ST0202-CS021011FRANCHISE UTILITY COMPANIES
CONTACTED:
RESPONSE
TXU COMMUNICATIONS ....................
MARK WILSON
115 W SEVENTH ST, STE 308
FT WORTH, TX 76102
ONCOR ELECTRIC DELIVERY CO .........
DAVID DEAN
1015 HUTTON DR
CARROLLTON, TX 75006
ONCOR ELECTRIC DELIVERY CO .........
RICK FIELDING
14400 JOSEY LANE
FARMERS BRANCH, X 75234
AT&T BROADBAND ...........................
BILL MORGAN
135 HOUSTON ST
LEWISVILLE, TX 75057
AT&T LOCAL NETWORK SERV ...........
MICHAEL J. EARLY
5501 LBJ FRWY., SUITE 810
DALLAS, TX 75240
MCLEOD USA ..................................
ROGER CLON1NGER
15601N DALLASPKWY, STE700
RESPONSE
ONFIBER COMMUNICATIONS ..............
TIM NORRIS
1820 N GREENVILLE, STE 114
RICHARDSON, TX 75081
QWEST COMMUNICATIONS ................
PAUL GONZALES
1860 LINCOLN ST., STE 200
DENVER, CO 80295
SOUTHWESTERN BELL ........
PETER RUSSELL
3 SBC PLAZA, ROOM 2124
308 S AKARD ST.
DALLAS, TX 75202 /0/
TOUCH AMERICA .................. ...~ ........
MARK PAFFHAUSEN130 N MAIN
BUTTE, MT 59701
VERIZON COMMUNICATIONS ..............
OLGA SAUCEDO
540 W ELM ST
LEWISVILLE, TX 75067
DALLAS, TX 75001
COSERV ELECTRIC
BRIANTOMLINSON
7701 S STE~ONS
CO--TH, TX 75065
EXPLORER PIPELINE CO. - ...................
PATRICK NWAKOBY
6846 S CANTON
TULSA, OK 74136
TOMMyMETROMEDIA FIBER NETWORKcAPPS ~ .......... 2'~~
5430 LBJ FRWY., STE 1400
DALLAS, TX 75240
October 11, 2002
ONCOR
Rick Fielding
14400 Josey Lane
Farmers Branch TX 75234
Bethel School Road (fi-om Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Fielding:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Depaxtment with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
If I can answer any additional questions, please feel free to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
From: Ken Gdffin
To: ffieldil~oncorgroup.com
Date: 11/1/02 11:50AM
Subject: Re: Utility Locations
Rick
I'm not sure I understand your email. Are you stating that ONCOR & TXU Gas will no longer mark up
plans and return them or are you stating that we need to send the plans to Mr. Trojan? If you do not mark
plans how will you know what needs to be relocated?
A clarification would be appreciated.
Thanks
ken griffin
>>> <rfieldil@oncorgroup.com> 11/01/02 11:15AM >>>
At this time ONCOR Electric and TXU Gas does not provide maps showing
locations of utilities. Underground Locates can be requested from Dig TESS
(1-800-344-8377). Existing Overhead Utilities can be tied down with
onsite Surveyors .....
You are more than welcome to send someone to this office to review any maps
that we have available and transfer that info to your maps ...... However
our maps will not tie down exact locations, but will only provide what side
of the street that they are I~)cated on ....
This letter is in response to request dated as follows:
September 18,2002- Sandy lake Road/ST 93-01...
October 11,2002- Bethel School Road from Denton Tap to Heartz Rd. / ST
02-02 ....
All Road improvements and road widening projects are handled by our Major
Design Group.
In regard to these matters please contact Larry Trojan @ 214-875-2255..
Thanks!!!!
Confidentiality Notice: This email message, including any attachments,
contains or may contain confidential information intended only for the
addressee. If you are not an intended recipient of this message, be
advised that any reading, dissemination, forwarding, printing, copying
or other use of this message or its attachments is strictly prohibited. If
you have received this message in error, please notify the sender
immediately by reply message and delete this email message and any
attachments from your system..
October 11, 2002
TXU Communications Services
Mark Wilson
115 W Seventh St, Suite 308
Ft Worth, TX 76102
Bethel School Road (from Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Wilson:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
If I can answer any additional questions, please feel free to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
October I 1, 2002
ONCOR Energy Delivery
David Dean
1015 Hutton Dr
Carrollton TX 75006
Bethel School Road (fi.om Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Dean:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Depa~ta~ent with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
If I can answer any additional questions, please feel free to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
October 11, 2002
AT&T Broadband
Bill Morgan
135 Houston St
Lewisville, TX 75057
Bethel School Road (from Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Morgan:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
If I can answer any additional questions, please feel free to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
A-T-&-T
Our cable runs o,~er head alone Bethel School Rd., with power.
We go underground, at Hidden Valley a~d at Oakbrook. Where we follow
Easments, going to the south.
1 highlightcd the map with blue at our over head locations. The green high light is our underground
locations.
P]ease advise when this project will start.
~mm~l
Construction Coordinator
Office ~ 972-436 2402
Cell ~ 214-869-7730
COFFELL
October 11, 2002
AT&T LOCAL NETWORK SERVICES
Michael J. Early
5501 LBJ Frwy, Suite 810
Dallas, TX 75240
Bethel School Road (from Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Early:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
If[ can answer any additional questions, please feel free to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
October I l, 2002
McLeod USA
Roger Cloninger
15601 N Dallas Pkwy, Suite 700
Dallas, TX 75001
Bethel School Road (from Denton Tap Rd. to Hear~z Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Cloninger:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Depa~h~ient with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
If I can answer any additional questions, please feel free to contact me.
Sincerely,
K~M. ~ ff~n, p.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
October 11, 2002
COSERV
Brian Tomlinson
7701 S. Stermmons
Corinth TX 75065
Bethel School Road (fi.om Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Tomlinson:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
If I can answer any additional questions, please feel fi.ce to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
October 11, 2002
EXPLORER PIPELINE
Patrick Nwakoby
6846 S Canton
Tulsa, OK 74136
Bethel School Road (from Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Nwakoby:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
If I can answer any additional questions, please feel free to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
October 11, 2002
METROMEDIA FIBER NETWORK
Tommy Capps
5430 LBJ Frwy, Suite 1400
Dallas, TX 75240
Bethel School Road (from Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Capps:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
IfI can answer any additional questions, please feel free to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
MFW
October 23, 2002
Mr. Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
City of Coppell
255 Parkway
P.O. Box 478
Coppell, TX 75019
Bethel School Road (from Denton Tap Road to Heartz Road)
Project #ST 02-02
Utility Locations
Dear Mr. Griffin,
Thank you for your notification of the above referenced project. Please be advised that
Metromedia Fiber Network does not have a presence within the above referenced scope of work.
Should your project plan change, please send notification using the contact information provided
below.
If you require any further information, please contact me at (972) 778-8927.
Project Coordinator
J anice. Scott (~,m fn.com
Enclosure
5080 Specmam Drive, Suite 1210W ,, Addison, TX 75001 * TEL 972-778-8900 * FAX 972-778-8990
October 11, 2002
OnFIBER CARRIER SERVICES
Tim Norris, Operations Mgr.
1820 N Glenville Dr., Suite 114
Richardson, TX 75081
Bethel School Road (fa'om Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Norris:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
IfI can answer any additional questions, please feel fi'ce to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
October 11, 2002
QWEST COMMUNICATIONS
Paul Gonzales
1860 Lincoln St., Ste 200
Denver, CO 80295
Bethel School Road (from Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Gonzales:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
IfI can answer any additional questions, please feel free to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
T H E: · C: I T Y 0 F
COPPELL
October 11, 2002
SOUTHWESTERN BELL
Peter Russell
3 Bell Plaza, Room 2124
308 S Akard St
Dallas, TX 75202
Bethel School Road (from Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Mr. Russell:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
IfI can answer any additional questions, please feel free to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
PARKWAY 1~ P O BOX 478 ~ COPPELL TX 75019 * TEL 972/462 0022 }¥ FAX 972/304 3673
have ~e~ved your ( )~nfor~ation ~eq~est ~e~er, ( )~a~,
')P,reliminary, ( )Final, ( )Revised plan~, and de~a.-minec that:
(~We have no facilities involved.
( ) Our facilities are shown correctly on Youc Plans.
( ) We have ( )existin~ or ( )Proposer ( )buried ( )aerial ( )conduit facilities which maw be invo!veC.
( ) Conflicts appear at this time to be:
( ) ~ino~ - Work with Coatracto~'durin~ construction.
( ) .No apparent conf!ictJ.' PleJse send ccp~;.of any
future p~an revisions rom cum review. '~'.".
( ) Undetermined -- ~ill reply aft=-
We are sendin~ you ( ) attached, ( ) under separate cover,
the followin~ items:
( ) Your print with apprOXimate location of %um facilities shown in red.
( ) Preliminary plans showin~ PrOOOSed future !orations of
our facilities. '
( ) Plans showin~ our existin~ facilities.
( ) Please call f-f~O-3~-~377 to set
~or SWST to !oca~e an~/oc e~ose - - '
racllit~s
crew to take elevation
may De a conflict.
Additional remarks:
WiRE CENTEF~:~~
ENGINEER:~
Con~ac~ Telephone Number"
October 11, 2002
TOUCH AMERICA
Mark Paffhausen
130 N. Main St
Butte, MT 59701
Bethel School Road (from Denton Tap Rd. to Heartz Rd.)
Project//ST 02-02
Utility Locations
Dear Mr. Paffhausen:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
IfI can answer any additional questions, please feel free to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
From:
To:
Date:
Subject:
"Paffhausen, Marc" <MPaffhausen@tamerica.com>
<kgdffin~ci.coppell.tx.us>
10/21/02 4:44PM
Bethel School Road Project #ST 02-02
Per our phone conversation this afternoon, please accept this e-mail as formal notification that the
TouchAmerica facilities are not affected by the proposed project above. I did note at the bottom of you
drawings that you had my direct phone number listed for TouchAmedca notification by contractors prior to
any excavation. That number should be changed to our 1-866-491-5540 contractor number. This is not
the one call locate number on our cott markers, which still needs to be used prior to doing any work in the
field.
Marc
CC: "Piazzola, Jerry" <JPiazzola@tamedca.com>, "Dennehy, Kevin"
<KDennehy@tamedca.com>, "Cunningham, David" <DCunningham@tamerica.com>, "Klobucar, Henry"
<Klobucar@tamerica.com>
T H i' . ~ ! T Y · 0 Ir
COPPELL
October 11, 2002
VERIZON COMMUNICATIONS
Olga Saucedo, Assoc. I.P.
540 W Elm Street
Lewisville TX 75067
Bethel School Road (from Denton Tap Rd. to Heartz Rd.)
Project #ST 02-02
Utility Locations
Dear Ms. Saucedo:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
IfI can answer any additional questions, please feel free to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure