Loading...
Villages CC 1-3-CS 850719Jim Sowell Company REAL ESTATE DEVELOPMENT a CONSTRUCTION 1112 Copeland Road, Suite 420 Arlington, Texas 76011 -4994 817/261 -4936 July 19, 1985 Ms. Caroline Morris Director of Planning City of Coppell P.O. Box 478 Coppell, Texas 75019 RE: Village at Cottonwood Creek, City Fees Dear Ms. Morris: Enclosed are checks for $47,624.00 and $8,707.00 required by the City of Coppell for the Village at Cottonwood Creek Sections I and II Final Plat. The amounts shown below were determined by Mr. John Wankum of Ginn and Associates: SECTION I: Park Fee Thweat Road Assessment Street Sign Fee Street Light Fee $ 10,200.00 34,095.00 719.00 2,610.00 SECTION II: Final Plat Fee Coppell Road Assessment Street Sign Fee Street Light Fee $ 47,624.00 $ 100.00 6,375.00 144.00 2,088.00 $ 8,707.00 Construction Permit Fees and Water and Sewer Availability Fees are addressed under separate cover. Sincerely, VILLAGE AT COTTONWOOD CREEK 2� <4 Tony elBalzo TDB /dmp