SW0001-MP031010RIVERCHASE SIDEWALK
S W 00 -01
PACHECO KOCH ENGINEERING
Otr 3, 2001
Qtr 4, 2001
Qtr 1, 2002
Qtr 2, 2002
Qtr 3, 2002 Qtr 4, 2002
- Sep
Qtr 1, 2003
Qtr 2 2003 Qtr 3, 2003
ID Task Name _ Jun
-
Jul Aug Sep
Oct Nov Dec
-
Jan. Feb Mar
Apr May Jun
Jul Aug Oct Nov - Dec
Jan Feb Mar
Apr May Jun Jul Aug'. Sep
1 DESIGN PHASE
2 Design
3 Advertisement
4 Bid Opening
1016
5 City Council �
I
�
I
j
. 12
1 1 0
6 .'. PERMITS
7 TAS
.9N0
8 RIGHT -OF -WAY
9 City of Irving
I
i
10 Response Received
10110
11 Approved
. 5/22
12 Dallas Water Utilities
13 Approved
6/6
I
14 TXU Electric
16 Response Received
10/9
16 Res
Response Received
P
I
. 7/23
17 Acquired by City
3112
18 Lot 11 River Ridge Addition
19 Acquired by City
6/6
20 HOA River Ridge Addition
21 Acquired by City
22 CONSTRUCTION
9/30
� eeting
Ili
_
1/6
Proceed
25 Construct
Project: SW 00 -01
Task Milestone . Summary ^ Deadline
Date: Fri 10/10/03
Page 1
RIVERCHASE SIDEWALK
SW 00 -01
PACHECO KOCH ENGINEERING
2 Design
On October 9, 2001 TXU decided not to approve the permit. Sidewalk will need to be redesigned to avoid conflict with TXU transmission lines. Working with TXU to resolve issue.
7 TAS
Plans were submitted by Pacheco Koch. Minor comments were incorporated into the final bid set.
9 City of Irving
First request sent on September 12, 2001. Second letter sent with revised plans on May 7, 2002,
10 Response Received
City of Irving did not approve permit - would not allow elevated portion of sidewalk within their easement.
12 Dallas Water Utilities
First letter sent on September 12, 2001. Second letter send with revised plans on May 7, 2002.
14 TXU Electric
TXU denied request for use of easement. The sidewalk must cross beneath the wires within a 50 -foot radius of the transformer tower. TXU sent letter dated March 20, 2002 which provided acceptable
areas for the crossing of the TXU easements. City sent letter March 22 with exhibit showing two options for the sidewalk layout.
16 Response Received
Did not approve the permit.
16 Response Received
Did not approve the permit.
17 Acquired by City
September 9, 2002 - TXU requested revised plat, wrong page number. PKCE revised.
23 Preconstruclion Meeting
Contractor requested that the Notice to Proceed be delayed. The work limits are not easily accessible because of all the recent rain.
26 Construction
WEEK 1 (Apr. 21 -26)
No activity .
WEEK 2 (Apr. 28 - May 2)
Graded area for the concrete on -grade sidewalk along Starleaf Drive.
WEEK 3 (May 6 - 9)
No activity.
WEEK 4 (May 12 - 16)
No activity .
WEEK 5 (May 19 -23)
No activity .
WEEK 6 (May 26 - 30)
Subcontractor for the elevated sidewalk started work on May 31.
WEEK 7 (June 2 -6)
No activity.
WEEK 8 (June 9 -131
Contactor started the installation of the helical piers - installed approximately three - fourths of the piers.
WEEK 9 (June 16 - 20)
Installed the joists, 4 "x4" posts, and decking, starting from Starleaf to the 2nd turn in the sidewalk.
WEEK 10 (June 23 - 27)
Worked on the installation of the horizontal rails.
WEEK 11 (June 30 - July 4)
Worked on the installation of the horizontal rails and 4X4 wiring.
WEEK 12 (July 07 -11)
Worked on the installation of the horizontal rails and 4x4 wiring.
WEEK 13 (July 14 - 18)
Worked on the installation of piers, headers, and joists from 2nd PI to 40 feet west of Bradford. Received information from the engineer for the installation of a 2x6 on top of the 44 posts.
WEEK 14 (July 21 - 26)
Poured the five foot concrete sidewalk along Starleaf. Constructed the handicapped ramps.
WEEK 16 (July 28 -Aug. 1)
Page 2
RIVERCHASE SIDEWALK
SW 00 -01
PACHECO KOCH ENGINEERING
Poured the eight foot sidewalk. Worked on the installation of the elevated sidewalk. Complete to within 40 feet of Bradford.
WEEK 16 (Aug.4 A)
Formed the eight foot sidewalk at the beginning of the elevated sidewalk and poured. Holly Barber, the school principle, wanted to know if the sidewalk would be completed before school started so she
could sent letter to the students. Contractor assured us that the sidewalk would be complete.
WEEK 17 (Aug. 11 - 15)
Completed the elevated portion of the sidewalk. Formed and poured the additional five foot sidewalk along MacArthur, that was added as change order. Waiting on a price from the contractor for
installing a top rail along the elevated sidewalk.