Loading...
Coppell CC 1B1-LR010514ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Streef Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company PROJECT: Koll Center -Coppell REPORT DATE: 05/14/01 AGG REPORT #: C01-0206-066 DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkerson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS TEST DATA °/ Compaction: 95 Date Tested: 05/09/01 Moisture: -2 to +2 Technician: Duane Vandergriff MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE MAX. DRY DENSITY (pcf) 488 ASTM D 698 Reddish Brown Cla a Sand -Select 13.0 117.6 636 ASTM D 698 Yellowish Brown Sand w/Cla alls 15.1 111.4 IN-PLACE TEST R ESULTS TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE % MOISTURE DRY DENSITY MOISTURE DEVIATION DENSITY 1 1st a er Ine In g o .Ine, from E. ed e 636 17.1 105.9 + 2.0 95.1 2 2nd a er Ine In g o .Ine, from E. ed a 636 16.4 106.4 + 1.3 95.5 3 3rd a er Ine In g o .Ine, from E. ed a 636 16.0 106.8 + 0.9 95.9 4 4th a er Ine In g o .Ine, from E. ed a 488 15.0 112.6 + 2.0 95.7 5 5th a er Ine In g o .Ine, from E. ed a 488 13.3 111.8 + 0.3 95.1 6 1st a er Ine In g o .Ine, N. of "T" 636 16.3 106.4 + 1.2 95.5 7 2nd a er Ine In g o .Ine, N. of "T" 636 15.1 107.9 + 0.0 96.9 8 3rd a er Ine In g o .Ine, N. of "T" 488 13.2 111.9 + 0.2 95.2 9 4th a er Ine In g o .Ine, N. of "T" 488 13.0 114.8 + 0.0 97.6 10 1st a er Ine In g o .Ine, S. of "T" 636 16.4 106.4 + 1.3 95.5 11 2nd a er Ine In g o .Ine, S. of "T" 488 15.0 112.6 + 2.0 95.7 12 3rd a er Ine In g o .Ine, S. of "T" 488 14.5 116.1 + 1.5 98.7 'DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC.