Loading...
ST9301-CS031010From: To: Date: Subject: "Kiger, Debbie" <Debbie. Kiger~jacobs.com> "'Suzan Taylor'" <staylor~ci.coppell.tx.us> 10/10/2003 10:17:16 AM Barrier Free Ramps Suzan, The current ADA standards allow for a comer ramp, with 48" clearance in the crosswalk. See the attached detail. We have heard that the law may be changed in the future to require separate ramps for all directions. We don't know the status of this proposed change. Would The City like us to design the ramps as comer ramps or separate ramps for each direction? Debbie NOTICE - This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying or distribution of, or reliance on this message by unintended recipients is strictly prohibited. If you have received this message in error, please notify us immediately by replying to the message and deleting it from your computer. $-II¥.L3Q ONIAVd ~,~ )~*'~...~, S lW3a s o3Nvqq3DsI 'S'.L'N (~J:~13 IqOl:l_-I ),rMV ~AgVM) 91¥130 InON~FII ~399V 133WIS 9NII33SW31NI 1¥ 91¥130 dl~¥W 33WJ W31WW¥~ 133W±S ',9 NVHI W31¥3W9 IHOI3H HIIM S~W~]3 WOJ Aq31VNOlIWOdOWd 03SV3WDNI 3B IS~]~ SNOISN3~I~ 'SBWfl3 .9 WOJ 3WV NMOHS SN91S3(] '~ 'SNOISN3PIIO 9D9 ~A]¥M301S 9NIMOHS 91V130 WOJ §OOB 39Vd 33S 'SBWfl3 ±33~1S /SNIVOV SdPtYW 33Wa W31WW¥9 ]IV HIIM (]3~1n03~ 3B ]]VHS NOIIVZIqlSVI$ 3aYaoBflg aNV S~¥MA3N 'SOft] NqVM301S '1 :S310N 'STN H-H NOII03S 'STN a-o NOI133S 'S'I'N meno 9NIIInBY )JlVM) 91¥130 l~lONWnl A399V 'STN (BBflg 9Nl±lflS¥ ~9~M) 133W±S 9NII33SW3±NI IV 91V±30 d~¥W 33B~ W31WWVB From: To: Date: Subject: "Kiger, Debbie" <Debbie. Kiger@jacobs.com> "'staylor@ci.coppell,tx.us'" <staylor@ci,coppell.tx.us> 10/10/2003 2:48:05 PM 12" water line Suzan, As I reviewed the plans you had sent me for the 12" water line on the south side of the road, I see that the 1997 plans for Riverview had tied into an existing 12" line to the west (at Riverchase). We don't have plans or information for any 12" water line to the west, Does The City have more information? Does the 12" line just keep following the ROW line along the entire length of the road? We'd like to show it since we are revising the drawings now. Debbie Kiger, P.E. Jacobs Civil Inc 6688 N. Central Expwy Suite 400 Dallas, TX 75206 214-424-7579 NOTICE - This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying or distribution of, or reliance on this message by unintended recipients is strictly prohibited. If you have received this message in error, please notify us immediately by replying to the message and deleting it from your computer.