Loading...
Sherrill L2B-CS030930T H E • C 1 T Y • O F September 30, 2003 Fred Donaldson Tri-Star Construction fax 972- 219 -7099 RE: Angier's Professional Building Final Walk -thm Dear Fred: Please be advised that a walk - through has been scheduled for Wednesday, October 1, 2003 at 9:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972- 304 -7090 at your earliest convenience. Sincerely, , 6D,& Rick O'Dell Construction Inspector Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: Ken Griffin, Director of Engineering & Public Works Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Roland Asebedo, Deputy Fire Marshal