM Tp Len th COST 0364-04-024 (ML) Collin Hillcrest US 75 8.5 581,600,000 Total 581.600.000 Page4of4 Vpda[ed: -i0/10/~6!'~3 9:~C AI± fi0~j :1N35 Z\3I1d0'I3.130 SSSSS'fiSZLO SY3 BS~UO COUZ!CPOT Bid,Totals Page 26 of 28 County: DENTON Type: ADD 8-LANE FRWY TO EXISTING FRONT ROADS Tlma: 504 WORKING DAYS Highway: SH 121 Length: 2.632 Llmlts: From: 0.26 MILES WEST OF HEBRON PARKWAY To: EAST OF FM 2281 Let Date: 10/09/03 Seq No: 32D1 Project 16: NH 2Opt(370) Contract ~: 10033201 CCSJ: 3547.Ot-009 Check: $100,000.00 Misc Cost: ~ss.oon nn Estlmeta $36,779,621.26 %Over/Under Comp@ny Bfdder 1 ^x91,371,907.66 -14.70°~ MARIO SINACOLA & SONS EXCAVATING, INC. Bldder2 $31,64D,223.87 -13.97°h GRANITE CONSTRUCTION COMPANY Bldder 8 $31,792,000,00 -13.56 % SITE CONCRETE, INC. Bldd@r 4 $33,510,341.06 -B.B9°h DUININCK EROS, INC. Bfdder 5 $33,659,327.88 -7.94% SUNMOUNT CORPORATION Bltlder 6 $34,681,299.15 -5.71% ZACHRY CONSTRUCTION CORPORATION Bldder7 $38,293,54238 -1-32°~ BALFOURBEATTYCONSTRUCTION,INC. Bldder8 $36,651,241.99 -0.35% ARCHER-WESTERN CONTRACTORS, LTD. Bfdtler9 $36,820,331.40 +0.11% J-D. ABRAMS, LP. State let COnstructlon Projects for October, 2003 Page X of Y ~n ,}.µ...lL........ A..« ~~~~e •....ol:..oAtAnf/r.r...-{.erflrm.l /r°P.~.,~/1.:.1raFJRirlTnt7f~ him 1f1/1(179(1(11 ~~ll :1835 Zti3Itid0'I3:13Q SSSSRtS7LR cF-i rc:en rnn~,r~r;~,r C2ate Monthly Report Page I of I 13 HWY: SH 121 PROJECT: NH2O01(368) CSJ: 354701008 SPECS: 93 LIMITS FROM: NORTH OF DENTON CREEK LIMITS TO: EAST OF IH 35E DESCRIPTION: CONSTRUCT FREEWAY FACILITY MAINLANES AND DIRECT CONNECTORS CONTRACTOR NAME: BALFOUR BEATTY CONSTRUCTION, INC. BID AMOUNT: $88,940,924.30 PROJECT MANAGER: Mark Ross FlELD OFFICE PH: 972/375-2206 TIME CHARGE: 93 / 868 = 11 % EST. WORK COMPLETE: 18% 9'° OF $ PAID: 18 LENGTH: 3.308 MI AMT PAID THIS HST: $5,005,353.06 WORK BEGAN: 05/01/2003 ECD: MAR„ 2007 CE: 1.3% CURRENT ACTIVITIES 1. Drill shaftslColumns 2. Embankment/Lime 9. Mllling/Storm sewers/SViping ~m,•//rlal_uirh/rlaltrar/l'nnctn~ctinnRennrrc/20(13/ORAno2M3 htm X0/1012003 9U :1?I35 Z\31kd0'I3:13Q Sc ~c c^~ 5_fri'_c_b S63 BS~6U CUOZiCT%OT Create Monthly Report Page 1 of 1 fi HWY: SH 121 PROJECT: NH2O02(933) CSJ: 036404022 SPECS: 93 LIMITS FROM: US 75 LIM1T5 TO: 0.7 MI WEST OF FM 2478 (CUSTFR RD.) DESCRIPTION: CONST 6-LN FRTG RD (PHASE I) W/MAINLANES & INTRCHG ~ CUSTER RD CONTRACTOR NAME: AUSTIN BRIDGE ~ ROAD, LP BID AMOUNT: X46,464,254.94 PROJECT MANAGER: Geary Burnside FIELD OFFICE PH: 469-633-0203 TIME CHARGE: 146 / 765.19% EST. WORK COMPLETE: 19% OF $ PAID: 31 LENGTH: 6.287 MI AMT PAID THI5 EST: $2,490,315-43 WORK BEGAN: 03/03/2003 ECD: Jan 20D6 CE: 3.7% CURRENT ACTIVITIES 1. RC Pipe (Sewer) 2. Lime Treat Subgr 3. Conc Box Culy }ittn•//rial_wPh/rialtray/CnnctnictinnRennrtc/7_OD3/ORAno2(10'i htm I(1l1D/7Df17 GO' .12135 ZX3fed0'I3.13Q SSSS9fiSZGd SFd dS~60 LOOZ-L'T-OT