Loading...
Freeport NIP(7.0)-LR031028RoneEngineers to Client: Duke Realty Services, 1.1 Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENGTH: SLUMP (in): AIR TEST METHOD: CYLINDER MARKED SET NO. 1 1 5.25 1 2 5.25 1 3 5.25 1 4 4000 psi 28 Days 3" 5" 3% 6% ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 MEASURED SLUMP (inches) DATE TESTED 10/06/2003 10/27/2003 10/27/2003 Hold 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MIX DESIGN LD.: 7752 PLACEMENT DATE: 09/29/2003 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED. 5'20am BATCH TIME: 5:01am TEMPERATURE (F) AIR 57 F CONCRETE: 74 F TRUCK NO: 108 TICKET NO: 500 AIR CONTENT (95): 4.6 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Northwest parking from northwest entrance, 210' east, 180' south and 270' west SAMPLE LOCATION: Northwest entrance, 50' south, 10' west REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) AGE (days) 7 28 28 MAXIMUM LOAD (lbs. force) 121885 142010 143635 Average Report No.: Project No.: Date of Service: Report Date: COMPRESSIVE STRENGTH (psi) 4310 5020 5080 5050 195426 037333 09/29/2003 10/28/2003 FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DD Page 1 of 3 RoneEngineers Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi 28 Days SLUMP (in): AIR TEST METHOD: ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 CYLINDER MARKED SET NO. 3% 6% AIR CONTENT 5.5 UNIT WEIGHT (pcf): NA MEASURED SLUMP (inches) 2 1 5.5 DATE TESTED 10/06/2003 2 2 5.5 10/27/2003 2 3 5.5 10/27/2003 2 4 Hold Water added at site: 10 gallons CONCRETE COMPRESSIVE STRENGTH TEST PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) MIX DESIGN I.D.: 7752 PLACEMENT DATE: 09/29/2003 WEATHER CONDITIONS• Clear TIME SAMPLED: 7:20am BATCH TIME: 6:44am TEMPERATURE (F) AIR 59 F CONCRETE: 82 F TRUCK NO: 101 TICKET NO: 510 OVERALL PLACEMENT LOCATION: Northwest parking from northwest entrance, 210' east, 180' south and 270' west SAMPLE LOCATION: Northwest entrance, 60' east, 15' south AGE (days) 7 28 28 MAXIMUM LOAD (1bs. force) 117775 137805 134620 Average 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 Report No.: Project No.: Date of Service: Report Date: COMPRESSIVE STRENGTH (psi) 4160 4870 4760 4820 195426 037333 09/29/2003 10/28/2003 FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap LIMI1 A 1iUrw t he rear MUDS pruenteu wren were prepareu omen upon in youth, sarnprea pruvmat un rsauug. vve assu au zeapuuarumry mr varmuuu m quaaty (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DD Page 2 of 3 RoneEngineers or Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placeme nt locations, perform required field testing, cast samples back to the laboratory for curing and tes ting in accordance with applicable standar ds. CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENGTH: SLUMP (in): AIR TEST METHOD: CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 3 1 5.5 3 2 5.5 3 3 5.5 3 4 Technician: Shawn Deal Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Potter Concrete 4000 psi 28 Days 3" 3-511 3% -6% ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) DATE TESTED 10/06/2003 10/27/2003 10/27/2003 Hold CONCRETE COMPRESSIVE STRENGTH TEST co r PROJECT DATA MIX DESIGN I.D.: 7752 PLACEMENT DATE: 09/29 2113 REPORT OF TESTS Started: 4:30am WEATHER CONDITIONS: Clear TIME SAMPLED: 9:30=1 BATCH TIME: 8: S 8 am TEMPERATURE (F) AIR 70 F CONCRETE: 78 F TRUCK NO: 101 TICKET NO: 520 AIR CONTENT 5.4 UNIT WEIGHT (pef): NA OVERALL PLACEMENT LOCATION: Northwest parking from northwest entrance, 210' east, 180' south and 270' west SAMPLE LOCATION: Northwest entrance, 50' south, 150' east AGE (days) 7 28 28 (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Bldg. inspections 133335 132770 Average Finished: 10:30am MAXIMUM LOAD (Ibs. force) 105520 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 Report No.: Project No.: Date of Service: Report Date: e strength samples and bring COMPRESSIVE STRENGTH (psi) 3730 195426 037333 09/29/2003 10/28/2003 K. Scott Watson, AET CMT Operations Manager FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap •III 1 f 1 A ,.1 •.I. J• lin 1, •J .1 II IP Plip PP (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DD Page 3 of 3