Loading...
Assured Self-CS030820 (2)"' Lr~3S 16:19 9?22232605 _____ _ _ _ , _ _ ASSURED GROUP 1g_)g INSTALLATION OF SPRiNXLEA SySY£MS_ I Contractor's Material and Test Certiftcatt: for U ndergraund Piping f lSport cCrnpreTau+nt ~, ki\PaaUan am (aeN ahpa M mach fr/ the oontratswt raprM4rnatNe std Nrtnebsay PY An pwner e '9oteaenlahra. WI detara anon be umrreC7ed any syAlem'AN! in BrtNInA BaWte COmraVtoi 6 personnel !Ine1N loave lee pp. A ooyiacaN arts!! bs anwf ou! any \lyney by both repraeerA\tNee. Copes anon W prepared br approving aumpdtias, awrra+a, arty comracb~r. If la unyaAtood die Fen\r's rapre9ampiw'a eyn\fura In na wdy prajutltas prry calm apa+nat comracror Nr leuby malarial. Doer wwkrtenahlp, Or teHUrB b PDmPIy Mln appmving suaroidy's raoutrgManN pr IoC\I noe6. _~~~ PROPERTY NAkI/? ~ ~Q ,,,,/ ~ y DATE PROPERTY 0.DORES6 ~~t]I L"~P ~71~nA R~Gri) ( d7.1AP ~l /~]"~/,r~!t PUNS INSTALLATION CONiORMg TD ACCEPTED PLANg C] YEIS- u N~ IF.WIPMENY USEDIg APPROVED [] YES L„ NC IF NO. STATE DEVUTrON$ NAS PEq$ON IN CFIAPGE OF FIRE EOWPMENT BEEN INSTRUCTED AS ~ y ^ YES ~ NO TO LOCATION OF CONTROL VALVES AND CARE AND MAINTENANCE OR THIS NEW @OUIPMENT7 IF NO. EXPLAIN INSTRUCTIONS i ._ _. i HAVE COPIES CF APPROPPU+TE INSTRUCTIONS AND CAPE AtN ~ - YES ,'a NO j MMNTENIANCE CHApfS BEEN LEFT ON PAEMrSE57 LOCATION ',SUPPLIES BUI(AINOS -~ ~ -' ---~- I ~ L ~ ~. _ ~ PIPE COtaFORM3 TD _~_.+ STANDARD ["] ygg ~ AV? q~ MRM TD STANMRO UNDERGROUND ~~ NO £XVI ~I YCg (1 NO , . PIPES AND I .h]ya7S _ _ _ P I, INTS NEEDING ANCHORAGE cUMPED, STRAPPED. CR BLOCKED IN I~ YE$ ~' MO ACGDRDANCE WITH ~_,. STANDARD IF NO. EXPLAIN fJSL$f9C(~' Fbv the raoVked rata lmyl velar is alapr es intliaaled by no CPIIaFCIan at Iweyn maNnal in burlap bags al eases auen u hybenN and Warroaa Flush EI AeA.s not Nse than app GPM (1478 UrNnS for d-hch plpa. 880 GPM (9371 UrMnl }w1S1ncR Pipa, 1588 GPM {89fY Umm) far 6fncn Ptp.24dD GPaa (8235 Umin) Nr f p-kiFh ADa. and 3520 GPM (73323 LRnin) laf f2~lncn PWa. YAIan aU{ply cannot profMce atlptAAted Mri :91a6.Obtain meaimum avaiiaDN. HYDPO$TAT)C: NYdrCSlanC Nets ahaa ba maps at nrn iasa thM 280 pAl (T3.8 pare) for aYV nw,n a SC Pai (3.4 ban) TEST ~ eWVe at\ac PrpFabnf In eXCabs re T5t1 pal (70.9 ba+eJ Tor lw0 hoWa, DESCRIP7pN I LEAKAGE- New PIPe 6114 with cypher pukMed lokrlt Melt II Ina workmavMp Is saparaclory, have falfe M rq Isakapa 91 I Ue 1dnN- The eaqura d Nakage at the iomts ehali r~ \xCead 2 d~. par nr. (f,e9 LM) par 1Iq jplrtta ineapacdve at pipe I dtemMar Tne leakage rhea ha dlatdhuNd over as 11 I eonektaree ureayttryay ens neea'uey,apyn me) ee~Tho a10mo1u t~d~llo e~ (ew )Dices (he InatallaUPn anon pe 111 dreeaed by t a a vac Irt. valve diMnaNe per h.. (901n2.J15 malls) !or aaell ksge apeaaNd above nVIY tN rY parcel hydrenN Ma foaled edtn Ina maM val+s apart. so the a ~~ 69atad vanp Isaatlng the NOI rNaGan. 1 ttka9e Is nYdr rtt6 ere wyar pt\s6u:p, an add r ~ .. mtrnd4 (t50 mLrmin k permlM7d lorexn+yyram. iaoly,5ox NEW tMDl110ROUND~ p LUSHED ACCX+odNp-D IF NO. Exv S TANJAgp BY (COMPANY} ~ /veC FLUSNING ~NDW FLUSMtNG FLOW W~~AMED -~--~-- TESTg ICPUBUC WATER G,]TAKK qR RESERVOIR ~' T~'IWGN Wile' Y~ LEAD-IYSR ESU H DACCORDM~G ^'~TO ~.JF~~_P ~NYDgµT-B~.,_._...._~NiNO IF NO. EXPtgtN STANQagD BY (CDM~ataye '"rte-~'~---~N PIPE ti rtV W WAS OB'AINED C~UaucWATEq []iANttOagE 40(/GN .._"~_-~.-,` `~~ OFtgE '~1J1C ~. WNAY~ ~OETtlNG ~ 3 TTO FLAIL ~t>P@N P(PF s-caeca Rt(bi Peer t. teas Etllnan i, 09'20;2003 16:18 9722'L32606 ASSURED GROUP PAGE SYSTEAf Af.'CEPrnNCF NYDRAUUC ~ NAMEPUiTE PROVIDED I iF NO. EXPLAIN NAMEPLATE ~ ~ YE6 ~ NO j - ; DAYE I$FT fN SERVICE WITN AL4 CONTROL VMVES OPf:N REMARKS -~ NAME OF fiPRINKLER CONTRACTOR ~ /~.~ /}~-. • ~_r \ SIGNATURES _~~ ~ FO PROP TY I E l DA ~ TITLE FO ER C PR O) T7LE f ~tTE~.' /~ ADDITIONAL EXPtA.NATION AND NOTES -/ riFare &1Id Pm !. tor's test connection and shall rtxvlt in an audible alarm on the premises wirhin 3 min after such Dow begins and until f such flow' stops. 8-Y.42 A working test of the dry pipe valve alone, and with a quick-opening device, if installed, shall be made by open- ing the inspector's test connection. The less xhall measure the time to trip the valve and the time for water to be dis- charged From the inspector's test connection. All times shall bC measured from the time Lhe inspector's test connection is completely opened. The results shall be recorded using the Contractor's Material and Test C.erti6cate For :16oveRround Piping. 8-Y,4.3 The automatic operation of a deluge or preactinn valve shall be tested in accordanre with the manufatzurer's instructions. The manual and rrmnte control operation, where prescnq shalt also be tested. 8-Y.4.4 The main drain valve shall be opened and remain open until the system pressure stabilizes. The static and residual pressures shall be recorded on [he contractor's test certificate 8_Y..S Fach pressure-reducing valet shall be tested upon. completion of installation to ensure proper operation under flow and no-slow cnnditione. Trsting shill verify that the device properly regulates oudet pressure at both maximum and normal inlet pressure condinnns. The readts of the flow test of each pressure-reducing valve shall be recorded on the camracrcx's test certifiure. The results stlall include the static and residual idler. pressures, static and residual dotter pressures, and the flow rate. &Y.fi The backFlow prevention assembly sha13 be forward Elow rested to ensure proper operation. The minimum flow rate shall be the system demand, including base s[re+m demand where applicable. 13-77 8.2.1 Operating tests shall be made of exposure protection rysrems a on completion of the installation, when surh tests do not risk water damage to the building on which they are installed or ro adjacent buildings. 8.3 Ciroulaling Cloled loop Syltemn. Fnr sprinkler sys- tems with nonfirc protection connections, additional infor- mation shalt be appended to the Contractor's Material and Test Certificate shown in Figure 8• I (a) as follows: (a) GertiKtation char all auxiliary devices. such as heat pumps, circulating pumps, heat exchangers. radiators, and luminanrs, if a parr nFthe system, have a pressure rating of ar, least l75 psi or 3(19 psi (lY.l or Y0.7 bars) if exposed rn pressures greater than 175 psi (12.1 bars). (b) A!1 components o[ sprinkler system and auxiliary sys- tem have been pressure tested as a rnmposite system in accordance w;th 9-Y.2. (c) Waterflmv tests have been conducted and waterflow alarms have operated while auxiliary tquipment is in each of the possible modes of operation. fd) Kith auxiliary equipment rested in each pax.eiblc mode o£ operation and with no flow from sprinklers or teat connecton, waterliosv alarm signals did nor opera rn. (e) Excegs temperature controls for shutting down the auxiliary system have bcen properly Gcld tested. S•4 Instructions. 8-4.1 The installSng contractor shall provide the owner with: {a) All lireraturcand instructions provided by the manu- facrnrer describing proper operation and maintenance of any equipment and devices instilled. (b) PublirPriun tided iv'FPA Y9, Stnndnrr! for IA[ l+trpnrtivx, Testing, and Mointenancr, of Wafer-{carol F+rr T'rotrrtinn Syrtom.<, [rlSa Edltlon 03 Q