Loading...
Freeport NIP(7.0)-LR031024RoneEngineers Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: CYLINDER MARKED SET NO. 1 4 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi 28 Days SLUMP (in): AIR (96): 3% 6% TEST METHOD: ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 1 1 5.0 MEASURED SLUMP (inches) 1 2 5.0 1 3 5.0 Pump truck used Concrete Compressive Cylinder 6" x 12" (area 28 27 sq in DATE TESTED 10/02/2003 10/23/2003 10/23/2003 Hold PROJECT DATA REPORT OF TESTS AGE (days) 7 28 28 MAXIMUM LOAD (lbs. force) 144655 163700 164735 Average 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: Project No.: Date of Service: Report D MIX DESIGN I.D.: 7752 PLACEMENT DATE: 09/25/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 5: 1 Sarn BATCH TIME: 4:51 am TEMPERATURE (F) AIR 75 F CONCRETE: 88 F TRUCK NO: 1 TICKET NO: 454 AIR CONTENT 4.3 UNIT WEIGHT (pd): NA OVERALL PLACEMENT LOCATION: Northwest parking starting at 50' west of northwest comer of Building, west 120', south 140', northwest loading ramp sidewalk northwest corner of Ruby Road, Coppell Road, north 1300' SAMPLE LOCATION: Northwest corner of Building, 20' south, 75' west COMPRESSIVE STRENGTH (psi) 195220 037333 09/25/2003 10/24/2003 FRACTURE TYPE 5120 Unbonded Cap C 5790 Unbonded Cap 5 830 Unbonded Cap 10 LIMI l A l IONS: 1 h e test results presen[M herein were prepares bases upon m0 specurc samples provraes ror tesung. we assume nu respunewun mr vauauuu lu y uaui y (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Roue Engineers, Ltd. 01DD Page 1 of 5 RoneEngineers to Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi 28 Days SLUMP (in): AIR TEST METHOD: ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 CYLINDER MARKED SET NO. 2 1 5.5 2 2 5.5 2 3 5.5 2 4 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. MEASURED SLUMP (inches) DATE TESTED 10/02/2003 10/23/2003 10/23/2003 Hold Water added at site: 10 gallons CONCRETE COMPRESSIVE STRENGTH TEST PROJECT DATA Report No.: Project No.: Date of Service: Report Date: 3% 6% AIR CONTENT 3.8 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Northwest parking starting at 50' west of northwest comer of Building, west 120', south 140', northwest loading ramp sidewalk northwest corner of Ruby Road, Coppell Road, north 1300' REPORT OF TESTS MIX DESIGN I.D.: 7752 PLACEMENT DATE: 09/25/2003 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 6:2Oam BATCH TIME: 5:SOam TEMPERATURE (F) AIR 75 F CONCRETE: 89 F TRUCK NO: 116 TICKET NO: 463 SAMPLE LOCATION: Northwest comer of Building, 60' south, 150' west Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) AGE (days) 7 28 28 MAXIMUM LOAD Ohs. force) 120985 141815 144825 Average 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 COMPRESSIVE STRENGTH (psi) 4280 5020 5120 5070 195220 037333 09/25/2003 10/24/2003 FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap L IMIIA BUNS. The test results presented nerem were prepares oases upon me spears c sampap u rur =mug. we assume uu ,capuumultlry an vat lnaval' qua (composition, appearance, performance, etc.) or any other feature of similar subject mater provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DD Page 2 of 5 RoneEngineers Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: SPECIFICATION STRENGTH: SLUMP (in): AIR TEST METHOD: CYLINDER MARKED SET NO. 3 1 3 2 3 3 3 4 On site REQUIREMENTS 4000 psi 28 Days PROJECT DATA ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 CONCRETE COMPRESSIVE STRENGTH TEST 3% 6% AIR CONTENT 3.3 UNIT WEIGHT (pcf): NA Water added at site: 10 gallons Standby: relocate pump truck REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) MEASURED SLUMP DATE (Inches) TESTED 5.5 10/02/2003 5.5 10/23/2003 5.5 10/23/2003 Hold MIX DESIGN I.D.: 7752 PLACEMENT DATE: 09/25/2003 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 7:SOam BATCH TIME: 7:33am TEMPERATURE (F) AIR 78 F CONCRETE: 86 F TRUCK NO: 116 TICKET NO: 473 OVERALL PLACEMENT LOCATION: Northwest parking starting at 50' west of northwest corner of Building, west 120', south 140', northwest loading ramp sidewalk northwest corner of Ruby Road, Coppell Road, north 1300' SAMPLE LOCATION: Loading ramp, north corner, 40' west, 10' south AGE (days) 7 28 28 MAXIMUM LOAD (lbs. force) 123270 150550 148600 Average 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 Report No.: Project No.: Date of Service: Report Date: COMPRESSIVE STRENGTH (psi) 4360 5320 5260 5290 195220 037333 09/25/2003 10/24/2003 FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap I a� e es re su presen erem pr (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DD Page 3 of 5 RoneEngineers Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENGTH: SLUMP (in): AIR TEST METHOD: CYLINDER MARKED SET NO. 4 1 5.75 10/02/2003 4 2 5.75 10/23/2003 4 3 5.75 10/23/2003 4 4 4000 psi 28 Days 3 -6% ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 MEASURED SLUMP DATE (Inches) TESTED Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Hold Water added at site: 10 gallons CONCRETE COMPRESSIVE STRENGTH TEST PROJECT DATA REPORT OF TESTS Report No.: Project No.: Date of Service: Report Date: MIX DESIGN I.D.: 7752 PLACEMENT DATE: 09/25/2003 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 9: l5am BATCH TIME: 8:37am TEMPERATURE (F) AIR 82 F CONCRETE: 88 F TRUCK NO: 1 TICKET NO: 483 AIR CONTENT 4.4 UNIT WEIGHT (per): NA OVERALL PLACEMENT LOCATION: Northwest parking starting at 50' west of northwest corner of Building, west 120', south 140', northwest loading ramp sidewalk northwest comer of Ruby Road, Coppell Road, north 1300' SAMPLE LOCATION: Northwest corner of Buiding, 160' west, 85' south Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) AGE (days) 7 28 28 MAXIMUM LOAD (Ibs. force) 111615 131135 135640 Average 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 COMPRESSIVE STRENGTH (Psi) 3950 4640 4800 4720 195220 037333 09/25/2003 10/24/2003 FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap LIMIFAI IONS: the test results presentee nerem were preparea oasea upon me specrnc samples p ruvww huh reauag. rve amuuhe uu meyousmmhy w, .e,m�w w yucv,y (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. O1DD Page 4 of 5 RoneEngineers s Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: CONTRACTOR: CONCRETE SUPPLIER: PLANT: STRENGTH: SLUMP (in): AIR TEST METHOD: CYLINDER MARKED SET NO. 5 1 5 2 5 3 5 4 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. SPECIFICATION REQUIREMENTS Duke Realty Services, LP Potter On site 4000 psi 28 Days 3" 5" 3 -6% ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) MEASURED SLUMP DATE (inches) TESTED 5.0 10/02/2003 5.0 10/23/2003 5.0 10/23/2003 Hold AGE (days) 7 28 28 MAXIMUM LOAD (Ibs. force) 120135 139120 136945 Average Standby to finish paving on parking and to move to east side building for sidewalk pour, equipment failure on batch plant. 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: Project No.: Date of Service: Report Date: PROJECT DATA MIX DESIGN I.D.: 7752 PLACEMENT DATE: 09/25/2003 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 11:30am BATCH TIME: 1034am TEMPERATURE (F) AIR 86 F CONCRETE: 89 F TRUCK NO: 116 TICKET NO: 493 AIR CONTENT 4.1 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Northwest parking starting at 50' west of northwest comer of Building, west 120', south 140', northwest loading ramp sidewalk northwest comer of Ruby Road, Coppell Road, north 1300' SAMPLE LOCATION: Sidewalk from corner of Ruby and REPORT OF TESTS Coppell, lo' north COMPRESSIVE STRENGTH (psi) 195220 037333 09/25/2003 10/24/2003 FRACTURE TYPE 4250 Unbonded Cap 4920 Unbonded Cap 4840 Unbonded Cap 4880 1• (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DD Page 5 of 5 Technician: Shawn Deal Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Potter Concrete Started: 4:30am Finished: 12:15pm (I) Pacheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Bldg. Inspections K. Scott Watson, AET CMT Operations Manager