Loading...
Coppell CC 1B1-LR010601ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center -Coppell 6/1/01 C01-0206-093 REPORT DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): Slump (in.): Air Content (%): Concrete Temp (°F): 4000 3-5 na 55 - 90 Placement Date: 5/22/01 Sampled By: J. Espinoza weather: Clear Supplier/Mix: Hanson - 9349 FIELD DATA SET #1 Ticket #: 809999 Slump (in.): 4.00 Conc. Temp. (°F): 71 Time Batched: 6:41 a.m. Air Content: na Ambient Temp. (°F): 73 Placement Location: N.W. corner of Building #2 Time Sampled: Unit Weight (pcf): Yardage (c.y.): 7:45 a.m. na 100 Remarks: 10 gallons of water added per pump FIELD DATA SET #2 Ticket #: 684224 Time Batched: 8:20 a.m. Time Sampled: 9:00 a.m. Slump (in.): 4.50 Air Content: na Unit Weight (pcf): na Canc. Temp. (°F): 71 Ambient Temp. (°F): 76 Yardage (c.y.): 200 Placement Location: 80' S of N.W. Corner of Building #2 Remarks: 10 gallons of water added per pump CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes 1 A 5/29/01 7 96910 28.27 3430 B 5/29/01 7 101560 28.27 3590 C 6/19/01 28 28.27 D 6/19/01 28 28.27 E Hold A 5/29/01 7 101030 28.27 3570 2 B 5/29/01 7 103920 28.27 3680 C 6/19/01 28 28.27 D 6/19/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. ~/ This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: AGG REPORT #: Koll Development Company Koll Center -Coppell 6/1/01 C01-0206-093 REPORT DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): Slump (in.): Air Content (%): 4000 3-5 na Concrete Temp (°F): 55 - 90 Placement Date: 5/22/01 Sampled By: J. Espinoza Weather: Clear Supplier/Mix: Hanson - 9349 FIELD DATA SET #3 Ticket #: 684230 Time Batched: 9:25 a.m. Time Sampled: 10:15 a.m. Slump (in.): 4.00 Air Content: na Unit Weight (pcf): na Conc. Temp. (°F): 73 Ambient Temp. (°F): 79 Yardage (c.y.): 300 Placement Location: 150' of S of N.W. Corner of Building #2 Remarks: 10 gallons water added per pump FIELD DATA SET #4 Ticket #: 805543 Slump (in.): 4.75 Conc. Temp. (°F): 75 Placement Location: 140' N of S.W. Remarks: 10 gallons of v Time Sampled: 12:15 p.m. Unit Weight (pcf): na Yardage (c.y.): 400 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes 3 A 5/29/01 7 90840 28.27 3210 B 5/29/01 7 94300 28.27 3340 C 6/19/01 28 28.27 D 6/19/01 28 28.27 E Hold A 5/29/01 7 120840 28.27 4270 4 B 5/29/01 7 106400 28.27 3760 C 6/19/01 28 28.27 D 6/19/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C136, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. Time Batched: 12:01 p.m. Air Content: na Ambient Temp. (°F): 79 ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone; 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center -Coppell Koll Development Company -James Williams REPORT DATE: 06/01/01 Hill & Wilkerson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-093 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): Slump (in.): Air Content (%): Concrete Temp (°F): 4000 na 55 - 90 Placement Date: Sampled By: Weather: Supplier/Mix: 05/22/01 J. Espinoza Clear Hanson - 9349 FIELD DATA SET #5 Ticket #: 684247 Time Batched: _ 12:51 p.m. Time Sampled: 1:00 p.m. Stump (in.): 5.00 Air Content: na Unit Weight (pcf): na Conc. Temp. (°F): 75 Ambient Temp. (°F): 79 Yardage (c.y.): 499 Placement Location: SW corner of building #2 Remarks: 10 gals water added per pump FIELD DATA SET #6 Ticket #: 684259 Time Batched: 1:55 p.m. Time Sampled: 2:15 p.m. Slump (in.): 5.00 Air Content: na ,Unit Weight (pcf): na Conc. Temp. (°F): 79 Ambient Temp. (°F): 79 Yardage (c.y.): 599 Placement Location: 15' NW Corner of buildin 2 Remarks: 15 gals water added Der Dumb CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th si FC Notes 5 A 05/29/01 7 99960 28.27 3540 B 05/29/01 7 108320 28.27 3830 C 06/19/01 28 28.27 D 06/19/01 28 28.27 E Hold A 05/29/01 7 94220 28.27 3330 6 B 05/29/01 7 97130 28.27 3440 C 06/19/01 28 28.27 D 06/19/01 28 28.27 E Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 26.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C136, C143, C772, C231 Note: This report is for the exclusive use of the Client addressed. ~~~ This report may not be reproduced except in its entirety, without the written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP