Loading...
ST9902-CS030910 09/16/2063 13:15 9722514348 9722514348 TEAGUE NAL.L & PERK I N ?T 9"iO'2...PAGE 01/01 Jr!! r~~~su.~U!:!"O~!-. ~O'!s~T!:!RKINS September 10. 2003 Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 VIA FACSIMILE 972-304-3679 -. RE: West Sandy lake Road Dear Ken: As currently proposed. approximately 350 linear feet of Coppell Road North will be reconstructed with the above referenced project. Because the proposed roadway will be reconstructed in roughly the same location as the existing pavement surface, it will be difficult and more costly for the contractor to maintain access to the roadway while construction of this segment occurs. For this reason, it is worth considering completely closing the roadway during construction. We estimate that the time the roadway will be closed would be between 25 and 30 days. including seven days for curing, assuming we use high early strength concrete. This tirne does not include delays due to inclement weather. We may want to set a maximum allowable time for this segment and impose liquidated damages if the contractor fails to re-open the roadway within the allotted time. Please advise us how you wish to proceed and we will prepare the plans and contracts accordingly. Sincerely. TEAGUE NALL AND PERKINS, INC. 'J~ /L Aay VOlk, P.E Principal 12150 !VORTH A8R.J.M5 ROAD. SUITt 508 DALLAS. H::XJlS 75243 (214) 461-9867 FAX (214) 461-9864