I. COMPLETED PROJECTS
Section From To Descri tion Date Com leted
1 Tarrant CL Denton CR 4-Iane ML w/ 2-lane FR Jul 1992
l Denton CR II3 35E 4/6 lane divided highw.~ Nov 1993
3 IH 35E FM 1171 6-lane divided h~h~ Jun 1991
4
FM 1171
Elm Fork
6-lane divided hi hwav _
Jul 1988
5
Elm Fork
BNRR
4-lane divided hi~w~ _ _
Feb 1994
5$ Crider Road FM 423 Eliminate intersection ~ Se 1995
6 BNRR L.e ac 4-lane divided hi hwav Maz 1994
7 _ Le ac SH 289 41ane divided hi h
w
a Ma 1995
9 _ Denton CR Denton Ta Road _
_
BP: 3-lane fronta e roads _
Oct 1998
]0 Denton Ta Road Lake Vista SP: 3-lane fron~e roads__ Jul 14$8
11 Lake Vista Ili 35H BP: 3-lane frontage roads Jun 1996
12 IH 35E FM 544 BP: 3-lane frontage roads i Oct 1999
II. DENTON COUNTY PROTECTS
A. Section 13: Tarrant County Line to North of Denton Creek (canversian to
ereeway)(CSJ 0364-02.0]7 & 0364-03-064)
1. The Texas Transportation Commission at their July 2001 meeting under
the Innovative Financing Program advanced this project to Priority l in
Category 3A - Nli5 Mobility.
2. Estimated Construction Costs:
r
CSI COITNTY FROM TO Length CgST Letting FY~
Based on
Projected
Fundi n~Level s
0364-01-072 Tarrant FM 2499 Denton CL 5.200 514,020,t~00 2CK17
0364-02-017 Dallas Tarrant CL Denton CL 1.728 570, lop,0p0 _
'7007
0364-03-064
Denton
Dallas CL
Benton Crk
0-300 _
$17,680,000 _
2007
Total $10Y,&00,000
Paee I of 4
Jpdace3: 10i1C/2r,C7 B:2C .1.M
T li~
.1?I3S S..\3TrdU"13.13~1 SSSSBtSo L6 SF;1 dS:un £pOZ-£T-UT
SS»';4`~?L6
3. TxDOT's Fort Worth District is including this section of the SH 121 Free-
way in an ongoinc MIS, Schematic, and E.A consultant contract they have
in the area (Thc Funnel Project). The Fort Worth District is working
closely with the City of Grapevine to develop the transportation needs in
the area. The following arc estimated milestone dates:
DESCRIP'T'ION F,STIMATED DA-TES,
MIS Com tote
Public Meetin : Preliminar Schematic and EA findings tl~esented- __-_ .January 2004
Public Hearin : Final Schematic and Final EA resented. Fa112004
FONSI - __ _ Ianuar~_2005
4. Grapevine is going to propose some access options in the Grapevine Mills
area.
B. Section 14: Existing SH 121 Near Denton Creek to Existing SH 121 Near
FM 544 (Lewisville $ypass)(Mainlanes)(CS,1 3547-03-003, 3547-02-004, 3547-
01-005, 3547-O1-008, & 3547-01-009) Denton County
1. Estimated Construction Costs:
CSI Designer FROM TO Length COST Letting
Date Consr.
Tinre
(Months) ~
3547-03-003 Halff SH 121 Dallas CL 0288 $1,435,'_'67
3547-02-004 Halff Denton CL Denton CL 1.225 $11,969,269 02-2[)03 42
3547-01-005 Halff Dallas CL MacArthur 0.551 $7,307,165
3547 01-008 Halff MacArthur IH 35E 1.244 $6Fi,229,223
Sub $86,940,924
3547-O1-009 C&B Hebron FM 2281 2.633 $31,371,407
-
-- 10-2003 24
Total ----
-
$118,312,83 T --
~
2. The Halff projects let on 02-04-03. The Engineer's cost estimate on the
day of letting wtLti S] 12,015,017. Thc Iow bidder was Balfour Beaty
Construction, Inc. with a bid of $86.940,924.
3. T1re Carter 8t .Burgess project let on 10-09-03. The Engineer's cost
estimate on the day of letting was $36,814,821. The low bidder was Mario
Sinacola Rr Sons with a bid of $31,371.,907_
C. Section 15: Denton County Portion: FM 544 to DN"T
Bridgefarmer Design
The Texas Transportation Commission at their Iuly 2001 meeting under
the Innovative Financing Program advanced these frontage road projects to
Priority 1 in Category 3A -NHS Mobility.
Page 2 of 4
UDda Ced: :9110/2001 8:27 ,gym
zof~j 12I3S SS3Iid0'I3.13Q SSSS~fiS~Lti SF3 GS:UU E'OOZ.CT-Oi
2. These mainlanes will be funded with a combination of local funds and
funding from the North Central Texas Cuunci] of Governments
(NCTCOG).
3. Construction Costs:
CSJ County FROM TO Length COST Letting
Date Const.
Time
Months
0364-03-066 Denton FM 544 Collin CL 4.947 $74,800,000
0364-04-038 Collin Denton CL DNT 0982 $14,200,000
Total 589,000,000 OS-2004 48
4. A settlement has been reached with the Maharishi Glohal Development
Fund (MGDF') allowing TxDOT to acquire the last remaining ROW
needed for this project. This project can now proceed as originally
planned.
ILI. COLLIN COUNTY PROJECTS
A. Section 15: Collin County Portion: DN1' to US 75
1. Project Under Construction:
CSJ County FROM TO Length COST Letting
Date Const.
Time
{Months)
0364-04-022 Collin Custer US 75 6.037 546,464,255 I 1 '2002 30
0364-04-023 # Collin DNT Interchan e $3],000.00(1 ] 1-200.1 30
Total 577,464,255
# NTTA project with joint funding: NTTA = $19.9M; TxDOT = $1 L 1M
Note: Project 0364-04022 includes the overpass and ramps at Custer Road. The 0364-04-022
project let on 11-08-02. The Engineer's cost estimate on the day of letting was
$60,169,088. The low bidder was Austin Bridge & Road with a bid of 346,464,255.
2. Current Design Projects-
CSJ County FROM TO Length COST Letting
Date Const.
Time
(Months)
0364-04-037 Collin DNT Custer 4.912 y55,000,000 04-2004 30.
Note: YroJect 0364-04037 includes mainlanes from the DNT to )vast of Ohio Road and the 3-
level interchange at SH 289. Possible funding by Collin County and COG to construe[ the
overpass and ramps at Hillcrest (estitnatad cost $10,490,000).
Page 3 of 4
opdaced: 10 /10/10 ~? 9'%1 LY
CO~j .12I3S Z\3It;d0'I3.13Q cecegreZL6 lF'3 6560 £nOZ-CT~OT
Future Project:
C5J Count FROM Tp Len th COST
0364-04-024 (ML) Collin Hillcrest US 75 8.5 581,600,000
Total 581.600.000
Page4of4
Vpda[ed: -i0/10/~6!'~3 9:~C AI±
fi0~j :1N35 Z\3I1d0'I3.130 SSSSS'fiSZLO SY3 BS~UO COUZ!CPOT
Bid,Totals Page 26 of 28
County: DENTON
Type: ADD 8-LANE FRWY TO EXISTING FRONT ROADS
Tlma: 504 WORKING DAYS
Highway: SH 121
Length: 2.632
Llmlts:
From: 0.26 MILES WEST OF HEBRON PARKWAY
To: EAST OF FM 2281
Let Date: 10/09/03
Seq No: 32D1
Project 16: NH 2Opt(370)
Contract ~: 10033201
CCSJ: 3547.Ot-009
Check: $100,000.00
Misc Cost: ~ss.oon nn
Estlmeta $36,779,621.26 %Over/Under Comp@ny
Bfdder 1 ^x91,371,907.66 -14.70°~ MARIO SINACOLA & SONS EXCAVATING, INC.
Bldder2 $31,64D,223.87 -13.97°h GRANITE CONSTRUCTION COMPANY
Bldder 8 $31,792,000,00 -13.56 % SITE CONCRETE, INC.
Bldd@r 4 $33,510,341.06 -B.B9°h DUININCK EROS, INC.
Bfdder 5 $33,659,327.88 -7.94% SUNMOUNT CORPORATION
Bltlder 6 $34,681,299.15 -5.71% ZACHRY CONSTRUCTION CORPORATION
Bldder7 $38,293,54238 -1-32°~ BALFOURBEATTYCONSTRUCTION,INC.
Bldder8 $36,651,241.99 -0.35% ARCHER-WESTERN CONTRACTORS, LTD.
Bfdtler9 $36,820,331.40 +0.11% J-D. ABRAMS, LP.
State let COnstructlon Projects for October, 2003
Page X of Y
~n ,}.µ...lL........ A..« ~~~~e •....ol:..oAtAnf/r.r...-{.erflrm.l /r°P.~.,~/1.:.1raFJRirlTnt7f~ him 1f1/1(179(1(11
~~ll :1835 Zti3Itid0'I3:13Q SSSSRtS7LR cF-i rc:en rnn~,r~r;~,r
C2ate Monthly Report
Page I of I
13 HWY: SH 121 PROJECT: NH2O01(368) CSJ: 354701008 SPECS: 93
LIMITS FROM: NORTH OF DENTON CREEK
LIMITS TO: EAST OF IH 35E
DESCRIPTION: CONSTRUCT FREEWAY FACILITY MAINLANES AND DIRECT CONNECTORS
CONTRACTOR NAME: BALFOUR BEATTY CONSTRUCTION, INC.
BID AMOUNT: $88,940,924.30
PROJECT MANAGER: Mark Ross FlELD OFFICE PH: 972/375-2206
TIME CHARGE: 93 / 868 = 11 % EST. WORK COMPLETE: 18%
9'° OF $ PAID: 18 LENGTH: 3.308 MI AMT PAID THIS HST: $5,005,353.06
WORK BEGAN: 05/01/2003 ECD: MAR„ 2007 CE: 1.3%
CURRENT ACTIVITIES
1. Drill shaftslColumns
2. Embankment/Lime
9. Mllling/Storm sewers/SViping
~m,•//rlal_uirh/rlaltrar/l'nnctn~ctinnRennrrc/20(13/ORAno2M3 htm X0/1012003
9U :1?I35 Z\31kd0'I3:13Q Sc ~c c^~
5_fri'_c_b S63 BS~6U CUOZiCT%OT
Create Monthly Report Page 1 of 1
fi HWY: SH 121 PROJECT: NH2O02(933) CSJ: 036404022 SPECS: 93
LIMITS FROM: US 75
LIM1T5 TO: 0.7 MI WEST OF FM 2478 (CUSTFR RD.)
DESCRIPTION: CONST 6-LN FRTG RD (PHASE I) W/MAINLANES & INTRCHG ~ CUSTER RD
CONTRACTOR NAME: AUSTIN BRIDGE ~ ROAD, LP
BID AMOUNT: X46,464,254.94
PROJECT MANAGER: Geary Burnside FIELD OFFICE PH: 469-633-0203
TIME CHARGE: 146 / 765.19% EST. WORK COMPLETE: 19%
OF $ PAID: 31 LENGTH: 6.287 MI AMT PAID THI5 EST: $2,490,315-43
WORK BEGAN: 03/03/2003 ECD: Jan 20D6 CE: 3.7%
CURRENT ACTIVITIES
1. RC Pipe (Sewer)
2. Lime Treat Subgr
3. Conc Box Culy
}ittn•//rial_wPh/rialtray/CnnctnictinnRennrtc/7_OD3/ORAno2(10'i htm I(1l1D/7Df17