ST9401-CS 960812August 12, 1996
City of Coppell
255 Parkway Blvd.
Coppell, Texas 75019
Attn: Mr. Mike Martin
Re;
Bridge over Denton Creek
Denton Tap Road
GTE Telephone Operations
Central Area
Dear Mr. Martin:
GTE is in the process of reattaching two of its ducts onto the
bridge mentioned above, since the water line is in place.
Since we have several more feet exposed than we did before, we
are proposing the following:
1. To replace the transition ends of the existing PVC with split
steel duct. Specifications on this duct are following. For each
of the two ducts, it will take two 45 degree bends to transition
horizontally, a length of straight steel duct, and two more 45
degree bends to transition vertically.
2. To support the pipe with a mechanical clamp supported from
the water line's I-beam, using either a side clamp or one which
would go underneath the I-beam, as shown on the following.
Either clamp would attach to the I-beam without any holes being
drilled in the beam.
3. To transition around the abutment extension to a point where
we can tie back onto the existing PVCs, rather than dig
underneath the abutment extention.
If this meets with your approval, please let me know. If I can
provide any additional information, please contact me at (214)
318-3832.
Sincerely,
Mae Beth Whaley 7
Engineer, 0. S. P.
cc: Mr. Ulys Lane - Wier & Associates
GTE Service Corporation/A part of GTE Corporation
8_:/8~/!~BS 88:~8 121~21~3 E~GLE UTILITI~ INO PAGE
ikii, atic
Sales, inc.
82
Rb~-r .'~ute .~rp~,r,41 other
Easily ~l~.iimb!~ ~ in~l! l~dltlone~
Eliminated ¢~le pCmg problem
Break-off b~ ~n be u~o~ for securl~
Ex~nelom ~ons to meresee cepscl~
FI~g~ ~Hons ~,rov!~ own hange~
Can be u~Fif~;~¢ for O~i~
SPLIT STEEL DUCT
Size c~s~rt~n.._.~ .Order_ NO.. _..
2~" GaN St~a] e DIIHD 10'
4" GaN Steel F D4OHD lD'
..... T""Wt Lbf,,
{3,R,~ ] .='wr r; Ft.
-- I)t, JC,"i'
/" ""'~ Split Steel Duct Is available in
/ """~-- 14 gauge Steel, c~r 8~h 40 erect two
/ piece duet. A two ;lace fieneed
trough bailed du{~t Is evaNsbit In
~ the 14 gauge steel, The 8oh 40
,, f t and 14 gauge steel wltho~it t belle~
~ ; end Is available In 10 ft, sections
~ which would be etlsggeret a~d then
~ -~ ~ t' boiled ~gelhet to make connections,
~ ~ on ~ge Cro~ng
08-09-96 02:47 FM FROM OPCEN
EAGLE UTIL~TI~, 1NC
tO3
ErEEVE COUPLING
Size Deoorlpllorl r o,
4" .0/'S G~lv, Sleet C4N,ID
J Wt, Lb,
t. 1,37
ELBOW
... ,".,,... .. ...........,.f
,075 140HD ,
Wdt
e.,
iTRAIGHT' TWI~T OFFSET
BRIDGE HANGER TABS.
ITRAI(IHT, 'T'N~gT
~rg~er NO, '
"'rlN1HO .... ,1:9
The primary i;ane6ts of Split itsel Duol Is the time ancd Ji~v,N:~f savings It offers ancl the exceltent mechanical
protenon it offers tot r,a~ eapectidly M~er~ptJc Cable over convention d~ systems,
T
T'tffie and LaI~r savings can be realized when cable Is crireot plowed, When plowing ;able, normally the ladle
must be removed from the cable reel and figure eignted. before crossiS a OrlOge. Then the end of tr~e cable is
pulled thro ugh a Solid du,;i and the cable is put back o mo tile reef at the Other aide of e bridge. This t~me conSuming
F,fo(;ess can take up to as much as 8 hours with today's Jong fiber.optic cable reels, With Split Steet Duct the duct
could be prehUng on the I;riclge then opened up ~ cable i~aced tn tN $pJtt Steel Duct etrm insring the need for
figure eightlng bhe oaDle. The cable could also be placed on the bridge temporarily and then the Split Steel Duct
;,leeeel around the cable,
Split Steel Duct Is tiesigned I~ lake full adv*antsge of the ~wo place seerloner concept whf~ ~enniiS lhe JayIn; in
of cal~tes as Oescfibed above. More Installation versa~ilit,/Is accomplished In the field Dy using Split Steel Ducl
flanges for hangar9 and mounting al c~nvenlent points. The thingee adapt tO assam DIe tt~ngs and hardware to
save Important Labor Tlme, which also reduces the costs over conventional pipe Iqanger systems./n addison the
fiitr;ee can be used to support additional duct runs, when required,
5.plat Steel Du~ pefmla the expan~on of the duct to greziter MpaGithes by utili~ng tile extra de~h feature. For
Installations requiring seNration of Hrvices, fiat eividers may be Used with spacer expansions to provide internal
;artitioning.
FROM OPC. EN
HANGER JPPQRT (;LAMPS h "'
Heavy' duty euFpert ;limps for eftmob ng i:ludr support angers to ' ~____~X~-
I-Beams. 'telte qrouncl the I-Beam encl fester, a; securely by tightening the
heR,. E,mtnetel Say welding or drilling Into the bridge ltruoture Itself,
Hot dip galvsr~ligect etael Order lye Nut separately barow ~ ·
o AOJUtTAEI4i CLAM: KIT8 . ' iC} 0
Attaches hangqr to I-Beam. .- ' '
Pert Number DeecMptlon
UB 060 04 Cllmp for I-Bass wi~ffi 4"
UB 050 08 Clamp f~r i-Beam width 5"
UB 0i0 06 Clamp for I-Beam width 8"
UB 080 07 Cilmp for I.Be~am width 7"
UB C~0 08 clamp for t~Beam wlUth
US 0e0 0e Clamp for F-Beam w~h
UI 080 t0 Cfemp far I-la~rn wllth '10" .
UI 050 12 Clamp f~t i-Beam wklm 1~" '
· CLAMP8
Atte0J'lel hang,e! to l-Beam. -'.. :_:
Parr. Number Delerlptien
UB 0S'l 04 Clamp hr l-Beam width 4"
UB 051 05 (;lamp ~r i-seem w~dth 5"
UB 061 06 Clamp for I.Beam with e"
LIB 081 07 Clamp for FBeam wlclth 1" "'
UB 0/1 08 Cltgmp for I-Beam wi~lth 6"
UB 0/}1 09 Clamp for I.Beam width
UB 081 10 Clamp for I-Beam width 10"
UB 061 12 Chimp for I-Beam Wkflh
. EYB NUT FOR~HANI3ER SlIPPORT CLAMPel '
HOt dip geivanlyqd for use wltl~ I-Beam Clamps aiDeve.
part Number Oem=rlotlo|q Load LImit (Iba,)
UB 5616 1/4" Tapping Size 230
U8 5818 1~" Tapping 8i~e 1130
UB 581i ~" Tapping ~l~e 1400
UB 80~1 7t" Tappin9 $.~ 2200
· EYE NUT EX'rlSlNSlON PIECE
Hot dip galvanizeHi for use with Eye Nutm
Pert Numl~r ~Oe$crlptlon Lold Limit (Iba,)
UB 8101 31r' Tspplng $tze 610
US 15?0e. tt2-" Tapping i 1130
UB e7g9 INi" Tepptng Size t860
UB8/10 ~14"Tappl~ ,Sfle 2t00
UB 511 ~ riB- Tapping 8In 23(~0
· SIDE or TOP BIJAM CLAMP8
Attaches hangar tp I-Bees, When ordering specify I.Beam wiCtth.
Pert Number pee~fiptlon Lead Llml{
UB 6101 ;lamp for 3/4"., 2" Pipe ~00
UB 8702 ~tamp for 2-I12'' - 3-1/1" PIpe 500
UB l?0~ elllap for 4". e," Pipe 700
UB 8104 ~l~mp for 8" Pll)e 1000
Ut iT05 ¢iamp for 8"- 12" Pipe 2000