First Baptist-CS031021October 21, 2003
Ms. Teresa Turner, City Engineering Coordinator
Mr. Ken Griffin, City Engineer
Engineering Department City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019
Re: Grading and Drainage Phillips Tract Hidden Valley, Coppell
Dear Ms. Turner and Mr. Griffin:
The purpose of this correspondence is to notify the City of Coppell of my approval for allowing the
First Baptist Church of Coppell, adjacent landowner to the west of my property, the permission to
install additional soil and grade beyond their new parking lot area and onto my northwestern property
line to an approximate distance of fifteen feet (15 ft.) to help ease the slope condition and provide
fill for this area of my property. The attached drawing better describes the location.
The First Baptist Church has agreed to reconfigure their parking lot grading to drain and outflow to
the Northeast corner of their parking area instead of sheet flowing as previously designed. They are
installing a curb inlet at this location to collect and pipe their storm water into a below grade storm
sewer system that would tie into a future system on my property. As you are aware, this was
discussed and agreed with you, Bill Anderson of Dowdy Anderson, and members of the church
building committee on Friday, August 15, 2003.
This letter provides the requested approval that you requested. If you need anything further, please
do not hesitate to contact me.
Respectfully.
David Phillips
453 Hidden Valley
P. O. Box 101
Coppell, Texas 75019
972- 471 -2042
pelletholder(Thaol.com