ST9401-CS 960812August 12, 1996 City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 Attn: Mr. Mike Martin Re; Bridge over Denton Creek Denton Tap Road GTE Telephone Operations Central Area Dear Mr. Martin: GTE is in the process of reattaching two of its ducts onto the bridge mentioned above, since the water line is in place. Since we have several more feet exposed than we did before, we are proposing the following: 1. To replace the transition ends of the existing PVC with split steel duct. Specifications on this duct are following. For each of the two ducts, it will take two 45 degree bends to transition horizontally, a length of straight steel duct, and two more 45 degree bends to transition vertically. 2. To support the pipe with a mechanical clamp supported from the water line's I-beam, using either a side clamp or one which would go underneath the I-beam, as shown on the following. Either clamp would attach to the I-beam without any holes being drilled in the beam. 3. To transition around the abutment extension to a point where we can tie back onto the existing PVCs, rather than dig underneath the abutment extention. If this meets with your approval, please let me know. If I can provide any additional information, please contact me at (214) 318-3832. Sincerely, Mae Beth Whaley 7 Engineer, 0. S. P. cc: Mr. Ulys Lane - Wier & Associates GTE Service Corporation/A part of GTE Corporation 8_:/8~/!~BS 88:~8 121~21~3 E~GLE UTILITI~ INO PAGE ikii, atic Sales, inc. 82 Rb~-r .'~ute .~rp~,r,41 other Easily ~l~.iimb!~ ~ in~l! l~dltlone~ Eliminated ¢~le pCmg problem Break-off b~ ~n be u~o~ for securl~ Ex~nelom ~ons to meresee cepscl~ FI~g~ ~Hons ~,rov!~ own hange~ Can be u~Fif~;~¢ for O~i~ SPLIT STEEL DUCT Size c~s~rt~n.._.~ .Order_ NO.. _.. 2~" GaN St~a] e DIIHD 10' 4" GaN Steel F D4OHD lD' ..... T""Wt Lbf,, {3,R,~ ] .='wr r; Ft. -- I)t, JC,"i' /" ""'~ Split Steel Duct Is available in / """~-- 14 gauge Steel, c~r 8~h 40 erect two / piece duet. A two ;lace fieneed trough bailed du{~t Is evaNsbit In ~ the 14 gauge steel, The 8oh 40 ,, f t and 14 gauge steel wltho~it t belle~ ~ ; end Is available In 10 ft, sections ~ which would be etlsggeret a~d then ~ -~ ~ t' boiled ~gelhet to make connections, ~ ~ on ~ge Cro~ng 08-09-96 02:47 FM FROM OPCEN EAGLE UTIL~TI~, 1NC tO3 ErEEVE COUPLING Size Deoorlpllorl r o, 4" .0/'S G~lv, Sleet C4N,ID J Wt, Lb, t. 1,37 ELBOW ... ,".,,... .. ...........,.f ,075 140HD , Wdt e., iTRAIGHT' TWI~T OFFSET BRIDGE HANGER TABS. ITRAI(IHT, 'T'N~gT ~rg~er NO, ' "'rlN1HO .... ,1:9 The primary i;ane6ts of Split itsel Duol Is the time ancd Ji~v,N:~f savings It offers ancl the exceltent mechanical protenon it offers tot r,a~ eapectidly M~er~ptJc Cable over convention d~ systems, T T'tffie and LaI~r savings can be realized when cable Is crireot plowed, When plowing ;able, normally the ladle must be removed from the cable reel and figure eignted. before crossiS a OrlOge. Then the end of tr~e cable is pulled thro ugh a Solid du,;i and the cable is put back o mo tile reef at the Other aide of e bridge. This t~me conSuming F,fo(;ess can take up to as much as 8 hours with today's Jong fiber.optic cable reels, With Split Steet Duct the duct could be prehUng on the I;riclge then opened up ~ cable i~aced tn tN $pJtt Steel Duct etrm insring the need for figure eightlng bhe oaDle. The cable could also be placed on the bridge temporarily and then the Split Steel Duct ;,leeeel around the cable, Split Steel Duct Is tiesigned I~ lake full adv*antsge of the ~wo place seerloner concept whf~ ~enniiS lhe JayIn; in of cal~tes as Oescfibed above. More Installation versa~ilit,/Is accomplished In the field Dy using Split Steel Ducl flanges for hangar9 and mounting al c~nvenlent points. The thingee adapt tO assam DIe tt~ngs and hardware to save Important Labor Tlme, which also reduces the costs over conventional pipe Iqanger systems./n addison the fiitr;ee can be used to support additional duct runs, when required, 5.plat Steel Du~ pefmla the expan~on of the duct to greziter MpaGithes by utili~ng tile extra de~h feature. For Installations requiring seNration of Hrvices, fiat eividers may be Used with spacer expansions to provide internal ;artitioning. FROM OPC. EN HANGER JPPQRT (;LAMPS h "' Heavy' duty euFpert ;limps for eftmob ng i:ludr support angers to ' ~____~X~- I-Beams. 'telte qrouncl the I-Beam encl fester, a; securely by tightening the heR,. E,mtnetel Say welding or drilling Into the bridge ltruoture Itself, Hot dip galvsr~ligect etael Order lye Nut separately barow ~ · o AOJUtTAEI4i CLAM: KIT8 . ' iC} 0 Attaches hangqr to I-Beam. .- ' ' Pert Number DeecMptlon UB 060 04 Cllmp for I-Bass wi~ffi 4" UB 050 08 Clamp f~r i-Beam width 5" UB 0i0 06 Clamp for I-Beam width 8" UB 080 07 Cilmp for I.Be~am width 7" UB C~0 08 clamp for t~Beam wlUth US 0e0 0e Clamp for F-Beam w~h UI 080 t0 Cfemp far I-la~rn wllth '10" . UI 050 12 Clamp f~t i-Beam wklm 1~" ' · CLAMP8 Atte0J'lel hang,e! to l-Beam. -'.. :_: Parr. Number Delerlptien UB 0S'l 04 Clamp hr l-Beam width 4" UB 051 05 (;lamp ~r i-seem w~dth 5" UB 061 06 Clamp for I.Beam with e" LIB 081 07 Clamp for FBeam wlclth 1" "' UB 0/1 08 Cltgmp for I-Beam wi~lth 6" UB 0/}1 09 Clamp for I.Beam width UB 081 10 Clamp for I-Beam width 10" UB 061 12 Chimp for I-Beam Wkflh . EYB NUT FOR~HANI3ER SlIPPORT CLAMPel ' HOt dip geivanlyqd for use wltl~ I-Beam Clamps aiDeve. part Number Oem=rlotlo|q Load LImit (Iba,) UB 5616 1/4" Tapping Size 230 U8 5818 1~" Tapping 8i~e 1130 UB 581i ~" Tapping ~l~e 1400 UB 80~1 7t" Tappin9 $.~ 2200 · EYE NUT EX'rlSlNSlON PIECE Hot dip galvanizeHi for use with Eye Nutm Pert Numl~r ~Oe$crlptlon Lold Limit (Iba,) UB 8101 31r' Tspplng $tze 610 US 15?0e. tt2-" Tapping i 1130 UB e7g9 INi" Tepptng Size t860 UB8/10 ~14"Tappl~ ,Sfle 2t00 UB 511 ~ riB- Tapping 8In 23(~0 · SIDE or TOP BIJAM CLAMP8 Attaches hangar tp I-Bees, When ordering specify I.Beam wiCtth. Pert Number pee~fiptlon Lead Llml{ UB 6101 ;lamp for 3/4"., 2" Pipe ~00 UB 8702 ~tamp for 2-I12'' - 3-1/1" PIpe 500 UB l?0~ elllap for 4". e," Pipe 700 UB 8104 ~l~mp for 8" Pll)e 1000 Ut iT05 ¢iamp for 8"- 12" Pipe 2000 ir i iF