ST9902-CS031017
1Il~ r~~~su.~u~~~t-. ~o'!s~Tf:!IRKINS
October 17, 2003
Kenneth M, Griffin, PE
Director of Engineering & Public Works
City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019
RE: Reconstruction of West Sandy Lake Road, Phase I
S.H. 121 to Coppell Road North
Dear Ken:
Attached you will find two (2) 22" x 34" full size sets and two (2) 11" x 17" half size
sets of Preliminary Plans for the referenced project for your review, The plans have
been prepared to reflect your comments on the schematic submittal as well as
resolutions from our meetings over the past few months, Please note that the plans
do not include construction sequencing sheets or pavement marking plans, We are
still finalizing those items and anticipate bnnglng ttlem to our meeting on October
28th
The plans are not one hundred percent complete and there are still some issues to
be resolved, It is our intent to prepare list of questions and discussion items to send
to you early next week along with our Preliminary Opinion of Probable Cost One of
those items will be an alternate four-lane asphalt transition at SH 121 in lieu of the
two-lane transition shown in the plans,
Please call if you have any questions about this information,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
/
.c-,t(
enc,
..r:::x--A:JI_
17 (7)/,,' ("')'2:
12160 NORTH ABRAMS ROAD, SUITE SOB
DALLAS. TEXAS 75243
(214) 46/.9867
FAX (214) 461.9B64