Loading...
ST9902-CS031024 (3) INC. SICjC\-uZA V~{!\Jl~ In\q, TEAGUE NALL AND PERKINSJ'J'{"'. ENGINEERS # SURVEYORS # CONSULTANTS SJJ\o to ~~la..' 1100 Macon Street, Fort Worth, Texas 76102 (817) 336-5773 (817) 336-2813 FAX . MEMORANDUM To: From: Date: Re: Ken Griffin, PE-City of Coppell Jay Volk October 24, 2003 West Sandy Lake Road Project NOTE: FOLLOW-UP NOTES FROM THE MEETING ARE IN RED ITALICS, ATTENDANCE: Ken Griffen, PE, Oir, Of Engineering & Public Works - City of Coppell Suzan Taylor, C,IP Coordinator - City of Coppell Mike Jones, PE - TNP Jay Volk, PE - TNP Matt Atkins, E/, T - TNP I. Introduction of Plans a, Browse plans for broad explanation of design and some assumptions made during the preliminary design phase b, Highlight areas that may differ from schematic plans or that need additional detail during final design c, Location of signal lights - Pole locations at Royal Lane and State Road shall be conducive to future extension to the north. Ensure that mast arm lengths are adequate to provide left turn signalization for the ultimate roadway section. TNP to evaluate other options for the location of the pole in the median at Coppell Road North. d, Location of median openings in Royal Lane - Add median opening for southbound left turn into drive near Station 10+00. Relocate inlet on southbound lane to accommodate future drive to the west II. Transitions to existing pavements a, West end-four (4) lane extension to S,H, 121 TNP to pursue the 4-/ane transition to the northbound service road for SH 121 and coordinate with TxOOT b, East end-curb & gutter section No curb and gutter but divided with grass in the median. TNP to evaluate drainage options, including collecting runoff in the median area by creating a gentle swale and adding a grate inlet over future lateral line. III. Construction Sequencing Plan Page 1013 Need to provide pedestrian crossing from the Oakbend Addition to the north along Coppell Road Norlh Plans need to indicate that Coppell Road Norlh to be closed only during summer months when school is out City does not want a detour plan that promotes routing traffic through residential streets, TNP to re- evaluate the closure time for Coppell Road Norlh, IV. Pavement Marking Plan Suzan to check on revised standards regarding types/layout of buttons. Signage will be handled the same way as on East Sandy Lake Road, Speed limit will be the same as it is posted now. V. Existing Irrigation Systems This will be handled with a lump sum pay item and very specific language in the Specifications noting the locations of existing irrigation systems and clearly defining the Contractor's responsibility to preserve and protect the existing landscape improvements and to replace any landscaping that dies during construction. The City and Tnp will meet with HOA's at the appropriate time to coordinate and discuss options for proposed improvements, In parlicular, there are questions about the area in front of the Oakbend Addition. VI. Utility Coordination Date for quarlerly utility coordination meeting set as: November 13, 2003 at 2:00 pm. TNP to send preliminary plans to utility companies prior to meeting, Suzan and Matt to coordinate on utility contact information. a, Send utility companies copies of preliminary plans b, Coordination meeting c, Identify all conflicts d, Establish relocation schedule VII. Right of Way TNP to prepare right of way exhibit for the parcel on the southwest corner of West Sandy Lake Road and Royal Lane. All other parcels will be prepared when City has reviewed preliminary plans. a. Confirm limits/Parcels b, Schedule VIII. Landscape Issues a, Setup meeting with Parks Department & Newman, Jackson, Bieberstein, Inc, TNP to provide dates to Suzan for coordination of meeting IX. Public meeting Public meeting will be in the Spring of 2004 after construction schedule is determined. Suzan will check with Dallas County to determine if there will need to be any additional public meetings in order to comply with the County's public involvement process related to their cost parlicipation in Phase 2 of this project a, Datellocation b, Information/exhibits c, Format Page 2 013 x. Other Items a. TNP to determine if there will be any 404 issues related to breaching the dam and draining the pond for the proposed outfall channel across the Ferguson Realty property. b, Next meeting date: November 25, 2003 Page 3 013