Loading...
Coppell CC 1B1-LR010911ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company PROJECT: Koll Center -Coppell REPORT DATE: 09/1 i/01 AGGREPORT#: C01-0206-187 REPORT DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 4000 Slump (in.): 5 max Air Content (%): Concrete Temp (°F): 3.5 - 6.5 95 max Placement Date: 07/16/01 Sampled By: D, Vandergriff Weather: Sunny SupplierlMix: Potter - 7752 FIELD DATA SET #1 Ticket #: 612964 Time Batched: 7:05 a.m. Time Sampled: 7:45 a.m. Slump (in.): 5.00 Air Content: 6.2 Unit Weight (pcf): na Conc. Temp. (°F): 85 Ambient Temp. (°F): 82 Yardage (c.y.): 40 Placement Location: Paving area on south side of building #1, 50' E. & 50' S. of SE corner Remarks: FIELD DATA SET #2 Ticket #: 612973 Time Batched: 8:10 a.m. Time Sampled: 9:00 a.m. Slump (in.): 5.5" Air Content: 6.0 Unit Weight (pcf): na Conc. Temp. (°F): 90 Ambient Temp. (°F): 87 Yardage (c.y.): 130 Placement Location: Paving area 25' S. & 50' E. of SW of building #1 Remarks: *Slump exceeds s pecifications CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C37, TESTED PER ASTM C39 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 07/23/01 7 89120 28.27 3150 D 1 B 07/23/01 7 88350 28.27 3130 B C 08/13/01 28 115580 28.27 4090 C D 08/13/01 28 116480 28.27 4120 D E Discard A 07/23/01 7 79810 28.27 2820 D 2 B 07/23/01 7 79100 28.27 2800 B C 08/13/01 28 101930 28.27 3610 D D 08/13/01 28 103640 28.27 3670 C 'Does not meet specs. E 09/10/01 56 110780 28.27 3920 D (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, Ct72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without AL NCE GEOTECHNICAL GROUP the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: KoII Center -Coppell Koll Development Company -James Williams REPORT DATE: 09/11/01 Hill & Wilkerson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-187 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 4000 Placement Date: 07/16/01 Slump (in.): 5 max Sampled By: D. Vandergriff Air Content (%): 3.5 - 6.5 Weather: Sunny Concrete Temp (°F): 95 max Supplier/Mix: Potter - 7752 FIELD DATA SET #3 Ticket #: 612983 Time Batched: 9:30 a.m. Time Sampled: 10:15 a.m. Slump (in.): 5.00 Air Content: 5.7 Unit Weight (pcf): na Conc. Temp. (°F): 92 Ambient Temp. (°F): 90 Yardage (c.y.): 230 Placement Location: Paving area 65' S & 20' E. of SW of building #1 Remarks: FIELD DATA SET #4 Ticket #: 612992 Time Batched: 10:27 a.m. Time Sampled: 11:45 a.m. Slump (in.): 6.0' Air Content: 4.1 Unit Weight (pcf): na Conc. Temp. (°F): 91 Ambient Temp. (°F): 95 Yardage (c.y.): 320 Placement Location: Paving area 10' E & 35' N. of NW of building #3 Remarks: `Slump exceeds s pecifications CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C37, TESTED PER ASTM C39 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 07/23/01 7 82620 28.27 2920 D 3 B 07/23101 7 86880 28.27 3070 D C 08/13/01 28 114620 28.27 4050 C D 08/13/01 28 117090 28.27 4140 D E Discard A 07/23/01 7 85880 28.27 3040 D 4 B 07/23/01 7 83300 28.27 2950 D C 08/13/01 28 109410 28.27 3870 C D 08/13/01 28 106970 28.27 3780 D 'Does not meet specs. E 09/10/01 56 115730 28.27 4090 C (1) NORMAL CYLINDER SIZE 6" X 12", AREA 26.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C738, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. N This report may not be reproduced except in its entirety, without the written consent of AGG. Results appl only to above tests. ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center -Coppell 09/11 /01 C01-0206-187 REPORT DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): Slump (in.): 4000 5 max Air Content (%): 3.5 - 6.5 Concrete Temp (°F): 95 max Time Batched: Air Content: Ambient Temp. (°F): FIELD DATA SET #5 Ticket #: 613005 Time Batched: 1:55 p.m. Time Sampled: 2:45 p.m. Slump (in.): 4.50 Air Content: 5.1 Unit Weight (pcf): na Conc. Temp. (°F): 92 Ambient Temp. (°F): 97 Yardage (c.y.): 430 Placement Location: Approach on west side of building #3 from Freeport Parkway Remarks: FIELD DATA SET #6 Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: Placement Date: 07/16/01 Sampled By: D. Vandergriff Weather: Sunny Supplier/Mix: Potter - 7752 Time Sampled: Unit Weight (pcf): Yardage (c.y.): CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 07/23/01 7 71460 28.27 2530 D 5 B 07/23/01 7 73040 28.27 2580 D C 08/13/01 28 93770 28.27 3320 D D 08/13/01 28 94650 28.27 3350 C * Does not meet specs. E 09/10/01 56 104300 28.27 3690 D 6 (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. ~~ This report may not be reproduced except in its entirety, without 9FCCfAACE (~I~TEZ`FfAT~~~`1~- the written consent of AGG. Results apply only to above tests.