Loading...
DR0301-CS031013O LDEN PROFESSIONAL SERVICES, LP Earth Retention Engineering October 13, 2003 Ms. Suzan Taylor City of Coppell 255 Parkway Coppell, Texas 75019 Re: Shadow Ridge Estates Retaining Wall Preliminary Construction Drawings OPS # E0304 Dear Ms. Taylor, Please find enclosed two copies of preliminary construction drawings dated October 10, 2003 for the above referenced project for the City's review. Please provide us with any comments / revisions that you have so that we may incorporate them into the final drawings. Upon receiving the City's comments and/or approval, we will furnish final construction drawings and specifications within three (3) working days. One specific item that we wish the City to address is whether or not to include a provision (either as a paid contract item or subsidiary) for replacement of the trees that are to be removed for construction of the wall. This would not include the two trees at the staging area, which are to be replaced at the Contractor's expense should he elect to remove them per the current plan. An opinion of probable cost of construction of the detailed improvements has also been included. Thank you for yoLK with this matter. lark, P.E. PROFESSIONAL SERVICES, LP cc: Marios Kofteros, E.I.T. - OPS P.O. Box 5000 Little Elm, Texas 75068 Dallas 972 - 294 -5000 1- 800 - 422 -4667 Fax: 972-294-2664 ��V.L- 1.4 'C).�J