Loading...
ST9902-CS031024 (2) $\ qq -02.. A. TEAGUE NALL AND PERKINS ENGINEERS. SURVEYORS. CONSULTANTS 12160 North Abrams Road, Suite 508 INC. Dallas, Texas 75243 (214) 461-9867 (214) 461-9864 FAX To: From: Date: Re: MEMORANDUM Ken Griffin, P.E.-City of Coppell Jay Volk October 24, 2003 West Sandy Lake Road Project NOTE: FOLLOW-UP NOTES FROM THE MEETING ARE IN RED ITALICS, A TTENOANCE: Ken Griffen, PE, Oir, Of Engineering & Public Works - City of Coppell Suzan Taylor, C.IP. CoorrJinator- CifyofCoppel1 Mike Jones, P,E - TNP Fort Worth Office Jay Volk, P.E - TNP Dallas Office Matt Atkins, E/, T. - TNP Dallas Office I I. Introduction of Plans a, Browse plans for broad explanation of design and some assumptions made during the preliminary design phase b, Highlight areas that may differ from schematic plans or that need additional detail during final design c, Location of signal lights - Pole locations at Royal Lane and State Road shall be conducive to future extension to the north. Ensure that mast arms are adequate to provide left turn signalization. TNP to evaluate the location of the pole in the median at Coppetl Road North. d, Location of median openings in Royal Lane - Add median opening for southbound left turn into drive near Station 10+00, Relocate inlet on southbound lane to accommodate future drive to the west, I. Transitions to existing pavements a. West end-four (4) lane extension to S.H, 121 TNP to pursue the 4-lane transition to the northbound seNice road for S,H. 121 and coordinate with TxOOT b, East end-curb & gutter section No curb and gutter but divided with grass in the median. TNP to evaluate drainage options, III. Construction Sequencing Plan Need to provide pedestrian crossing from the Oakbend Addition to the north along Coppell Road North. Plans need to indicate that Coppell Road North to Page 1 of2 be closed only during summer months when school is out. City does not want a detour plan that promotes routing traffic through residential streets, TNP to re- evaluate the closure time for Coppell Road North. IV. Pavement Marking Plan Suzan to check on revised standards regarding typesllayout of buttons. Signage will be handled the same way as on East Sandy Lake Road. Speed limit will be the same as it is posted now, V. Existing Irrigation Systems This will be handled with a pay item and clearly defined with very specific details in the Specifications including noting the locations of existing irrigation systems, The area in front of the Oakbend Addition will be coordinated with the Home Owners' Association VI. Utility Coordination Date for quarterly utility coordination meeting set as: November 13, 2003 at 2:00 pm. TNP to send preliminary plans to utility companies prior to meeting, Suzan and Matt to coordinate on utility contact information. a, Send utility companies copies of preliminary plans b, Coordination meeting c, Identify all conflicts d, Establish relocation schedule VII. Right of Way TNP to prepare right of way exhibit for the parcel on the southwest comer of West Sandy Lake Road and Royal Lane. All other parcels will be prepared when City has reviewed preliminary plans, a, Confirm limits/Parcels b, Schedule VIII. Landscape Issues a, Setup meeting with Parks Department & Newman, Jackson, Bieberstein, Inc, TNP to provide dates to Suzan for coordination of meeting IX. Public meeting Public meeting will be in the Spring of 2004 after construction schedule is determined, a. Date/location b, Information/exhibits c. Format X. Other Items Next meeting date: November 25, 2003 Page 2 of2