Loading...
Coppell CC 1B1-LR010503ALLIANCE GEOTECHNICAL GROUP GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koli Development Company REPORT DISTRIBUTION: PROJECT; Koll Center -Coppell Koll Development Company -James Williams REPORT DATE: 05/03/01 Hill & Wilkinson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-034 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis Lattimore Materials -Curtis Lee SPECIFICATIONS PROJECT DATA Strength (psi): Slump (in.): Air Content (%): Concrete Temp (°F): 4000 3-5 90 max Placement Date: 04/25/01 Sampled By: _ Duane Vandergriff Weather: Sunny Supplier/Mix: Lattimore Materials FIELD DATA SET #i Ticket #: 100285 Time Batched: 2:40 p.m. Time Sampled: 3:15 p.m. Slump (in.): 3.00 Air Content: na Unit Weight (pcf): na Conc. Temp. (°F): 74 Ambient Temp. (°F): 80 Yardage (c.y.}: 3.5 Placement Location: Sanitary sewer manhole 5 at station 2+00 Remarks: Ticket #: Slump (in.): Conc. Temp. (°F): Placement Location: Remarks: FIELD DATA SET #2 Time Batched: _ Air Content: _ Ambient Temp. (°F): Time Sampled: Unit Weight (pct): Yardage (c.y.): CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # C tinder # Test Date A e Da s Max. Load Ibs Areas . in. Stren th psi FC Notes 1 A 05/02/01 7 94450 28.27 3340 B 05/23/01 28 28.27 C 05/23/01 28 28.27 D Hold 2 (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. /~. This report may not be reproduced except in its entirety, without the Written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: KoII Center -Coppell Koll Development Company -James Williams REPORT DATE: 05/03/01 Hill & Wilkinson, Inc. -Kirk Woltman AGG REPORT #: C01-0206-042 Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIO NS TEST DATA Compaction: 95 Date Tested: 04/27/01 °/ Moisture: -1 to +4 recnnidan: Duane Vandergriff MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE MAX. DRY DENSITY (pcf) 344 ASTM D 698 Dark Brown Cla 23.9 97.5 343 ASTM D 698 Gra ish Brown Cla 23.2 99.0 342 ASTM D 698 Brown Cla 23.5 98.8 346 ASTM D 6s8 Gra & Yellow Brown Cla w/Calcareous Nodules 18.2 108.1 IN-PLACE TEST RESULTS TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE % MOISTURE DRY DENSITY MOISTURE DEVIATION DENSITY 1 1st Sanita sewer SS-5, station 1+50 344 23.2 98.2 -0.7 100.7 2 2nd Sanita sewer SS-5, station 1+50 344 23.5 99.0 -0.4 101.5 3 3rd Sanita sewer SS-5, station 1+50 343 23.2 99.0 + 0.0 100.0 4 1st Sanita sewer SS-5, station 3+00 344 23.4 96.1 -0.5 98.6 5 2nd Sanita sewer SS-5, station 3+00 344 23.5 99.0 -0.4 101.5 6 3rd Sanita sewer SS-5, station 3+00 344 23.1 99.9 -0.8 102.5 7 1st Sanita sewer SS-5, station 4+50 343 23.0 98.1 -0.2 99.1 8 2nd Sanita sewer SS-5, station 4+50 343 22.4 100.2 -0.8 101.2 9 3rd Sanita sewer SS-5, station 4+50 343 22.2 100.9 -1.0 101.9 10 1st Sanita sewer SS-5, station 6+00 343 22.9 98.7 -0.3 99.7 11 2nd Sanita sewer SS-5, station 6+00 344 23.1 99.9 -0.8 102.5 12 3rd Sanita sewer SS-5, station 6+00 344 22.9 98.7 -1.0 101.2 DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC. kYl lha---- ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk SOIL MOISTURE -DENSITY Fax 972-444-8893 IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company PROJECT: Koll Center -Coppell REPORT DATE: 05/03/01 AGG REPORT #: C01-0206-042 DISTRIBUTION: Koll Development Company -James Williams Hill & Wilkinson, Inc. -Kirk Woltman Alliance Architects -Tom Maxwell AECC, Inc. -Andy Brundige City of Coppell -Lee Stone City of Coppell -Larry Davis SPECIFICATIONS TEST DATA Compaction: 9S %Moisture: -1 t0+4 Date Tested: 04/27/01 Technician: Duane Vandergriff MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE MAX. DRY DENSITY (pcf) 341 ASTM D 698 Gra ish Brown Cla 23.2 99.0 488 ASTM D 698 Dark Brown Cla 23.9 97.5 IN-PLACE TEST RESULTS TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE °/ MOISTURE DRY DENSITY MOISTURE DEVIATION DENSITY 13 1st Sanita sewer SS-6, station 0+20 343 23.2 99.0 + 0.0 100.0 14 2nd Sanita sewer SS-6, station 0+20 343 22.9 98.7 -0.3 99.7 15 3rd Sanita sewer SS-6, station 0+20 344 23.0 98.1 -0.9 100.6 16 1st Sanita sewer SS-6, station 1+50 342 23.0 97.9 -0.5 99.1 17 2nd Sanita sewer SS-6, station 1+50 343 22.9 98.7 -0.3 99.7 18 3rd Sanita sewer SS-6, station 1+50 343 22.4 100.2 -0.8 101.2 DOES NOT COMPLY W ITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC.