Loading...
Coppell CC 1B1-LR010821ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center -Coppell Koll Development Company -James Williams REPORT DATE: 08/21/01 Hill & Wilkerson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-227 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 4000 Placement Date: 08/10/01 Slump (in.): 5 max Sampled By: D. Vandergriff Air Content (%): 3.5 - 6.5 Weather: Sunny Concrete Temp (°F): 95 max Supplier/Mix: Hanson - 7752 FIELD DATA SET #1 Ticket #: 810597 Time Batched: 7:00 a.m. Time Sampled: 7:45 a.m. Slump (in.): 4.75 Air Content: 5.3 Unit Weight (pcf): na Conc. Temp. (°F): 93 Ambient Temp. (°F): 85 Yardage (c.y.): 10 of 30 Placement Location: South approach Remarks: FIELD DATA SET #2 Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content: Unit Weight (pcf): Conc. Temp. (°F): Ambient Temp. (°F): Yardage (c.y.): Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 08/17/01 7 104400 28.27 3690 B 1 B 08/17/01 7 102810 28.27 3640 D C 09/07/01 28 28.27 D 09/07/01 28 28.27 E Hold 2 (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C738, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. /N~ This report may not be reproduced except in its entirety, without LI CE GEOTECHNICAL GROUP the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CLIENT: PROJECT: REPORT DATE: AGG REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Koll Development Company Koll Center -Coppell 08/21 /01 C01-0206-198 REPORT DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone Citv of Coooell - Larrv Davis Strength (psi): Slump (in.): Air Content (%): Concrete Temp (°F): 4000 5 max na 95 max FIELD DATA SET #1 Ticket #: 613173 Time Batched: 8:11 a.m. Time Sampled: 9:00 a.m. Slump (in.): 4.50 Air Content: na Unit Weight (pct]: na Conc. Temp. (°F): 90 Ambient Temp. (°F): 90 Yardage (c.y.): 10 Placement Location: Screen wall panel #1 and columns off SE corner of buildin g #2 Remarks: Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: FIELD DATA SET #2 Time Batched:_ Air Content: _ Ambient Temp. (°F): PROJECT DATA Placement Date: 07/20/01 Sampled By: D. Vandergriff Weather: Sunny Supplier/Mix: Potter - 9349 Time Sampled: Unit Weight (pcf): Yardage (c.y.): CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th psi FC Notes A 07/27/01 7 105840 28.27 3740 C 1 B 07/27/01 7 103790 28.27 3670 C C 08/17/01 28 142940 28.27 5060 D D 08/17/01 28 138210 28.27 4890 C E Discard 2 (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, O=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without A E GEOTECHNICAL GROUP the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING AND ENGINEERING 10610 Newkirk, Suite #202, Dallas, Texas 75220 Phone #972-444-8889 Fax #972-444-8893 REINFORCING STEEL OBSERVATION REPORT CLIENT: Koll Development Company PROJECT: Koll Center -Coppell REPORT DATE: 08/21/01 AGGREPORT#: C01-0206-237 DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis TECHNICIAN: Duane Vandergriff WEATHER: Sunny DATE: 08/15/01 AREAS OBSERVED: 1.) Paving area on east side of building #2 from the southeast corner to the northeast corner and east 85' from the east wall. 2.) Entry area on west side of building #3: a.) Northwest entry and along the north wall. b.) 155' south of northwest corner c.) 155' north of the southwest corner d.l Southwest entry and alona the south wall. 3.) Slab leave out on building #1 from 60' west of southeast corner to the southwest corner, then north to the northwest corner and east to 60' west of the northeast corner. OBSERVATION CHECK LIST: s1zE: yes COVER: SPLICE LENGTH: yeS CLEANLINESS: yeS PROPERLY TIED: yeS CLEANLINESS OF FORM WORK: yeS PROPER SUPPORT: yeS REFERENCE DRAWING: REMARKS: No Discrepancies noted. Note: This report is for the exclusive use of the Client addressed. I-Ly '- This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP