Loading...
DR0301-EM031112E0304 SHADOW RIDGE ESTATES RETAINING WALL 11/12/2003 CITY OF COPPELL, TEXAS DR 03 -01 OLDEN PROFESSIONAL SERVICES, LP ENGINEER'S OPINION OF PROBABLE COST Item No. Description Quantity Units $ /Unit Total $ 1 Storm Water Pollution Prevention Plan 1 LS 3,000.00 3,000.00 2 Mobilization and Bond 1 LS 5,000.00 5,000.00 3 Site Preparation 1 LS 5,000.00 5,000.00 4 Site Restoration 1 LS 5,000.00 5,000.00 5 Tree Removal 1 LS 600.00 600.00 6 Remove and Dispose of Railroad Tie Retaining Wall 1 LS 5,000.00 5,000.00 7 Saw, Remove and Dispose of Concrete Slope Protection 1 LS 1,000.00 1,000.00 8 Compacted Fill 150 CY 25.00 3,750.00 9 18" Diameter Reinforced Concrete Piers 102 VF 100.00 10,200.00 10 Reinforced Concrete Beam / Pier Cap incl. Concrete InfiII 23 CY 350.00 8,050.00 11 Passive Soil Anchors 17 EA 650.00 11,050.00 12 3' x 3' PVC Coated Gabions 155 CY 155.00 24,025.00 13 Grouted Rock Flume 1 LS 1,000.00 1,000.00 14 Erosion Control Blanket 150 SY 5.00 750.00 $ 83,425.00