ST9301-EM030811FEE ESTIMATE FOR SANDY LAKE ROAD REVISIONS 11-Aug-2003 BASE OPTION Number of Sheets Sidewalk plan & profile 11 typical sections 4 cross sections 39 Drainaqe ~,, Riverchase drainage plan & profile 1 roadway plan & profile 1 drainage profiles 1 Storm Line vs Utility Encasement quantity takeoff/sheets Pot Holes for Utilities quantity takeoff/sheets Sprinkler Conduit typical sections 4 plan & profile 11 site visit to locate power coordinate with TXU HC Ramps civil details 1 plan & profile 7 process drawings with TAS Miscellaneous Revisions Provide 30 full size bond sets to City Provide 9 full size bond sets to City Revise horizontal/vertical control sheet 1 Contact Oncor for street light base detail 1 Revise fire hydrant call outs 37+40, 42+40 2 Caltout/Quantify manhole/valve adjustments 11 Add hydromulch limits/callout to plans 11 Revise driveway radii at west end nursery 1 Revise material called out in median per Parks Dept 11 Verify elevations of underground utility crossings Add DWU note at 44+00 1 General text editing on Traffic Control Plans 1 Revise TCP for three new entrances 10 Revise all roadway/drainage/striping for three new entrances 26 Revise General Notes 1 Add existing 12" water line on south side 6 Revise water meter re~ocation at 65+00 1 Add four water line stubouts to the north side 4 quantity takeoff/sheets 84 SUBTOTAL HOURS SALARY COSTS (Incl O/H & Profit) SUB-TOTAL DESIGN COST Number of Sheets OPTION 1 Cadd work for final record drawtngs, based on Gity's red lined markups 94 ISUBTOTAL HOURS I SALARY COSTS nc O/H & Profit) SUB-TOTAL DESIGN COST PROJECT MGR 2 1 2 2 2 4 1 4 1 12 4 2 5 0.5 18 60.5 489 $185 $120 $90 $73 $5,365 $7,260 $12,285 $25,185 $50,095 9 $1,080 $120 $840 TOTAL HOURS I HOURS PER SHEET 26 6.5 57 1 5 16 16.0 2 2.0 15 150 16 4,0 30 2.7 8 8 15 15.0 20 2.9 15 4 4 9 90 1 5 0.8 6 0,5 21 1.9 7 7.0 30 2.7 17 4 40 55 55 24 09 4 4.0 27 4.5 1.5 1 5 82 1.0 TOTAL HOURS 53 IOPTION 2 ~UU.U.~LmU r~o~H'e'~s~e~r~°*a'dw~ 'a~Y uWlnc~t h trom 28' to 2F SALARY COSTS (Incl O/H & Profit) SUB-TOTAL DESIGN COST DPTION 3 Number of Sheets _oRr Profile of roadway plan & profile drainage plan & profile cross sections retaining wall & culver~ sheets drainage profiles SUBTOTALHOURS SALARY COSTS (Incl. O/H & P L DESIGN COST PROJECT ADMIN SALARY COSTS O/H & SUB-TOTAL ADMIN COST MGR 4 8 4 2 4 22 $120 $2,640 PROJECT MGR $120 TOTAL BASIC DESIGN = DIRECT COST = TOTAL COST -- TOTAL HOURS HOURS 26 65 34 8 5 34 4 3 10 33 18 18.0 122 $10,810 TOTAL HOURS HOURS 42 $7,770 $76,455 $17,181 $93,636 Hours by Classification Manweeks by Classification Average hourly rate 81 2.0 99 175 465 737 2 5 4.4 116 184 $104 DIRECT COST DESCRIPTION Auto Mileage Postage, Couirer, Mail, etc TAS review fees Surveyor field survey for Kimbel Kourt area des. survey Riverchs & Xsections set 8 new control points ~lan Set Copying 30 sets bond for bidding 9 sets bond for construction Mylar Copies 11x17 TOTAL DIRECT COSTS UNIT UNIT QTY TOTALS PRICE $0 34 MILE 200 $6800 $50.00 MONTH 3 $150.00 By C~ty $2,000 LS 1 $2,000 00 $4,000 LS 1 $4,000.00 $8,000 LS 1 $8,000.00 LS $0.41 SHEET 2,820 $1,156.20 $0.41 SHEET 846 $346.86 $1500 SHEET 94 $1,410.00 $010 SHEET 500 $5000 $17,181