Sherrill L2B-CS030930T H E • C 1 T Y • O F
September 30, 2003
Fred Donaldson
Tri-Star Construction fax 972- 219 -7099
RE: Angier's Professional Building
Final Walk -thm
Dear Fred:
Please be advised that a walk - through has been scheduled for Wednesday, October 1, 2003 at 9:00
a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please call
972- 304 -7090 at your earliest convenience.
Sincerely,
, 6D,&
Rick O'Dell
Construction Inspector
Office Phone: (972) 304 -7090
Fax: (972) 304 -3570
cc: Ken Griffin, Director of Engineering & Public Works
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
Roland Asebedo, Deputy Fire Marshal