RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Russell:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boul The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972- 304 -7019.
Sincerely,
t a ('ov Suz T
CIP Coordinator
Enclosure D Lv/ V ^ , ^
C1r:
I QJ ° "'
APR 1, 7 ?003 MA!':;�C:-- - - - -1� B�
_- .
SWBT UTILITY v` "' , t E:RGT�
COORDINATOR
94,5 y JQZ4
255 PARKWAY * P.O. BOX 478 * CORRELL TX 75019 * TEL 972/462 0022 * FAX 9721304 3673
CIVIL PROJECT RESPONSE LETTER 2/19/2003
Company:THE CITY OF COPP.ELL
Attention:SUZAN C. TAYLOR
Project:DEFOREST ROAD LIFT STATION IMPROVEMENTS
Log #03041700
Wire Center - GTE
SBC Engineer:B KEARNEY -214- 745 -8224
Peer
J
�7
Rase 11
MANAGERQw�`
Utility Coordination
3 SBC Plaza, Rm. 2124
Dallas, TX 75202
SBC ENGINEER: PLE ASE COMPLETE FORM AND RFTURIN WITHIN 10 DAYS I I
Regardless of the selections made below, it is the Property Owner's or Contractor's
Responsibility to call one call, 1- 800 -344 -5377 to have all utilities located.
[-We have no facilities within the limits of construction.
❑ We have ❑ aerial ❑ buried ❑ conduit facilities that appear to be clear.
❑ We have ❑ aerial ❑ buried ❑ conduit facilities in conflict.
(Please contact our engineer to coordinate any necessary relocation)
❑ We are sending you plans showing SBC'S existing facilities.
❑ We are returning your prints with the annroximate location of SBC facilities marked in red.
❑ Please show SBC facilities in the profile where there may be a conflict.
❑ Utility Adjustments and/ or relocations appear to be required for this project, but payment for the
adjustments and/or relocations must first be received. SBC will begin the required work for the adjustments
and/or relocations upon receipt of payment of the anticipated costs or the execution of an agreement