Champions-CS031028T H E O 1 T Y O F
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Patrick Popowitz -SMITH COMMERC/JI,A~I.
From: Larry Davis, Construction Inspector%~///`p,,c
Office Phone: (972) 304-3684 • yll6//~-~
Fax: (972) 304-3570
Date: October 28, 2003
RE: BARRICADES IN DRIVE APPROACH
As previously discussed on several field visits with staff representing Smith
Commercial and you via faxes, I am requesting that you follow MUTCD standards
for bamcade materials per your approved traffic plan.
In this case, the location is the new Denton Tap Rd. drive approach to your site.
Please correct the situation immediately as it is a potential traffic hazard, and call my
office as soon as the correct barricades are in place.
cc: Henry Santamaria, Owner
"CITY OF COPPELL ENGINEERING -EXCELLENCE BY DESIGN"