Loading...
Coppell CC 1B1-LR010816ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center -Coppell Koll Development Company -James Williams REPORT DATE: 08/16/01 Hill & Wilkerson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-191 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 4000 Placement Date: 07/17/01 Slump (in.): 5 max Sampled By: D. Vandergriff Air Content (%): na Weather: Sunny Concrete Temp (°F): 95 max SupplierlMix: Potter - 9349 FIELD DATA SET #1 Ticket #: 613029 Time Batched: 6:30 a.m. Time Sampled: 7:45 a.m. Slump (in.): 5.00 Air Content: na Unit Weight (pcf): na Conc. Temp. (°F): 91 Ambient Temp. (°F): 87 Yardage (c.y.): 10 of 100 Placement Location: Building #3 west side 20' S. from NW corner Remarks: FIELD DATA SET #2 Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content: Unit Weight (pcf): Conc. Temp. (°F): Ambient Temp. (°F): Yardage (c.y.): Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C37, TESTED PER ASTM C39 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 07/24/01 7 97260 28.27 3440 C 1 B 07/24/01 7 94980 28.27 3360 C C 08/14/01 28 131230 28.27 4640 D D 08/14/01 28 126940 28.27 4490 D E Discard 2 (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without ~-A IANCE GEOTECHNICAL GROUP the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center -Coppell Koll Development Company -James Williams REPORT DATE: 08/16/01 Hill & Wilkerson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-221 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone City of Coppell -Larry Davis Strength (psi): Slump (in.): 4000 5 max Air Content (%): 3.5 to 6.5 Concrete Temp (°F): 95 max FIELD DATA SET #1 613678 Time Batched: 8:22 a.m. Time Sampled: 4.25 Air Content: 6.0 Unit Weight (pcf): Placement Date: Sampled By: Weather: Supplier/Mix: Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: 08/07/01 D. Vandergriff Partly Cloudy Potter- 7752 9:00 a.m. na 90 Ambient Temp. (°F): 87 Yardage (c.y.): 50 Paving area 30' E. and 20' S. of SW corner of building #2 FIELD DATA SET #2 Ticket #: 613687 Time Batched: 9:14 a.m. Time Sampled: 10:00 a.m. Slump (in.): 5.25* Air Content: 6.0 Unit Weight (pct): na Conc. Temp. (°F): 91 Ambient Temp. (°F): 88 Yardage (c.y.): 140 Placement Location: Paving area 90' W. and 30' S. of SE corner of building #2 Remarks: *Slump exceeds sp ecifications CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 08/14/01 7 118300 28.27 4180 B 1 B 08/14/01 7 107860 28.27 3820 C C 09I04I01 28 28.27 D 09/04/01 28 28.27 E Hold A 08/14/01 7 110080 28.27 3890 C 2 B 08/14/01 7 108410 28.27 3830 C C 09/04/01 28 28.27 D 09/04/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, 6=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. / ^~~ This report may not be reproduced except in its entirety, without -- 4~LI CE GEOTECHNICAL GROUP the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center -Co ppell Koll Development Company -James Williams REPORT DATE: 08/16/01 Hill & Wilkerson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-221 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 4000 Placement Date: 08/07/01 Slump (in.): 5 max Sampled By: D. Vandergriff Air Content (%): 3.5 to 6.5 Weather: Partly Cloudy Concrete Temp (°F): 95 max Supplier/Mix: Potter - 7752 FIELD DATA SET #3 Ticket #: 613698 Time Batched: 10:38 a.m. Time Sampled: 11:15 a.m. Slump (in.): 5.00 Air Content: 6.5 Unit Weight (pct: na Conc. Temp. (°F): 91 Ambient Temp. (°F): 90 Yardage (c.y.): 250 Placement Location: Paving Area 30' E, and 40' S. of SE corner of building #2 Remarks: FIELD DATA SET #4 Ticket #: 613706 Time Batched: 11:23 a.m. Time Sampled: 12:15 p.m. Slump (in.): 5.00 Air Content: 6.2 Unit Weight (pcf): na Conc. Temp. (°F): 91 Ambient Temp. (°F): 94 Yardage (c.y.): 350 Placement Location: Paving Area 75' W, and 30' S. of SW corner of building #1 Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 08/14/01 7 102690 28.27 3630 D 3 B 08/14/01 7 101410 28.27 3590 D C 09/04/01 28 28.27 D 09/04/01 28 28.27 E Hold A 08/14/01 7 103640 28.27 3670 D 4 B 08/14/01 7 102490 28.27 3630 C C 09/04/01 28 28.27 D 09/04/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. / Z~ NCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax' 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center -Coppell Koll Development Company -James Williams REPORT DATE: 8/16/01 Nill & Wilkerson, lnc. -Kirk Woltman AGG REPORT #: C01-0206-215 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone City of Coppell -Larry Davis srtco-lL:q I wlvs PROJECT DATA Strength (psi): 4000 Placement Date: 8/2/01 Slump (in.): 5 max Sampled By: D. Vandergriff Air Content (%): 3.5 to 6.5 Weather: Clear Concrete Temp (°F): 95 max SupplierlMix: Potter - 7752 FIELD DATA SET #1 Ticket #: 613498 Time Batched: 5:20 a.m. Time Sampled: 6:30 a.m. Slump (in.): 5.00 Air Content: 4.8 Unit Weight (pcf): na Conc. Temp. (°F): 90 Ambient Temp. (°F): 82 Yardage (c.y.): 50 of 600 Placement Location: Paving Area: 50' South and 10" East of the Southeast Corner of Buiidinq #3 Remarks: FIELD DATA SET #2 Ticket #: 613508 Time Batched: 6:34 a.m. Time Sampled: 7:15 a.m. Slump (in.): 4.50 Air Content: 5.1 Unit Weight (pcf): na Conc. Temp. (°F): 90 Ambient Temp. (°F): 85 Yardage (c.y.): 150 of 600 Placement location: Pavin Area: 40' South and 80' East of the Southeast Corner of Buildin #3 Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 8/9/01 7 94230 28.27 3330 D 1 B 8/9/01 7 98200 28.27 3470 D C 8130/01 28 28.27 D 8/30/01 28 28.27 E Hold A 8/9/01 7 124560 28.27 4410 C 2 B 8/9/01 7 116980 28.27 4140 D C 8/30/01 28 28.27 D 8/30/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq, in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results appl only to above tests. ALLIANCE G CHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center -Coppell Koll Development Company -James Williams REPORT DATE: 08/16/01 Hill & Wilkerson, lnc. -Kirk Woltman AGG REPORT #: C01-0206-215 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone City of Coppell -Larry Davis SPECI FICATIONS PROJECT DATA Strength (psi): 4000 Placement Date: 08/02/01 Slump (in.): 5 max Sampled By: D. Vandergriff Air Content (%): 3.5 to 6.5 Weather: Clear Concrete Temp (°F): 95 max Supplier/Mix: Potter - 7752 FIELD DATA SET #3 Ticket #: 613518 Time Batched: 7:39 a.m. Time Sampled: 8:15 a.m. Slump (in.): 5.50 Air Content: 6.3 Unit Weight (pcf): na Conc. Temp. (°F): 90 Ambient Temp. (°F): 84 Yardage (c.y.): 25 of 600 Placement Location: Paving Area: 30' North and 50' East of the Northeast Corner of Building #2 Remarks: FIELD DATA SET #4 Ticket #: 613527 Time Batched: 8:43 a.m. Time Sampled: 9:45 a.m. Slump (in.): 5.00 Air Content: 4.3 Unit Weight (pcf): na Conc. Temp. (°F): 91 Ambient Temp. (°F): 85 Yardage (c.y.): 340 of 600 Placement Location: Paving Area: 20' North and 15' East of the Northwest Corner of Building #1 Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C38 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 08/09/01 7 92930 28.27 3290 D 3 B 08/09!01 7 97950 28.27 3460 D C 08/30/01 28 28.27 D 08/30/01 28 28.27 E Hold A 08/09/01 7 98840 28.27 3500 C 4 B 08/09/01 7 99660 28.27 3530 C C 08/30/01 28 28.27 D 08/30/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq, in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE G tVtCAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center -Coppell Koll Development Company -James Williams REPORT DATE: 08/16/01 Hill & Wilkerson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-215 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 4000 Placement Date: 08/02/01 Slump (in.): 5 max Sampled By: _ D. Vandergriff Air Content (%): 3.5 to 6.5 Weather: Clear Concrete Temp (°F): 95 max Supplier/Mix: Potter - 7752 FIELD DATA SET #5 Ticket #: 613537 Time Batched: 10:26 a.m, Time Sampled: 11:00 a.m. Slump (in.): 5.5' Air Content: 6.1 Unit Weight (pcf): na Conc. Temp. (°F): 92 Ambient Temp. (°F): 92 Yardage (c.y.): 440 of 600 Placement Location: Paving Area: 80' East and 25' North of the Northwest Corner of Buildin #1 Remarks: Contractor was notified of slump exceeding specifications FIELD DATA SET # Ticket #: Time Batched: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: Air Content: Ambient Temp. (°F): CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C3'I, TESTED PER ASTM C39 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 08/09/01 7 96250 28.27 3400 D 5 B 08/09/01 7 92530 28.27 3270 D C 08/30/01 28 28.27 D 08/30/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C743, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOT HNICAL GROUP Time Sampled: Unit Weight (pcf): Yardage (c.y.): ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company PROJECT: Koll Center -Coppell REPORT DATE: 08/16/01 AGG REPORT #: C01-0206-231 DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS TEST DATA °/ Compaction: 92% 90% Date Tested: 08/13/01 Moisture: +4 +6 Technician: D. Vandergrlff MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE MAX. DRY DENSITY (pcf) 344 ASTM D 698 Dark Brown Cla 23.9 97.5 3aalaas ASTM D 698 2/3 Bark Brown Cla - 1/3 Red brown Cla e Sand 20.3 104.2 IN-PLACE TEST RESULTS TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE % MOISTURE DRY DENSITY MOISTURE DEVIATION DENSITY 1 1st Leaveout bld #1, 220' N. of SW corner aaa/asa 24.9 96.0 + 4.6 92.1 2 1st Buildin #1 ent 3' N. of NE corner 344 30.7 88.0 + 6.8 90.3 3 1st Buildin #1 ent 155' S. of NE corner 344 29.9 89.0 + 6.0 91.3 4 1st Buildin #1 ent 155' N. of SE corner 344 30.2 88.3 + 6.3 90.6 ' DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC. ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: K011 Center -Coppell Koll Development Company -James Williams REPORT DATE: 08/16/01 Hill & Wilkerson, Inc, -Kirk Woltman AGG REPORT #: C01-0206-232 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS TEST DATA Compaction: 95 Date Tested: 08/13/01 Moisture: +1 t0 +4 Technician: D. Vandergrlff MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE MAX. DRY DENSITY (pct) 344 ASTM D 698 Dark Brown Cla 23.9 97.5 IN-PLACE TEST RESULTS TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE % MOISTURE DRY DENSITY MOISTURE DEVIATION DENSITY 1 2nd Buildin #1 ent 5' W. of NE corner 344 26.4 93.3 + 2.5 95.7 2 2nd Buildin #1 entr 155' S. of NE corner 344 26.0 93.6 + 2.1 96.0 3 2nd Buildin #1 ent 15' E. of SE corner 344 27.0 92.9 + 3.1 95.3 • DOES NOT COMPLY WITR PROJECT SPECIFICATIONS Notes: Last 8" lift before select fill placement ALLIANCE GEOTECHNICAL GROUP, INC. _~",v ~~- ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company PROJECT: Koll Center -Coppell REPORT DATE: 08/16/01 AGG REPORT #: C01-0206-233 DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS TEST DATA Compaction: 97 Date Tested: 08/14/01 °/ Moisture: -2 to +3 Technician: D. Vandergrlff MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE MAX. DRY DENSITY (pcF) 344 ASTM D 698 Dark Brown Cla 23.9 97.5 IN-PLACE TEST RESULTS TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE % MOISTURE DRY DENSITY MOISTURE DEVIATION DENSITY 1 Final Paving between bldg #1 & #2, 40' E. x 75' N. of SE corner of bld 2 344 23.1 97.0 -0.8 99.5 2 Final Paving between bldg #1 & #2, 30' E. x 220' N. of SE corner of bld 2 344 26.2 94.7 + 2.3 97.1 3 Final Paving between bldg #1 & #2, 40' E. x 75' S. of NE corner of bld 2 344 24.9 96.2 + 1.0 98.7 'DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC.