CF-Denton Creek Trail-LR031003Itants, Inc.
2970 S. Walton Walker, Suite 101
Dallas, Texas 75211
Phone: (214) 331-4395
Fax: (214) 331-4458
iGc~ ID'I6"
To: Mr. Steve Jeske
Jeske Construction Company
PO Box 59025
Dallas, TX 75229
Denton Creek/Ashbury Manor
Project: Hike and Bike Trail
Test Method: ASTM-D-698
Mold: 1/30 cu. ft.
Hammer:
Drop: 12"
Blows: 25
Layers: 3 ,
115
110
.:
LL
7
U
L
d
a 105
N
a
J
C
.-~
t
01
.~
~ 100
w
'c
95
90'
14 16
Time On: 2:30
Time Off: 3:30
Tech Time: 1.0 hr.
Tri Char e• 1
3101 Pleasant Valley Lane, Suite 101
Arlington, Texas 76015
Phone: (817) 467-5500
Fax: (617)468-9920
Job No.: 035225
ReportNo.: 1, page 1 of 2
Date: 10/03/2003
Cust. No.: --
Southwest center of pond at
ple: West Minister Court, dead end
:ription: Dark brown sandy clay
L' uid Limit: --
asticity Index:
Optimum Moisture: 19.9
Max. Unit Dry Weig 112. 7
22 24
OPTIMUM MOISTURE TEST
u. Ft-
p g TEAM Consultants, Inc.
Jm
cc: City of Coppell Park/John Elias ..~/-~,,..,..~ ~_~~ ~//
City of Coppell Park/Larry Davis Timmy Wooley, Supervisor
TBG Partners/Tom Woliver Construction Materials Testing
Moisture Content in Percent
TFOM Cnnsulta nts
TEAM Consultants, Inc.
2970 S. Walton Walker, Suite 101 3101 Pleasant Valley Lane, Suite 101
Dallas, Texas 75211 Arlington, Texas 76015
Phone: (214) 331-4395 Phone: (817) 467-5500
Faz: (214) 331-4458 Fax: (617) 468-9920
To: Mr. Steve Jeske Job No.: 035225
Jeske Construction Company Report No.:l, page 2 of 2
PO Box 59025 Date: 10/03/2003
Dallas, TX 75229 Cust. No.: __
Denton Creek/Ashbury Manor 15' west of fear_e line at 615 Wati~
Project: Hike and Bike Trail Sample:of West Minister
Test Method: ASTM-D-698 Description: Dark brown and brown sandy
Mold: 1/30 cu. ft. ~° clay with occasional gravel
Hammer: 5.5# Liquid Limit: --
LL
7
U
i
d
a
N
a
c
r
m
.~
.~
1
1
1
1
Moisture Content in Percent
OPTIMUM MOISTURE TEST
TEAM Consultants, Inc.
Ft.
Inc