BETHEL SCHOOL ROAD (Denton Tap to Heartz)
ST 02-02
PRE CONSTRUCTION MEETING
OCTOBER 23, 2003
NAME COMPANY
1.
2~~~~ ~~~~\\ ~~~
~', ~ " '-, ,/ ")
J. .' ., -'" '.,. .. f'; ,-- . ~>. -- f/ ,'" -'--, , . r, .-. ,/' r-
J_.-"( )/J .. J/ (,?/,} /j,.- l' ~)I/J?"'..J..<-'t,,,.J t c:7-,//''';L_~_A/-/('
---. /
3,
Royce 4r+t.r -riSe () Pi/v;",,?
4, ])/I(//~ }) ##0 _/
7/J#c? &-t//A/&
5, I H<. (f!C i
b A I~ N Y /Y) 1i.l..U CW!'J fu /I/Vcr
6,
~)\j)a~\ l,-~i\ \. 0'[ ,
J : ." I
, i~ \t' ,
.
7.
K-e VI I \ \
\.::1 "j(.\FPIN
8. ~r.4.s. W\ ~W~ U( ~0 ~ 'fttL Co?t'cu-
9';6;t'c/(/3 J1IE/17< !#;:2/2e /-r- r/Z-z'.
10
~~~ lJV\o~e... ~1(. 'E~{.
C(~( ';10.. L Ka"e C'^''5;V\C'efS-
THE.CITY.OF
corrELL
Bethel School Road (Denton Tap to Heartz)
ST 02-02
October 23, 2003
Preconstruction Conference Agenda
1. Franchised utiliVltieos no ~.n on_'" -r,.. ~.
'~lv__'1""'l" --, w.......... ""''& ''''^'1'ir \ I.-.o~ "i' .
sj...,;" II 1~13.
2. City of Coppell Guidelines
a) Working hours 9-5 ""- f Ef.trlj hours
pCl.a- o~~'\.-.L 4-01 h~
b) Noiseordinancev..)~ --..ro,........e "'" c-...piJ,;^+ bva);.,
c) Changes to plans or specifications M~b 1,'1- ~ e~ tv" c.-... t-~.../-.'" ~ ~ I .:c ~~""
d) Sanitary facilities ~ h-......, ... . ....;u.JL
e) All water must be metered
f) Operation of water valves Public Services Phone No. 972-46~5150 L
c,"!;_pCo;w> G-t. k ~~ ~ ~~""y..Q "" OjloL^"''"''
g) Protect existing trees - fence them off
Lv. L..A.. at-,+ ~
'''''O~'''' .,... J;...,oJ!oi-
h) Keep set of Construction Standards on site
i) Responsible party on site at all times
j) Periodic meetings as need
3. Contract Time / Liquidated Damages" I ..... I:> "'^ V-<>
90 Calendar Days I $240.00 per day ./--. ~
4. Project Specific Items
, ,. ",,~^...,.,...;.. ~ \->.0.
')0+ \o:)..v~ "'Cf"'VA -,-
w-{. se...-+ 0-4 ~"1,0 0 ~
a) Place Message Board Early
b) Lane Closure - Bethel Road will be limited to one-way westbound (from Heartz Rd, towards
Denton Tap Rd.) during construction.
c) Traffic Control Plan - public safety will be of the utmost concern during the entire construction
process. If traffic at Vanbebber Dr. and Heartz Rd. becomes a problem, then a temporary stop
sign may be placed on Heartz Rd. during construction. Notify Police, Fire, Waste Management,
Post Office, CISD in advance.
d) Damage to Irrigation Systems & Mail Boxes
e) Maintain Uninterrupted Mail Delivery
f) Final cleanup and reestablishment of vegetation shall take place in a timely manner. Grass
replacement shall be block sodding. Change Order
g) Materials Storage IV L c ~ \^V\ IS., L 0 L -, . I j) ~ J '
~ fV"-<- ~ } "f V\.~ '^" S ' ~
6. Submittals
a) Responsible person - Name and 24 hour number
b) List of subcontractors with contact person and phone number
c) Monthly estimate form
d) Traffic Control Plan
e) Construction sequence chart
f) Materials
concrete batch design for each mix
cement treated base
Testing
\?."",.e,.
I. Concrete Paving
. check air and slump
. cast a set of cylinders per maximum 300 c.Y. or representation of concrete placed on any day
· a set shall consist of 3 cylinders JJJ'-
oJ <,-t CO G- ;-\
2. Structures ,,,It-1-
. Cast a set per each days placement
3. Cement Treated Base
. densities
Pay Items
I}
w~ {V'\.(><,,?a..jf--'oOOAQ s.v ' ,
2
SUBCONTRACTOR BASE
AMERICAN LANDSCAPE SYSTEMS
2314 GLENDA
DALLAS, TEXAS 75229
MARIO BEVILACQUA
972 484-5858 972 484-7470
ARUNGTON PAVERS INC.
P.O. BOX 171025
ARLINGTON, TEXAS 76003
RAY SMITH
817 477-4777 817 477-4778
BTA SERVICES, LTD.
P.O. BOX 850
ROCKWALL, TEXAS 75087-0850
PATRICIA POWERS
972 771-3832 972 771-6525
LARRETT, INC.
6712 FM 1836
KAUFMAN, TX. 75142
BRAD LANDS
972962-3400 972962-1441
LONE STAR BARRICADES, LLC.
P.O. BOX 118947
CARROLLTON, TEXAS 75011-8947
JAMES POWELL
972 939-1414 972939-1616
MEL'S ELECTRIC SERVICE, INC.
1810 S. AKARD STREET
DALLAS, TX 75215
TIM KEIERLEBER
214565-1074 214565-1081
STORM WATER MANAGEMENT INC.
P.O. BOX 202991
ARLINGTON, TX 76006
TODD WEBSTER
817 975-9307 817 419-9307
T&R DEMOUT/ON INC.
3529 PEORIA AVE.
DALLAS, TX 75212
ROBERT MOORE
214631-2718 214905-7565
SEE ATTACHED
SEE ATTACHED
SEE ATTACHED
THE.CiTY.OF
corrELL
+~*~.
e.t ~ ~q
1\ oS . \
Bethel School Road (Denton Tap to Heartz)
ST 02-02
October 23, 2003
Preconstruction Conference Agenda
1. Franchised Utilities
U~~ ~
2. City of Coppell Guidelines
a) Working hours :.:5' t-)
,
Extra hours 44 c) i:'
b) Noise ordinance ~'J::' "'"'':I ,'W,. ',..0
c) Changes to plans or specifications -:., ~ "\' I"~
J....... ; ,
.;,1 ;"15. J::;w'dt\"'j ,
d) Sanitary facilities - L':',.
~-'-1 ) :,,' p r,
e) All water must be metered
f) Operation of water valves
Public Services Phone No. 972-462-5150
g) Protect existing trees - fence them off
h) Keep set of Construction Standards on site
i) Responsible party on site at all times
j) Periodic meetings as need
3. Contract Time / Liquidated Damages
90 Calendar Days / $240.00 per day
,;
~-:~>' ,
r;
I
'-
'D,~
\
4. Project Specific Items
a) Place Message Board Early
'Y D~
i.
,l/ j \
._ ',1
./, ,,1 ~
-/ '.......j."'J.
\" \5
b) Lane Closure - Bethel Road will be limited to one-way westbound (from Heartz Rd. towards
Denton Tap Rd.) during construction.
~\ ~.o lI< -\~~fJ M'l(
c) Traffic Control Plan - public safety will be of the utmost concern during the entire construction
process. If traffic at Vanbebber Dr. and Heartz Rd. becomes a problem, then a temporary stop
sign may be placed on Heartz Rd. during construction. Notify Police, Fire, Waste Management,
Post Office, CISD in advance.
d) Damage to Irrigation Systems & Mail Boxes
e) Maintain Uninterrupted Mail Delivery
f) Final cleanup and reestablishment of vegetation shall take place in a timely manner. Grass
replacement shall be block sodding. Change Order
g) Materials Storage
6. Submittals
a) Responsible person - Name and 24 hour number
b) List of subcontractors with contact person and phone number
c) Monthly estimate form
d) Traffic Control Plan
e) Construction sequence chart
f) Materials
concrete batch design for each mix
cement treated base
Testing
1. Concrete Paving
. check air and slump
. cast a set of cylinders per maximum 300 c.Y. or representation of concrete placed on any day
. a set shall consist of 3 cylinders
2. Structures
. Cast a set per each days placement
3. Cement Treated Base
. densities
Pay Items
2