Loading...
ST9902-CS031017 1Il~ r~~~su.~u~~~t-. ~o'!s~Tf:!IRKINS October 17, 2003 Kenneth M, Griffin, PE Director of Engineering & Public Works City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 RE: Reconstruction of West Sandy Lake Road, Phase I S.H. 121 to Coppell Road North Dear Ken: Attached you will find two (2) 22" x 34" full size sets and two (2) 11" x 17" half size sets of Preliminary Plans for the referenced project for your review, The plans have been prepared to reflect your comments on the schematic submittal as well as resolutions from our meetings over the past few months, Please note that the plans do not include construction sequencing sheets or pavement marking plans, We are still finalizing those items and anticipate bnnglng ttlem to our meeting on October 28th The plans are not one hundred percent complete and there are still some issues to be resolved, It is our intent to prepare list of questions and discussion items to send to you early next week along with our Preliminary Opinion of Probable Cost One of those items will be an alternate four-lane asphalt transition at SH 121 in lieu of the two-lane transition shown in the plans, Please call if you have any questions about this information, Sincerely, TEAGUE NALL AND PERKINS, INC. / .c-,t( enc, ..r:::x--A:JI_ 17 (7)/,,' ("')'2: 12160 NORTH ABRAMS ROAD, SUITE SOB DALLAS. TEXAS 75243 (214) 46/.9867 FAX (214) 461.9B64 L:., r-6..o. _ ........"7