Loading...
Villages C P3&4-CS 911103e-.- MORRISON HYDROLOGY /ENGINEERING, INC. 520 AVENUE H EAST, SUITE 102 ARLINGTON, TEXAS METRO 817- 640 -4554 November 3. 1991 Ms. Shohre Daneshmond P.E. Acting City Engineer City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: VILLAGES OF COPPELL PHASES 3 & 4 REVIEW Dear Ms. Daneshmond: We completed an initial review of the subject study and encountered a number of problems. The Elm Fork of the Trinity and the Denton Creek Hec -2 models used in the study as existing condition did not match the latest models from the Coppell ongoing FIS study. There were no plots of water surface profiles included in the model. The floodplain and floodway delineations and proposed changes were shown in the Reclamation Plan but not not included in an overall map of the floodplain. A comparison between the existing and proposed fill model for the cross sections shown as being filled were identical. No fill was shown in the proposed fill model. We suggest a meeting to specify requirements and better detail our comments regarding the submitted study. We do not recommend approval of this study until further information is provided. If you need additional information, please call me. Sincerely, MORRISON HYDROLOGY /ENGINEERING, INC. Ronald W. Morrison, P.E. Senior Hydrologist CC: John Maggiore, Kimley -Horn and Associates, Inc.