Loading...
Coppell CC 1B1-LR010806ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center -Coppell Koll Development Company -James Williams REPORT DATE: 8/6/01 Hill & Wilkerson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-199 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS TEST DATA °/ Compaction: 97% Date Tested: 7124/01 °, Moisture: -2 to +3 Technician: D. Vandergriff MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE MAX. DRY DENSITY (pcf) 343 ASTM D 698 Gra ish Brown Cla 23.2 99.0 344 ASTM D 698 Dark Brown Cla 23.9 97.5 346 ASTM D 698 Gra & Yellowish Brown Cla 18.2 108.1 IN-PLACE TEST R ESULTS TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE % MOISTURE DRY DENSITY MOISTURE DEVIATION DENSITY 1 final Paving Area E of Building #3 50' E & 30' S of NE Corner of Buildin #3 344 22.1 97.0 -1.8 99.5 2 final Paving Area E of Building #3 40' E & 150' S of NE Corner of Buildin #3 343 21.4 98.1 -1.8 99.1 3 final Paving Area E of Building #3 85' E & 155' S of NE Corner of Buildin #3 346 17.9 106.1 -0.3 98.1 4 final Paving Area E of Building #3 60' E & 210' S of NE Corner of Buildin #3 346 16.7 107.6 -1.5 99.5 • DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC. ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center -Coppell Koll Development Company -James Williams REPORT DATE: 08/06/01 Hill & Wilkerson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-203 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige BDD, Inc. -Russell Williams City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 4000 Placement Date: 07/26/01 Slump (in.): 5 max Sampled By: D. Vandergriff Air Ccntent (%): na NJeather: Sunny Concrete Temp (°F): 95 max Supplier/Mix: Potter - 9349 FIELD DATA SET #1 Ticket #: 613366 Time Batched: 7:46 a.m. Time Sampled: 8:30 a.m. Slump (in.): 5.00 Air Content: na Unit Weight (pcf): na Conc. Temp. (°F): 94 Ambient Temp. (°F): 91 Yardage (c.y.): 10 Placement Location: Building #2 leaveout 10' W. of NE corner Remarks: FIELD DATA SET #2 Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: Time Batched: Air Content: Ambient Temp. (°F): Time Sampled: Unit Weight (pcf): Yardage (c.y.): CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 08/02/01 7 111840 28.27 3960 D 1 B 08/02/01 7 106870 28.27 3780 D C 08/23/01 28 28.27 D 08/23/01 28 28.27 E Hold 2 (1) NORMAL CYLINDER SIZE 6" X 12", ARFA 28.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, 6=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without LLI NCE GEOTECHNICAL GROUP the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center -Coppell 08/06/01 C01-0206-198A DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS TEST DATA Compaction: 90% Moisture: +4 abOVe apt RE Date Tested: 07/23/01 Technician: D. Vande CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE MAX. DRY DENSITY (pcf) 949 ASTM D 698 Yellowish Brown Sand Cla 12.5 114.2 IN-PLACE TEST R ESULTS TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE % MOISTURE DRY DENSITY MOISTURE DEVIATION DENSITY 1 1st Lift Building #2 Leave Out 30' E of NW Corner 949 18.9 103.1 + 6.4 90.3 2* 1st Lift Bull Ing 2 Leave ut 50 o N Corner 949 15.5 100.5 + 3.0 88.0 3* 1st Lift ul ding 2 Leave ut 140' o N Corner 949 16.0 102.1 + 3.5 89.4 4* 1st Lift Bul Ing Leave Out 2 0 N o Corner 949 15.7 101.4 + 3.2 88.8 5 1st Lift Re-Test of #2 from this date 949 18.5 102.8 + 6.0 90.0 6 1st Lift Re-Test of #3 from this date 949 16.7 105.1 + 4.2 92.0 7 1st Lift Re-Test of #4 from this date 949 17.5 103.9 + 5.0 91.0 8* 1st Lift ullding 2 eave ut 125 0 Corner 949 18.7 101.0 + 6.2 88.4 9 1st Lift Re-Test of #8 from this date 949 18.0 103.6 + 5.5 90.7 'DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: `Tests did not comply. Re-tests were take ALLIANCE GEOTECHNICAL GROUP, INC.