Villages C P3&4-CS 891019DATE: October 19, 1989
CITY OF COPPELL
PLANNING & ZONING DEPARTMENT " (�
I A!''��
STAFF REPORT
RE: VILLAGES OF COPPELL, PHASE III - PRELIMINARY PLAT
LOCATION: Southeast corner of Allen Road and DeForest Road.
h ) JJ I
APPLICANT: Nathan Maier Engineers, Inc., representing Denton Creek
Joint Venture.
7
TRANSPORTATION:
A portion Allen Road along the west side of the property
has been c ed; the remaining portion will be
constructed by the developer. Developer will not be
required to pay pro -rata share for road construction and
drainage for DeForest Road as agreed by the City of Coppell
and BDC (Brooks Development Company).
SUMMARY: Applicant is requesting approval of a preliminary plat and
variances as requested.
1) To waive the alley requirement along lots as indicated
on plat.
2) To waive the zoning ordinance requirement that
structures in the (SF -0) zoning district be required
to be located within three feet of one side of lot
line. The developer would like to center houses on
the lots
Staff has no objections.
ALTERNATIVES: 1) Appro•ae the preliminary plat with variances.
2) Approve the preliminary plat but deny variances.
3) Deny the plat.
ATTACHMENTS: 1) Preliminary Plat
2) Release agreement between the City of Coppell and BDC
(Brooks Development C
VLGSSTF
_ /t-
Z&M 9
Minutes of October 19, 1989
Planning & Zoning Commission
Page 3
:�d"'.9�A�. l
It was brought up by the Commissioners that these lots seem to
be narrower than the lots in Northlake Woodlands. Mr. Allen
stated that this is the case due to economics.
The Commissioners raised questions regarding the zoning of this
property, as well as surrounding zoning. Mr. Allen stated that
the zoning of the actual property they are platting is (TC) Town
Center, a cumulative zoning, which does also include residential
zoning. The Commissioners were also concerned that this
development may cause the lot owned by Joe Dimock to become
landlocked. It was the consensus of the Commission that this
would have to be cleared up before the time of the final plat.
Questions were also raised regarding the screening wall and the
drainage of this property. Mr. Allen stated that there is a
storm sewer plan for this property, which would tie in and carry
down into the existing drainage easement. He further stated
that the screening wall will be brick, similar to the existing
one at the Park Meadow Addition. He stated that it has not
actually been designed yet; however, it will be at least six
feet, and will follow City ordinance. Mr. Allen also stated
that they do have landscaping planned for this area, as well as
right -of -way dedication planned. It was also brought up by the
Commission that there is a need for stub -outs.
Following discussion Commissioner Gross moved to deny the
preliminary plat for Park Place Addition. Commissioner Redford
seconded the motion; motion carried (7 -0) with Chairman Munsch
and Commissioners Green, Gross, Redford, Scott, Tunnell and
Weaver voting in favor of the motion.
Item 9: To consider a preliminary plat for Villages of Coppell, Phase
III, located at the southeast corner of Alien Road and DeForest
Road, at the request of Denton Creek Joint Venture.
P &Z Coordinator Taryon Bowman introduced the item to the
Commission. Ms. Bowman stated that the applicant is requesting
approval of a preliminary plat with the following variances:
1) To waive the alley requirement along lots as indicated on
the plat.
2) To waive the zoning ordinance requirement that structures
in the SF -0 zoning district be required to be located
within three feet of one side of the lot line. The
developer would like to center the houses on the lots.
Minutes of October 19, 1989
Planning & Zoning Commission
Page 4
r
Ms. Bowman further stated that a portion of Allen Road along the
west side of the property has been constructed, and that the
remaining portion will be constructed by the developer. She
also stated that the developer will not be required to pay the
pro -rata share for road construction and drainage for DeForest
Road as agreed by the City of Coppell and Brooks Development
Company.
Nathan Maier of Nathan Maier Engineers was present to represent
this item before the Commission. He stated that this is the
third phase of the Villages of Coppell Addition. He also stated
that they have reduced the 133 lots down to 101 lots, with a
typical lot size of 6,000 square feet, with a minimum lot size
of of 5,800 square feet. They will be building a typical house
size of 2,000 square feet, with a minimum house size of 1,600
square feet. He also stated that they are asking for a variance
in order to be allowed to center the houses on the lots.
In answer to Commissioners questions, Mr. Maier stated that the
lots are not big enough for (SF -7) zoning. He stated that they
will be building (SF -0); however, they want to center the homes
on the lots, and will therefore look more like an (SF -7)
product.
It was also brought up by the Commissioners that a stub -out
could be placed on DeForest Road. The Commissioners were also
concerned with access to the Warren property. Mr. Maier stated
that there is an access easement dedicated for this property.
Following discussion Commissioner Gross moved to approve the
preliminary plat for Villages of Coppell, Phase III, with
variances as requested. Commissioner Redford seconded the
motion; motion carried (7 -0) with Chairman Munsch and
Commissioners Green, Gross, Redford, Scott, Tunnell and Weaver
voting in favor of the motion.
DISCUSSION
Item 10: General discussion concerning platting and zoning issues.
Commissioner Weaver stated that the sub - committee to review the
Comprehensive Zoning Ordinance had been put on hold, and asked
that P &Z Coordinator Taryon Bowman give the Commissioners an
update on this project.