Loading...
First Baptist-CS031113117137~3 lg:18 CITY OF COPPELL ENGR. DEPT. ~ 99?24628451 N0.894 COPPELL November 13, 2003 Brian Odom Starling Richmlson Construction i201 gas Drive, Suite D Richardson, TX 75081 VIA Fax (972) 462-8431 RE: Fimt Bapt/st Church Expansion Scheduling/Traffic ConSol Dear Mr. Odom: Per our discussions today you will begin working fi-om 10:00 p.m, to 6:00 a.m., with t~vo northbound lanes of Denton Tap Road closed in the following proposed phases, weather Mnr~dav. Nov~nber 17 - Sawcut pavement ~ - Demolition a~xl Excavmion W~sdav. Nowmber 19 - Fo~ s~it~ a~er mm~hola (contact the Pubic Worh ~p~cnt at 972-462-5155 for s~t~ sewer flow info.aeon. ~ovide L~ Davis wi~ yoor plus for rc~rccting ~c flow d~ing ~ons~ction of~e m~le). ~ - Po~ s~ita~ s~wcr m~olc a ~ber 24 -Remove fo~s, raise m~hole, ~b~fill (with flow~le fill?) Tu~~ -Sawcul md ~ pavement slab using TxDOT T~e K concrete mix (contact Al ~oon from ~DOT a 214-320-6191 for d~ails md pro.de M~ Da~s with a copy office mix dcsi~). /'h ad&tiun ,o ~e above, thc follo~ng itcms were discussed: 1. YOU have a,,~ to him off-duty police office' to dimat ~d div~ First Baptist Chinch U~mc ~ u~. Pl~se contact the ch~ch ~d ob~in a schedule of se~ices ~d ~ial or holiday related ~ents. 2, Because one of the n~ow no~hem ~veways ~11 be demoliih~ md rebuilt, you have a~d w place aiwa. f~ing internal to the pwpeny, indica~ng that ~e rem~aing n~-ow driv~ay is for ~ntonng vehlel~a only (s~ attached enhibit). This 19:18 CiTY OF COPPELL ENGR. DEPT. ~ 99724628431 N0.894 Q02 will allow the church and the adjacent properly to the north ~ccess to the median opening in Denton Tap Road at 'all times during thc project. If the signs do not providc adeClUete control of the driveway, it may become necessary to ~ost additional signs and/or mini thc driveway with your personnel for added control A light tower will be used during evening ho~s ~1 will bc located on the church proper~y fating cast (see attached exhibit) The light will be tilled such that the work is able to be completely in a safe and timely manner with minimal disruption to local residents. At no lime shall the light be faced into on,ming traffic. Denton Tap Road will not be reduced to less than t~vo lanes at any time between 6:00 a.m. and 10:00 p.m. All excavated areas must be plated to allow i'or efficient traffic flow. 5. I/your schedule chaslges for ANY reason, please contact Larry Davis or me to make alternate arrangements, Thc EngiXlcerin8 Dcparlmcnt mainlaln~ comslxuct~on postings on the City's webp~ge and requires adequate notice in order to keep the ir~'ormation up-to-date, If you are in agree~ent with all conditions stated above, please sign and date the'top of this letter o~r~d fax it lo me as soon ss possible. If you have any questions or concerns, please do not h~itate to contact me. Sin~exely, Teresa Turner Graduate Engineer Office Phone: (9'72) 304-3681 le~x: (972) 30~-3570 Ken Griffin, Di~'ector of Engineering & Public Worlcs Larry Davis, Const~'uefion h~speetor FIRST BAPTIST CHURCH EXPANSION Due to the expansion of the First Baptist Church, various northbound lanes of Denton Tap Road will be closed for constrnction, weather permitting, according to the following schedule: Monday, November 17 Tuesday, Nove~nber 18 Wednesday, November 19 Thursday, November 20 Monday, November 24 Tuesday, November 25 10:00 p.m. to 6:00 a.m. 10:00 p.m. to 6:00 a.m. 10:00 p.m. to 6:00 a.m. 10:00 p.m. to 6:00 a.m. 10:00 p.m. to 6:00 a.m. 10:00 p.m. to 6:00 a.m. 2 northbound lanes closed 2 northbound lanes closed 2 northbound lanes closed 2 northbound lanes closed 2 northbound lanes closed 2 northbound lanes closed Starting Wednesday, November 26 thru December 15 9:00 a.m. to 3:00 p.m. I lane northbound closed If you have any questions, please contact the Engineering Department at 972-304-3679.