Loading...
ST0202-CS030930COPP-F_.EE September 30, 2003 Tiseo Paving Company David Dendy 419 E. Hwy 80 Mesquite, TX 75150 RE: Bethel School Road Project #ST02-02 Dear Mr. Dendy: At the September 23, 2003 City Council meeting, the referenced project was awarded to your finn. Enclosed with this letter are three original contract documents and Change Order #1 for the sodding on the postal facility property. Please execute the three originals of each document; provide the required bonds and return two of the originals to the Engineering Department. One of the copies of each document is for your file. The inspector on this project will be Garreth Campbell. To schedule a preconstmction conference on this project Garreth can be reached at 972/304-3685. If you have any questions please feel free to give me a call. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-704 1