ST9902-CS031031 s\ C\Q-ol A Su V\(J.A-\ L- wee.. Ill'!! r~~f!s~~u!:!~J;,t-) ~o'!s~T!:!RKINS October 31,2003 Mr. Doug Brewer Oncor 4200 N Belt Line Road Irving, Texas 75038 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr. Brewer: Teague Nail & Perkins, Inc. is currently working on the final design for the above referenced project. In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas, If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be sending you a formal invitation to the meeting, If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions, Thank you for your cooperation and assistance, Sincerely, TEAGUE NALL AND PERKINS, INC. J1r d~ Kyle Jones Cc: Ken Griffin, P,E, Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH A8RAMS ROAD. SUITE 508 DALLAS, TEXAS 75243 (214) 46/.9867 FAX (214) 461-9864 1Il~ r~~~su.~u~~o~t-. ~o'!s~Tf:!IRKINS October 31, 2003 Mr. Bryan Williams Oncor P,O, Box 970 Fort Worth, Texas 76101-0970 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr. Williams: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project. In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, wio1ether or not any of your existing utilities fall within the anticipated construction areas. If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be sending you a formal invitation to the meeting. If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions. Thank you for your cooperation and assistance, Sincerely, TEAGUE NALL AND PERKINS, INC. j{f1 J-~ Kyle Jones Cc: Ken Griffin, PE Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH A8RAMS ROAD, SUITE 508 DALLAS. TEXAS 75243 (214) 461.9867 FAX (214) 46/.9864 .!! r~~~su.~u~"o~t-. ~o'!s~Tf:!IRKINS October 31 , 2003 Mr. Bob Holland Verizon 2094 McGee Lane Lewisville, Texas 75038 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr. Holland: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas, If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be sending you a formal invitation to the meeting. If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions, Thank you for your cooperation and assistance. Sincerely, TEAGUE NALL AND PERKINS, INC. /1 tl~ Kyle Jones Cc: Ken Griffin, P.E. Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH ABRAMS ROAD. SUITE S08 DALLAS. rEXAS T5243 (214) 461-9867 FAX (214) 461-9864 Ill'!! r~~~su.~ut!~o~t-. ~o'!s~Tf:!IRKINS October 31 , 2003 Ms, Carol Jackson Touch America 1710 Hwy 51 S, Suite 20 PMB 201 Decatur, Texas 76243 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Ms, Jackson: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas, If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be sending you a formal invitation to the meeting. If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions. Thank you for your cooperation and assistance. Sincerely, TEAGUE NALL AND PERKINS, INC. 11 tf~ Kyle Jones Cc: Ken Griffin, PE Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH A8RAMS ROAD, SUITE 506 DALLAS, TEXAS 75243 (2/4) 46r.9867 FAX (214) 461-9864 Ill'! r~~~s~~u~~~t-~ ~o'!s~Tf:!IRKINS October 31, 2003 Ms. Janice Scott Metromedia Fiber Network 5080 Spectrum Drive, Suite 800W Addison, Texas 75001 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Ms. Scott: Teague Nail & Perkins, Inc. is currently working on the final design for the above referenced project. In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas, If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be sending you a formal invitation to the meeting. If you do not receive an invitation from the city, please contact us at 214-461-9867, Please call me if you have any questions. Thank you for your cooperation and assistance, Sincerely, TEAGUE NALL AND PERKINS, INC. Jfl/~ Kyle Jones Cc: Ken Griffin, P.E, Director of Engineering & Public Works City of Coppell enclosures 72760 NORTH ABRAMS ROAD. SUITE 508 DALLAS. TEXAS 75243 (274) 461-9867 FAX (214) 46t.9864 1Il~ r~~~!l.~u~"t;,t-. ~o'!s~T!:!IRKINS October 31 , 2003 Mr. Jorge Barrera Comcast 934 E. Centerville Road Garland, Texas 75041 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppel! Road North City of Coppell, Texas Dear Mr. Barrera: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project. In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas, If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be sending you a formal invitation to the meeting. If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions. Thank you for your cooperation and assistance, Sincerely, TEAGUE NALL AND PERKINS, INC. I~J~ Kyle Jones Cc: Ken Griffin, P,E, Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH ABRAMS ROAD. SU//E SOB DALLAS. /EXAS 75243 (214) 46f.9867 FAX (214) 461-9864 r ""!~~~su.~u~"o~t-. ~o'!s~T!:!fRKINS October 31 , 2003 Mr. Bob Kearney Southwestern Bell 1430 Empire Central, Suite 110 Dallas, Texas 75247 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr, Kearney: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas, If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be sending you a formal invitation to the meeting. If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions. Thank you for your cooperation and assistance. Sincerely, TEAGUE NALL AND PERKINS, INC. Ifl~ Kyle Jones Cc: Ken Griffin, PE Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH ABRAMS ROAD, SUITE 50B DALLAS. TEXAS 75243 (214) 461.9867 FAX (214) 461-9864 Ill'! r~~~su.~ut!,,~t-~ ~!!sldT!:!IRKINS October 31, 2003 Mr. Don McKelvain Brazos Electric Coop P,O, Box 2585 Waco, Texas 76702-2585 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr. McKelvain: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project. In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas. If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be sending you a formal invitation to the meeting, If you do not receive an invitation from the city, please contact us at 214-461-9867, Please call me if you have any questions, Thank you for your cooperation and assistance. Sincerely, TEAGUE NALL AND PERKINS, INC. ''f'' d~ Kyle Jones Cc: Ken Griffin, P,E, Director of Engineering & Public Works City of Coppell enclosures 12160 NORrH A8RAMS ROAD, SUITE 508 DALLAS, TEXAS 75243 (214) 46/.9867 FAX (214) 461.9864 1Il~ r~~~s~~u~~o~t-. ~!!s~Tf:!RKINS October 31, 2003 Mr. Paul Gonzales QWEST Communications 1860 Lincoln St, Suite 200 Denver, Colorado 80202 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr, Gonzales: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas. If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be sending you a formal invitation to the meeting, If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions. Thank you for your cooperation and assistance, Sincerely, TEAGUE NALL AND PERKINS, INC. fit<< ~ Kyle Jones Cc: Ken Griffin, P.E, Director of Engineering & Public Works City of Coppell enclosures /2160 NORTH ABRAMS ROAD. SUITE 50B DALLAS. TEXAS 75243 (214) 461.9667 FAX (214) 461-9B64 Ill'!! r~~~s~~u~"o~t-. ~o'!s~Tf:!fRKINS October 31 , 2003 Mr. Reeves Partain Oncor 301 South Harwood, 6th Floor Dallas, Texas 75201 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr, Partain: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project. In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas. If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be sending you a formal invitation to the meeting. If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions, Thank you for your cooperation and assistance, Sincerely, TEAGUE NALL AND PERKINS, INC. /1' cf~ Kyle Jones Cc: Ken Griffin, PE Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH ABRAMS ROAD, SU/1E 508 DALLAS, TEXAS 75243 (214) 461.9867 FAX (214) 461.9B64 1Il~ r~~f:s~~u~1~f- ~ ~o'!s~Tf:!fRKINS October 31, 2003 Mr. John Wallak Oncor 301 South Harwood, 6th Floor Dallas, Texas 75201 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr. Wallak: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas. If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be sending you a formal invitation to the meeting. If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions, Thank you for your cooperation and assistance, Sincerely, TEAGUE NALL AND PERKINS, INC. /?" c:t~ Kyle Jones Cc: Ken Griffin, P.E, Director of Engineering & Public Works City of Coppell enclosu res 12160 NORTH ABRAMS ROAD. SUITE 50B DALLAS. TEXAS 75243 (2/4) 461-9867 FAX (214) 46f.9B64 Ill'!! r~~~su.~u~"o~t-) ~o'!s~Tf:!IRKINS October 31,2003 Mr. Richard Brewster Oncor 301 South Harwood, 6th Floor Dallas, Texas 75201 Re: West Sandy Lake Road Reconstruction S. H. 121 toCoppell Road North City of Coppell, Texas Dear Mr. Brewster: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project. In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas. If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be sending you a formal invitation to the meeting. If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions, Thank you for your cooperation and assistance. Sincerely, TEAGUE NALL AND PERKINS, INC. If'; tf~ Kyle Jones Cc: Ken Griffin, P.E, Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH A8RAMS ROAD. SUITE 508 DALLAS. TEXAS 75243 (214) 461-9867 FAX (214) 461-9864 Ill'! r~~~s~~u~"o~t> ~o'!s~Tf:!IRKINS October 31, 2003 Mr, Larry Reddick Oncor 1015 Hutton Drive Carrollton, Texas 75006 Re: West Sandy lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr. Reddick: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project. In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas, If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be sending you a formal invitation to the meeting, If you do not receive an invitation from the city, please contact us at 214-461-9867, Please call me if you have any questions. Thank you for your cooperation and assistance, Sincerely, TEAGUE NALL AND PERKINS, INC. M~ Kyle Jones Cc: Ken Griffin, P,E, Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH ABRAMS ROAD. SUITE 508 DALLAS, TEXAS 75243 (214) 46/.9867 FAX (214) 461-9864 1Il~ r~~f!su.~u~"o~f. ~o'!s~Tf:!RKINS October 31,2003 Mr. Jotm Pyles TEK Systems .805 Central Expressway South Suite 260 Allen, Texas 75013 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr. Pyles: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project In an effort to determine the impact of existing undergrol:lnd utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas, If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be sending you a formal invitation to the meeting. If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions, Thank you for your cooperation and assistance, Sincerely, TEAGUE NALL AND PERKINS, INC. ;r~ d~ Kyle Jones Cc: Ken Griffin, P.E. Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH ABRAMS ROAD. SUITE 508 DALLAS. TEXAS 75243 (214) 46/.9867 FAX (214) 461-9864 1Il~ r~~~su.~u~1~t-. ~o'!s~T!:!IRKINS October 31, 2003 Mr. David Reeves Oncor 300 S St. Pal!l Suite #302, EC3-042 Dallas, Texas 75201 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr. Reeves: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project. In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas, If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be sending you a formal invitation to the meeting, If you do not receive an invitation from the city, please contact us at 214-461-9867, Please call me if you have any questions. Thank you for your cooperation and assistance, Sincerely, TEAGUE NALL AND PERKINS, INC. Jfl Onz,?? Kyle Jones Cc: Ken Griffin, P,E, Director of Engineering & Public Works City of Coppell enclosures /2/60 NORTH ABRAMS ROAD. SUITE S08 OALLAS. TEXAS 7S243 (214) 461-9867 FAX (214) 461.9864 Ill'!! r~~~s~~u~~o~t-. ~o'!s~Tf:!RKINS October 31 , 2003 Mr. Rick Fielding Oncor 14400 Josey Lane Farmers Branch, Texas 75234 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppel! Road North City of Coppell, Texas Dear Mr. Fielding: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project. In an effort to determine the impact of existing underground utilities, we requestthat you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas. If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003. T he C it yo f C oppell should be sending you a formal invitation to the meeting, If you do not receive an invitation from the city, please contact us at 214-461-9867, Please call me if you have any questions, Thank you for your cooperation and assistance. Sincerely, TEAGUE NALL AND PERKINS, INC. ~~ rT~ Kyle Jones Cc: Ken Griffin, P.E, Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH A8RAMS ROAD, SUITE 508 OAlLAS. TEXAS 75243 (214) 461-9867 FAX (214) 461-9864 /Ill! r~~~sll,~ut!~o~t-, ~o'!s~Tf:!RKINS October 31, 2003 Mr. Jeff Curry Oncor 4200 N Belt Line Road Irving, Texas 75038 Re: West Sandy Lake Road Reconstruction S. H. 121 to Coppell Road North City of Coppell, Texas Dear Mr. Curry: Teague Nail & Perkins, Inc, is currently working on the final design for the above referenced project In an effort to determine the impact of existing underground utilities, we request that you review the attached construction plans and indicate, in writing, whether or not any of your existing utilities fall within the anticipated construction areas. If your records show that you have existing facilities within the affected sites that are not shown or are shown incorrectly on the plans, please prepare a mark-up copy of construction plans accurately depicting your facilities, If at all possible, I would like to have this information from you prior to the utility coordination meeting slated for November 13, 2003, T he City 0 f C opp>elll should be sending you a formal invitation to the meeting, If you do not receive an invitation from the city, please contact us at 214-461-9867. Please call me if you have any questions. Thank you for your cooperation and assistance, Sincerely, TEAGUE NALL AND PERKINS, INC. /r~~ Kyle Jones Cc: Ken Griffin, P.E, Director of Engineering & Public Works City of Coppell enclosures 12160 NORTH A8RAMS ROAD, SUITE 508 DALLAS. TEXAS 75243 (214) 461-9867 FAA (214) 461-9864