Loading...
ST9902-CS010605 , - 51 C(Q-02- sa~ L-c4Ce.. "" June 5, 2001 Southwestern Bell Attn: Mr. Bob Kearney 1430 Empire Central, Suite 110 Dallas, Texas 75247 Re: West Sandy Lake Road Roadway Widening City of Coppell, Texas Dear Mr. Kearney: Teague Nail & Perkins, Inc. is currently working on the schematic design for the above referenced project. In an effort to determine the impact of existing underground utilities, we request that you review the attached locator maps and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas. If your records show that you have existing facilities within the affected sites, please provide us with a copy of your utility maps for each of the areas, or prepare a marked-up copy of the locator maps accurately depicting your facilities. If at all possible, I would like to have this information from you by June 13 in order to prepare the schematic plans and report that will be presented to the City. Please call me if you have any questions. Thank you for your cooperation and assistance. Crossing intersect interruption Sincerely, TEAGUE NALL AND PERKINS, INC. Edward D. "Jed" Sulak, Jr., P.E. eds enclosures C:IUNZIPPEDlUTILlTIESIUTILlTY LETTER DOC , - June 9, 2001 Southwestern Bell Attn: Mr. Bob Kearney 1430 Empire Central, Suite 110 Dallas, Texas 75247 Re: West Sandy Lake Road Roadway Widening City of Coppell, Texas Dear Mr. Kearney: Teague Nail & Perkins, Inc. is currently working on the schematic design for the above referenced project. In an effort to determine the impact of existing utilities, we request that you review the attached locator map and indicate whether or not any of your existing utilities fall within the anticipated construction areas. If your records show that you have existing facilities within the affected sites, please provide us with a copy of your utility maps for each of the areas. If at all possible, I would like to have this information from you by June 15 in order to prepare the schematic plans and report that will be presented to the City. Please call me if you have any questions. Thank you for your cooperation and assistance. Sincerely, TEAGUE NALL AND PERKINS, INC. Edward D. "Jed" Sulak, Jr., P.E. enclosures C:IUNZIPPEDlUTILlTI ESISWBT. DOC August 29, 2001 Southwestern Bell Attn: Mr. Bob Kearney 1430 Empire Central, Suite 110 Dallas, Texas 75247 Re: West Sandy Lake Road Roadway Widening City of Coppell, Texas Dear Mr. Kearney: Thank you for sending us the Southwestern Bell facilities maps for the area along Sandy Lake Road from SH 121 to Denton Tap Road. We have added this information to our topographic survey data and have enclosed a map of this information. Please review the information in the map and determine if the existing utility information has been shown correctly. Please note that we have reflected the proposed roadway improvements in the drawings in an effort to determine any potential utility conflicts. We will continue to complete the schematic design plans and submit this to the City. Please call me if you have any questions. Thank you for your cooperation and assistance. Sincerely, TEAGUE NALL AND PERKINS, INC. Edward D. "Jed" Sulak, Jr., P.E. Cc: Ken Griffin, P.E. Director of Engineering & Public Works City of Coppell Enclosures C:\UNZIPPEDIUTILlTIESILETTER $WBT MAP.DOC