October 31,2003
Mr. Doug Brewer
Oncor
4200 N Belt Line Road
Irving, Texas 75038
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr. Brewer:
Teague Nail & Perkins, Inc. is currently working on the final design for the above
referenced project. In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas, If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be
sending you a formal invitation to the meeting, If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions, Thank
you for your cooperation and assistance,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
J1r d~
Kyle Jones
Cc: Ken Griffin, P,E,
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH A8RAMS ROAD. SUITE 508
DALLAS, TEXAS 75243
(214) 46/.9867
FAX (214) 461-9864
1Il~ r~~~su.~u~~o~t-. ~o'!s~Tf:!IRKINS
October 31, 2003
Mr. Bryan Williams
Oncor
P,O, Box 970
Fort Worth, Texas 76101-0970
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr. Williams:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project. In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, wio1ether or
not any of your existing utilities fall within the anticipated construction areas. If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be
sending you a formal invitation to the meeting. If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions. Thank
you for your cooperation and assistance,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
j{f1 J-~
Kyle Jones
Cc: Ken Griffin, PE
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH A8RAMS ROAD, SUITE 508
DALLAS. TEXAS 75243
(214) 461.9867
FAX (214) 46/.9864
.!! r~~~su.~u~"o~t-. ~o'!s~Tf:!IRKINS
October 31 , 2003
Mr. Bob Holland
Verizon
2094 McGee Lane
Lewisville, Texas 75038
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr. Holland:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas, If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be
sending you a formal invitation to the meeting. If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions, Thank
you for your cooperation and assistance.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
/1 tl~
Kyle Jones
Cc: Ken Griffin, P.E.
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH ABRAMS ROAD. SUITE S08
DALLAS. rEXAS T5243
(214) 461-9867
FAX (214) 461-9864
Ill'!! r~~~su.~ut!~o~t-. ~o'!s~Tf:!IRKINS
October 31 , 2003
Ms, Carol Jackson
Touch America
1710 Hwy 51 S, Suite 20 PMB 201
Decatur, Texas 76243
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Ms, Jackson:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas, If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be
sending you a formal invitation to the meeting. If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions. Thank
you for your cooperation and assistance.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
11 tf~
Kyle Jones
Cc: Ken Griffin, PE
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH A8RAMS ROAD, SUITE 506
DALLAS, TEXAS 75243
(2/4) 46r.9867
FAX (214) 461-9864
Ill'! r~~~s~~u~~~t-~ ~o'!s~Tf:!IRKINS
October 31, 2003
Ms. Janice Scott
Metromedia Fiber Network
5080 Spectrum Drive, Suite 800W
Addison, Texas 75001
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Ms. Scott:
Teague Nail & Perkins, Inc. is currently working on the final design for the above
referenced project. In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas, If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be
sending you a formal invitation to the meeting. If you do not receive an invitation from the
city, please contact us at 214-461-9867, Please call me if you have any questions. Thank
you for your cooperation and assistance,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
Jfl/~
Kyle Jones
Cc: Ken Griffin, P.E,
Director of Engineering & Public Works
City of Coppell
enclosures
72760 NORTH ABRAMS ROAD. SUITE 508
DALLAS. TEXAS 75243
(274) 461-9867
FAX (214) 46t.9864
1Il~ r~~~!l.~u~"t;,t-. ~o'!s~T!:!IRKINS
October 31 , 2003
Mr. Jorge Barrera
Comcast
934 E. Centerville Road
Garland, Texas 75041
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppel! Road North
City of Coppell, Texas
Dear Mr. Barrera:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project. In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas, If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be
sending you a formal invitation to the meeting. If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions. Thank
you for your cooperation and assistance,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
I~J~
Kyle Jones
Cc: Ken Griffin, P,E,
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH ABRAMS ROAD. SU//E SOB
DALLAS. /EXAS 75243
(214) 46f.9867
FAX (214) 461-9864
r ""!~~~su.~u~"o~t-. ~o'!s~T!:!fRKINS
October 31 , 2003
Mr. Bob Kearney
Southwestern Bell
1430 Empire Central, Suite 110
Dallas, Texas 75247
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr, Kearney:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas, If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be
sending you a formal invitation to the meeting. If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions. Thank
you for your cooperation and assistance.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
Ifl~
Kyle Jones
Cc: Ken Griffin, PE
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH ABRAMS ROAD, SUITE 50B
DALLAS. TEXAS 75243
(214) 461.9867
FAX (214) 461-9864
Ill'! r~~~su.~ut!,,~t-~ ~!!sldT!:!IRKINS
October 31, 2003
Mr. Don McKelvain
Brazos Electric Coop
P,O, Box 2585
Waco, Texas 76702-2585
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr. McKelvain:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project. In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas. If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be
sending you a formal invitation to the meeting, If you do not receive an invitation from the
city, please contact us at 214-461-9867, Please call me if you have any questions, Thank
you for your cooperation and assistance.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
''f'' d~
Kyle Jones
Cc: Ken Griffin, P,E,
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORrH A8RAMS ROAD, SUITE 508
DALLAS, TEXAS 75243
(214) 46/.9867
FAX (214) 461.9864
1Il~ r~~~s~~u~~o~t-. ~!!s~Tf:!RKINS
October 31, 2003
Mr. Paul Gonzales
QWEST Communications
1860 Lincoln St, Suite 200
Denver, Colorado 80202
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr, Gonzales:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas. If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be
sending you a formal invitation to the meeting, If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions. Thank
you for your cooperation and assistance,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
fit<< ~
Kyle Jones
Cc: Ken Griffin, P.E,
Director of Engineering & Public Works
City of Coppell
enclosures
/2160 NORTH ABRAMS ROAD. SUITE 50B
DALLAS. TEXAS 75243
(214) 461.9667
FAX (214) 461-9B64
Ill'!! r~~~s~~u~"o~t-. ~o'!s~Tf:!fRKINS
October 31 , 2003
Mr. Reeves Partain
Oncor
301 South Harwood, 6th Floor
Dallas, Texas 75201
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr, Partain:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project. In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas. If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be
sending you a formal invitation to the meeting. If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions, Thank
you for your cooperation and assistance,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
/1' cf~
Kyle Jones
Cc: Ken Griffin, PE
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH ABRAMS ROAD, SU/1E 508
DALLAS, TEXAS 75243
(214) 461.9867
FAX (214) 461.9B64
1Il~ r~~f:s~~u~1~f- ~ ~o'!s~Tf:!fRKINS
October 31, 2003
Mr. John Wallak
Oncor
301 South Harwood, 6th Floor
Dallas, Texas 75201
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr. Wallak:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas. If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be
sending you a formal invitation to the meeting. If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions, Thank
you for your cooperation and assistance,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
/?" c:t~
Kyle Jones
Cc: Ken Griffin, P.E,
Director of Engineering & Public Works
City of Coppell
enclosu res
12160 NORTH ABRAMS ROAD. SUITE 50B
DALLAS. TEXAS 75243
(2/4) 461-9867
FAX (214) 46f.9B64
Ill'!! r~~~su.~u~"o~t-) ~o'!s~Tf:!IRKINS
October 31,2003
Mr. Richard Brewster
Oncor
301 South Harwood, 6th Floor
Dallas, Texas 75201
Re: West Sandy Lake Road Reconstruction
S. H. 121 toCoppell Road North
City of Coppell, Texas
Dear Mr. Brewster:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project. In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas. If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be
sending you a formal invitation to the meeting. If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions, Thank
you for your cooperation and assistance.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
If'; tf~
Kyle Jones
Cc: Ken Griffin, P.E,
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH A8RAMS ROAD. SUITE 508
DALLAS. TEXAS 75243
(214) 461-9867
FAX (214) 461-9864
Ill'! r~~~s~~u~"o~t> ~o'!s~Tf:!IRKINS
October 31, 2003
Mr, Larry Reddick
Oncor
1015 Hutton Drive
Carrollton, Texas 75006
Re: West Sandy lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr. Reddick:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project. In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas, If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be
sending you a formal invitation to the meeting, If you do not receive an invitation from the
city, please contact us at 214-461-9867, Please call me if you have any questions. Thank
you for your cooperation and assistance,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
M~
Kyle Jones
Cc: Ken Griffin, P,E,
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH ABRAMS ROAD. SUITE 508
DALLAS, TEXAS 75243
(214) 46/.9867
FAX (214) 461-9864
1Il~ r~~f!su.~u~"o~f. ~o'!s~Tf:!RKINS
October 31,2003
Mr. Jotm Pyles
TEK Systems
.805 Central Expressway South
Suite 260
Allen, Texas 75013
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr. Pyles:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project In an effort to determine the impact of existing undergrol:lnd utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas, If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003, T he City 0 f C oppell should be
sending you a formal invitation to the meeting. If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions, Thank
you for your cooperation and assistance,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
;r~ d~
Kyle Jones
Cc: Ken Griffin, P.E.
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH ABRAMS ROAD. SUITE 508
DALLAS. TEXAS 75243
(214) 46/.9867
FAX (214) 461-9864
1Il~ r~~~su.~u~1~t-. ~o'!s~T!:!IRKINS
October 31, 2003
Mr. David Reeves
Oncor
300 S St. Pal!l
Suite #302, EC3-042
Dallas, Texas 75201
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr. Reeves:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project. In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas, If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003. T he City 0 f C oppell should be
sending you a formal invitation to the meeting, If you do not receive an invitation from the
city, please contact us at 214-461-9867, Please call me if you have any questions. Thank
you for your cooperation and assistance,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
Jfl Onz,??
Kyle Jones
Cc: Ken Griffin, P,E,
Director of Engineering & Public Works
City of Coppell
enclosures
/2/60 NORTH ABRAMS ROAD. SUITE S08
OALLAS. TEXAS 7S243
(214) 461-9867
FAX (214) 461.9864
Ill'!! r~~~s~~u~~o~t-. ~o'!s~Tf:!RKINS
October 31 , 2003
Mr. Rick Fielding
Oncor
14400 Josey Lane
Farmers Branch, Texas 75234
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppel! Road North
City of Coppell, Texas
Dear Mr. Fielding:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project. In an effort to determine the impact of existing underground utilities, we
requestthat you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas. If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003. T he C it yo f C oppell should be
sending you a formal invitation to the meeting, If you do not receive an invitation from the
city, please contact us at 214-461-9867, Please call me if you have any questions, Thank
you for your cooperation and assistance.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
~~ rT~
Kyle Jones
Cc: Ken Griffin, P.E,
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH A8RAMS ROAD, SUITE 508
OAlLAS. TEXAS 75243
(214) 461-9867
FAX (214) 461-9864
/Ill! r~~~sll,~ut!~o~t-, ~o'!s~Tf:!RKINS
October 31, 2003
Mr. Jeff Curry
Oncor
4200 N Belt Line Road
Irving, Texas 75038
Re: West Sandy Lake Road Reconstruction
S. H. 121 to Coppell Road North
City of Coppell, Texas
Dear Mr. Curry:
Teague Nail & Perkins, Inc, is currently working on the final design for the above
referenced project In an effort to determine the impact of existing underground utilities, we
request that you review the attached construction plans and indicate, in writing, whether or
not any of your existing utilities fall within the anticipated construction areas. If your
records show that you have existing facilities within the affected sites that are not shown or
are shown incorrectly on the plans, please prepare a mark-up copy of construction plans
accurately depicting your facilities,
If at all possible, I would like to have this information from you prior to the utility
coordination meeting slated for November 13, 2003, T he City 0 f C opp>elll should be
sending you a formal invitation to the meeting, If you do not receive an invitation from the
city, please contact us at 214-461-9867. Please call me if you have any questions. Thank
you for your cooperation and assistance,
Sincerely,
TEAGUE NALL AND PERKINS, INC.
/r~~
Kyle Jones
Cc: Ken Griffin, P.E,
Director of Engineering & Public Works
City of Coppell
enclosures
12160 NORTH A8RAMS ROAD, SUITE 508
DALLAS. TEXAS 75243
(214) 461-9867
FAA (214) 461-9864