Loading...
Coppell CC 1B1-LR010613ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company PROJECT: Koll Center -Coppell REPORT DATE: 6/13/01 AGG REPORT #: C01-0206-122 DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS TEST DATA Compaction: 95 Date Tested: 6/5/01 %Moisture: -1 to+4 Technician: D. Vandergriff MATERIAL REFERENCE CURVE DATA CURVE TEST OPTIMUM MAX. DRY NO. METHOD MATERIAL DESCRIPTION MOISTURE DENSITY (pcf) 343 ASTM D 698 Gra ish Brown Cla 23.2 99.0 344 ASTM D 698 Yellowish Brown Sand w/traces of Cla balls 23.9 97.5 IN-PLACE TEST RESULTS TEST ELEVATION REF. % DRY MOISTURE NO. OR LIFT LOCATION CURVE MOISTURE DENSITY DEVIATION DENSITY Waterline 25' W and 20' S of SW 1 1st Corner of Buildin #2 344 27.5 95.4 + 3.6 97.8 Waterline 25' W and 20' S of SW 2 2nd Corner of Buildin #2 344 27.2 95,7 + 3.3 98.2 Waterline 25' W and 20' S of SW 3 3rd Corner of Buildin #2 344 26.4 96.3 + 2.5 98.8 Waterline 25' W and 20' S of SW 4 4th Corner of Buildin #2 344 26.0 96.9 + 2.1 99.4 Waterline 25' W and 180' N of SW 5 1st Corner of Buildin #2 344 27.7 95.1 + 3.8 97.5 Waterline 25' W and 180' N of SW 6 2nd Corner of Buildin #2 344 27.1 95.3 + 3.2 97.7 Waterline 25' W and 180' N of SW 7 3rd Corner of Buildin #2 344 27.1 95.3 + 3.2 97.7 Waterline 25' W and 180' N of SW 8 4th Corner of Buildin #2 344 25.0 96.4 + 1.1 98.9 Waterline 40' S and 80' E of SW Corner 9 1st of Buildin #2 344 27.5 95.4 + 3.6 97.8 Waterline 40' S and 80' E of SW Corner 10 2nd of Buildin #2 344 27.4 95.4 + 3.5 97.8 Waterline 40' S and 80' E of SW Corner 11 3rd of Buildin #2 344 26.1 96.1 + 2.2 98.6 Waterline 40' S and 80' E of SW Corner 12 4th of Buildin #2 344 26.0 95.5 + 2.1 97.9 • DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC. R9 ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company PROJECT: Koll Center -Coppell REPORT DATE: 6/13/01 AGG REPORT #: C01-0206-122 DISTRIBUTION; Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS TEST DATA Compaction: 95 Date Tested: 6/5/01 %Moisture: -1 to+4 Technician: D. Vanderriff CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE MAX. DRY DENSITY (pcf) 343 ASTM D 698 Gra ish Brown Cla 23.2 99.0 344 ASTM D s98 Yellowish Brown Sand w/traces of Cla balls 23.9 97.5 Notes: ALLIANCE GEOTECHNICAL GROUP, INC. 'DOES NOT COMPLY WITH PROJECT SPECIFICATIONS ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center -Coppell Koll Development Company -James Williams REPORT DATE: 06/13/01 Hill & Wilkerson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-081 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 05/15/01 Slump (in.j: 4 - 6 Sampled By: D. Vandergriff Air Content (%): na Weather: Sunny Concrete Temp (°F); 55 - 90 Supplier/Mix: Pioneer #9337 FIELD DATA SET #1 Ticket #: 683952 Time Batched: 11:45 a.m. Time Sampled: 12:30 p.m. Slump (in.): 6.00 Air Content: na Unit Weight (pcf): na Conc. Temp. (°F): 81 Ambient Temp. (°F): 85 Yardage (c.y.}: 10 Placement Location: Piers at D.7-11.9, D.9-11.3, D.9-11.9, D.9-8.5 and D.9-8.1 Remarks: Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: FIELD DATA SET #2 Time Batched: _ Air Content: _ Ambient Temp. (°F): CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM Cat, TESTED PER ASTM C39, CAPPED PER ASTM C677 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes 1 A 05/22/01 7 91640 28.27 3240 B 05/22/01 7 94430 28.27 3340 C 06/12/01 28 115820 28.27 4100 D 06!12/01 28 114170 28.27 4040 E Discard 2 (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq, in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C738, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results app! only to above tests. ALLIANCE GEOTECHNICAL GROUP Time Sampled: Unit Weight (pcf): Yardage (c.y.): ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 GONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center -Coppell 06!13/01 C01-0206-120 REPORT DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 06/04/01 Slump (in.): 5 max Sampled By: Duane Vandergriff Air Content (%): n/a Weather: Sunny Concrete Temp (°F): 90 Supplier/Mix: Hanson - 9337 FIELD DATA SET #1 Ticket #: 848492 Time Batched: 3:45 p.m. Time Sampled: 5:00 p.m. Slump (in.): 4.00 Air Content: n/a Unit Weight {pct]: n/a Conc. Temp. (°F): 89 Ambient Temp. (°F): Yardage (c.y.): Placement Location: Piers building #1: A-8.2, A-8.5 and A-4.9 Remarks: FIELD DATA SET #2 Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content: Unit Weight (pct7: Conc. Temp. (°Fj: Ambient Temp. (°F): Yardage (c.y.): Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C677 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes 1 A 06/11/01 7 77120 28.27 2730 B 06/11/01 7 76740 28.27 2710 C 07/02/01 28 28.27 D 07/02/01 28 E Hold 2 (1 j NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center -Coppell 06/13/01 C01-0206-118 REPORT DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Slump (in.): 3 - 5 Air Content (%): 4 - 6 Concrete Temp (°F): 55 - 95 Placement Date: 06/04/01 Sampled By: Mike Chism Weather: Cloudy Supplier/Mix: Pioneer - 9337 FIELD DATA SET #1 Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: 810248 Time Batched: 7:10 a.m. Time Sampled: 6.0* Air Content: 2.2 Unit Weight (pct]: 84 Ambient Temp, (°F): 76 Yardage (c.y.): 7:30 a.m. 10 *Slump exceeds specifications Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: FIELD DATA SET # Time Batched: Time Sampled: Air Content: Unit Weight (pcf): Ambient Temp. (°F): Yardage (c.y.): CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 06/07/01 3 74590 28.27 2640 B 06/07/01 3 76840 28.27 2720 1 C 06/11/01 7 94250 28.27 3330 D 06/11!01 7 93250 28.27 3300 E 07/02/01 28 28.27 F 07/02/01 28 28.27 G Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq, in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, Ci72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone; 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center -Coppell 06/13/01 C01-0206-118 REPORT DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): Slump (in.): 3000 Air Content (%): 4 - 6 Concrete Temp (°F): 55 - 95 Time Batched: Air Content: Ambient Temp. (°F): FIELD DATA SET #2 Ticket #: 848451 Time Batched: Time Sampled: 8:30 a.m. Slump (in.): 5.5' Air Content: 2.0 Unit Weight (pcf): n/a Conc. Temp. (°F): 83 Ambient Temp. (°F): 78 Yardage (c.y.): 10 Placement Location: Panel #3 Remarks: "Slump exceeds sp ecifications FIELD DATA SET # Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: Placement Date: 06/04/01 Sampled By; Mike Chism Weather: Cloudy Supplier/Mix: Pioneer - 9337 Time Sampled: Unit Weight (pcf): Yardage (c.y.): CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 06/07/01 3 87280 28.27 3090 B 06/07/01 3 80990 28.27 2860 2 C 06/11/01 7 96010 28.27 3400 D 06/11/01 7 96640 28.27 3420 E 07/02/01 28 28.27 F 07/02/01 28 28.27 G Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C738, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. ~/' This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center -Coppell 06/13/01 C01-0206-118 REPORT DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): Slump (in.): Air Content (%): Concrete Temp (°F): 3000 Placement Date: 3 - 5 Sampled By: 4 - 6 Weather: 55 - 95 Supplier/Mix: Ticket #: 848461 Slump (in.): 6.0' Conc. Temp. (°F): 84 FIELD DATA SET #3 Time Batched: Air Content: 1.8 Ambient Temp. (°F): 80 Placement Location: Panel #15 Remarks: 'Slump exceeds specifications Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: FIELD DATA SET # Time Batched: _ Air Content: _ Ambient Temp. (°F): _ Time Sampled: 10:15 a.m. Unit Weight (pcf): n/a Yardage (c.y.): 10 Time Sampled: Unit Weight (pcf): Yardage (c.y.): 06/04/01 Mike Chism Cloudy Pioneer - 9337 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 06/07/01 3 67850 28.27 2400 B 06/07/01 3 73480 28.27 2600 3 C 06/11/01 7 83840 28.27 2970 D 06/11/01 7 84100 28.27 2970 E 07/02/01 28 28.27 F 07/02/01 28 28.27 G Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company PROJECT: Koll Center -Coppell REPORT DATE: 06/13/01 AGGREPORT#: C01-0206-118 REPORT DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Slump (in.): 3 - 5 Air Content (%): 4 - 6 Concrete Temp (°F): 55 - 95 Placement Date: 06/04/01 Sampled By: Mike Chism Weather: Cloudy Supplier/Mix: Pioneer - 9337 FIELD DATA SET #4 Ticket #: 84880 Time Batched: 11:51 a.m. Time Sampled: 12:20 p.m. Slump (in.): 6.0* Air Content: 1.6 Unit Weight (pcf): n/a Conc. Temp. (°F): 84 Ambient Temp. (°F): 84 Yardage (c.y.): 10 Placement Location: Panel #23 Remarks: 'Slump exceeds sp ecifications FIELD DATA SET # Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: Time Batched: Air Content: Ambient Temp. {°F): Time Sampled: Unit Weight (pcf): Yardage (c.y.): CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C677 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 06/07/01 3 79970 28.27 2830 B 06/07/01 3 76620 28.27 2710 4 C 06/11/01 7 89650 28.27 3170 D 06/11/01 7 91870 28.27 3250 E 07/02/01 28 28.27 F 07/02/01 28 28.27 G Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq, in., UNLESS NOTED ABOVE. {2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE AS7M STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center -Coppell 06/13/01 C01-0206-076 REPORT DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 4000 Placement Date: 05/14/01 Slump (in.): 4 - 6 Sampled By: D. Vandergriff Air Content (%): na Weather: Partly Cloudy Concrete Temp (°F): 55 - 90 Supplier/Mix: Pioneer #7752 FIELD DATA SET #1 Ticket #: 698897 Time Batched: 1:55 p.m. Time Sampled: 2:45 p.m. Slump (in.): 5.00 Air Content: n/a Unit Weight (pcf): n/a (°F): Temp Conc 85 Ambient Temp. (°F): 90 Yardage (c.y.): 5 of 5 . . Placement Location: SS #3 Inlet Remarks: FIELD DATA SET #2 Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content: Unit Weight (pcf): (°F): Temp Conc Ambient Temp. (°F): Yardage (c.y.): . . Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C37, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes 1 A 05/21/01 7 110390 28.27 3900 B 06111 /01 28 134160 28.27 4750 C 06/11/01 28 138520 28.27 4900 D Discard 2 (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, Ci72, C237 Note: This report is for the exclusive use of the Client addressed. 1Cfl~~ -~.~ This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: Koll Development Company Koll Center -Coppell 06/13/01 C01-0206-123 REPORT DISTRIBUTION: REPORT DATE: AGG REPORT #: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): Slump (in.): 3000 5 max Air Content (%): n/a Concrete Temp (°F): 50 - 90 FIELD DATA SET #2 Time Batched: _ Air Content: _ Ambient Temp. (°F): Placement Date: Sampled By: Weather: Supplier/Mix: FIELD DATA SET #1 Ticket #: 640199 Time Batched: 1:33 p.m. Time Sampled: 2:45 p.m. Slump (in.): 5.00 Air Content: n/a Unit Weight (pcf): n/a Conc. Temp. (°F): 88 Ambient Temp. (°F): 84 Yardage (c.y.): 10 Placement Location: Building #3 panel P-47 Remarks: Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: Time Sampled: Unit Weight (pcf): Yardage (c.y.): 06/05/01 Duane Vandergriff Sunny Pioneer- 9337 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes A 06/08/01 3 70310 28.27 2490 1 B 06/08/01 3 73030 28.27 2580 C 06/12/01 7 88780 28.27 3140 D 06/12/01 7 84420 28.27 2990 E 07/03/01 28 28.27 F 07/03/01 28 28.27 G Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ~L G •~ ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center -Coppell KoII Development Company -James Williams REPORT DATE: 6/13/01 Hill & Wilkerson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-121 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS TEST DATA Compaction: 95 %Molsture: -1 to+4 Date Tested: Techn(clan: CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE MAX. DRY DENSITY (pcf) 344 ASTM D 698 Yellowish Brown Sand wltraces of Cla balls 23.9 97.5 IN-PLACE TEST RESULTS TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE °/a MOISTURE DRY DENSITY MOISTURE DEVIATION DENSITY 1 1st Electrical Trench 50' W and 255' S of the NW Corner of Buildin #2 344 27.6 92.9 + 3.7 95.3 2 2nd Electrical Trench 30' W and 255' S of the NW Corner of Buildin #2 344 26.1 93.3 + 2.2 95.7 • DOES NOT COMPLY WITH PROJECT Notes: ALLIANCE GEOTECHNICAL GROUP, INC. j ~-