Loading...
Coppell CC 1B1-LR010809ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Sheet Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 501E MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center -Coppell 8/9/01 C01-0206-213 DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS TEST DATA °k Compaction: 95 Date Tested: 8/1 /01 °/ Moisture: -1 to +4 Technician: D. Vandergrlff MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE MAX. DRY DENSITY (pci) 343 ASTM D 698 Gra ish Brown Cla 23.2 99.0 344 ASTM D 698 Dark Brown Cla 23.9 97.5 346 ASTM D 698 Gra & Yellowish Brown Cla 18.2 108.1 IN-PLACE TEST R ESULTS TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE % MOISTURE DRY DENSITY MOISTURE DEVIATION DENSITY 1 1st Fill outside buildin #3, 100' E. of NW corner 343 25.3 94,9 + 2.1 95.9 2 1st FiII outside buildin #3, 200' N. of SW corner 344 25.1 93.9 + 1.2 96.3 3 1st Fill outside buildin #3, 100' E. of SW corner 344 25.4 93.6 + 1.5 96.0 4 2nd Fill outside buildin #3, 100' E. of NE corner 343 26.0 94,4 + 2.8 95.4 5 2nd Fill outside buildin #3, 200' S. of NW corner 344 25.0 94,1 + 1.1 96.5 6 2nd Fill outside buildin #3, 100' W. of SW comer 344 25.7 93.1 + 1.8 95.5 " DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC.