Loading...
DR0301-CS031111- - -� Suzan Tayl - Shadow Ridge Re taining Wall - Revised P Items &Qu antities Pa e 1 p+V. o? 0 From: "Joel Clark" < jclark @oldenps.com> To: "Suzan Taylor" <staylor @ci.coppell.tx.us> Date: 11/11/2003 2:28:37 PM Subject: Shadow Ridge Retaining Wall - Revised Pay Items & Quantities Suzan, Here is a revised spreadsheet for the pay items and quantities. As you will see, the Topsoil item has been eliminated since we are just seeding and installing erosion mat (instead of planting ground cover). Also, since it is such a small quantity, we have included the concrete infill between the reinforced concrete beam and uphill sawed edge of concrete slope protection in the "Reinforced Concrete Beam .." pay item. -Joel Joel R. Clark, P.E. Olden Professional Services, LP Ph. 972.294.5000 Fax: 972.294.2664 e -mail: jclark @oldenps.com SUMMARY OF QUANTITIES Item No. Description Quantity Units 1 Storm Water Pollution Prevention Plan 1 LS 2 Mobilization and Bond 1 LS 3 Site Preparation 1 LS 4 Remove and Dispose of Existing Trees 1 LS 5 Remove and Dispose of Railroad Tie Retaining Wall 1 LS 6 Saw, Remove and Dispose of Concrete Slope Protection 1 LS 7 Compacted Fill 150 CY 8 18" Diameter Reinforced Concrete Piers 102 VF 9 Reinforced Concrete Beam / Pier Cap including Concrete Infill 23 CY 10 Passive Soil Anchors 17 EA 11 3' x T PVC Coated Gabions 155 CY 12 Grouted Rock Flume 1 LS 13 Erosion Control Blanket 150 SY